CHAIRMAN’S LETTER
Dear Shareholder
Please find attached our Quarterly Activities Report for 31 March 2015 and the associated
Statement of Cashflow.
The northern Australia wet season extending from December to April curtails our exploration
but provides a period in which we can review what was achieved in the previous exploration
season and plan the eight-month, exploration campaign that lies ahead.
While some good grade intersections were obtained from drilling in 2014 none of the prospects
tested yielded intersections of both grade and width warranting direct follow up drilling. Three
significant achievements of 2014 were:
•
showing that radon decay isotopes are preserved in the thick sandstones overlying
basement-hosted, uranium deposits and provide pathfinders to these concealed
deposits. This technology, developed in conjunction with CSIRO, provides the first key to
successfully exploring the 50% of our tenements and the large areas of the Alligator
Rivers Uranium Province covered by thick sandstone. We have exclusive use of this tool;
•
showing that sharper, stronger electro-magnetic responses are derived from conductive
minerals associated with uranium deposits hosted in the basement rocks but covered by
thick sandstone when using very high-energy, hybrid ground-airborne, geophysical
surveys. This innovation by the company provides the second key to making discoveries
in the areas covered by thick sandstone. Alligator Energy be will the first to apply these
two “game-changing” tools to the search for concealed uranium deposits in the Province;
and
•
obtaining access to the prospective Beatrice tenement of Cameco through an earn-in
agreement.
This quarter our work has been focussed on assessing the potential of all targets (outcropping
and concealed) within our tenements to yield a minimum resource of 100 million pounds of
U3O8. We identified 28 targets, grouped them into eight sets and ranked both the sets and the
targets within each set. An example from the top three sets is given below.
1
Set 1: Outcropping Uranium Deposits: The Beatrice deposit was discovered in the early 1970’s
by QML following up a surface uranium radiometric feature. Drilling of north-east/south-west
trending breccia zones yielded some high-grade intersections. Drilling by Cameco in 2009, and
confirmed by our analyses of their drill core, similarly yielded some good grade intersections.
Our interpretation shows the drill holes with good and high grade uranium intersections are
confined within part of a 600 metre long, north-south trending conductor. All holes outside of
this conductor failed to intersect mineralisation. Most of this conductor remains undrilled. It
represents a good target to be tested in 2015.
Set 2: Unexplained uranium or uranium decay element radiometric anomalies: The sources of
six uranium or radon radiometric anomalies in or on the basement identified in legacy data
remain to be located. These anomalies range from a few hundred to 2500 metres long and
from weak to intense. They may represent the direct or transported responses from uranium
mineralisation. We will seek the source of each in the coming field season.
Set 3: Radon Decay Isotope Features: The TCC2 target appears as a 3500 metre long zone of
anomalous radon decay products in thick sandstone covering host basement rocks. It has a
core of higher values. Nearby radon-rich springs drain from the base of the sandstone. Nearby
drill holes in the exposed basement rocks from our 2014 campaign contained uranium. We
need to precisely define and drill test this target in 2015.
2
Our exploration team has commenced the 2015 field season and it is expected that by the end
of the April-June quarter will have completed the geochemical and isotope pathfinder sampling
as well as the high-energy, hybrid ground/airborne geophysical surveys needed to define the
drill targets at many of the targets in the inventory. From these the best few will be selected for
drill testing in the July-September quarter. The drilling plan and budget will be prepared in June.
We believe that in 2014 we developed the tools capable of changing the uranium exploration
“game” in the Alligator River Uranium Province. In 2015 we will apply those while retaining our
minimum resource size, one commodity and one Province focus.
Yours sincerely
John Main
Chairman
29 April 2015
3
QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 31 March 2015
HIGHLIGHTS
EXPLORATION
•
Over 20 targets including eight priority targets have been defined for progression in the
2015 exploration program covering the TCC, Beatrice and Mamadawerre Project areas.
The eight priority targets meet Alligator’s criteria to host large uranium deposits (>100Mlb
U3O8). Alligator is committed to drill testing three to five of these targets in 2015.
•
Results from laboratory analyses of Beatrice Prospect drill core were received and defined
an interval of 19 metres @ 3,626ppm U3O8 from five metres below surface in historic drill
hole BTD0273 which had previously not been continuously analysed. The Beatrice
Prospect is one of three priority targets that will be fast tracked for drilling in 2015 on the
Beatrice JV Project area.
•
Helicopter-borne VTEM survey results were received for the Mamadawerre JV Project area.
EM anomalies identified by this survey are currently being modelled.
•
The Company continued its involvement with local community and environmental programs.
•
Work continued on Alligator’s R&D program, investigating improved techniques for targeting
unconformity uranium deposits covered by thick sandstone.
CORPORATE
•
•
The Company maintains a solid cash position, of $2.75m at 31 March 2015.
Subsequent to quarter end the Company received $470k from the ATO in relation to the
2014 R&D Offset
Alligator Energy
ABN 79140575604
Suite 3
36 Agnes Street
Fortitude Valley, QLD
4006
Ph: (07) 3852 4712
Fax: (07) 3852 5684
ASX Code: AGE
Number of Shares:
311.2M Ordinary
Shares
14.2M Unlisted
Options
Board of Directors:
Mr John Main
(Chairman)
Mr Robert Sowerby
(CEO, Director)
Mr Paul Dickson
(Non Exec.
Director)
Mr Peter McIntyre
(Non Exec.
Director)
Mr Andrew Vigar
(Non Exec.
Director)
JUNE QUARTER WORK PROGRAM
•
•
•
•
•
Commencement of field work in April/May 2015 following annual NLC consultation meetings.
Re-establishment of camp and access for 2015 drill program.
Definition of drill targets at priority target areas utilizing leading edge SAM and Fixed Loop EM survey techniques.
Ground follow up of priority target areas on the Beatrice and Mamadawerre JV project areas using radiogenic isotope
pathfinder sampling techniques, and field investigation of the Beatrice Uranium prospect.
Continuation of radiogenic isotope R&D study.
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 31 March 2015
2
EXPLORATION ACTIVITIES
Overview
During the March quarter Alligator Energy focused on planning for the Company’s 2015 exploration programs
across its three uranium Project Areas; Tin Camp Creek, Beatrice and Mamadawerre, in Arnhem Land, in the
Northern Territory (see Figure 1).
Through a rigorous evaluation process Alligator has identified eight priority targets for detailed geophysics and
ground follow up before final drill target selection. Consistent with the Company’s strategy, Alligator is
committed to drill testing three to five of the priority target areas during 2015, each of which is considered to
have favourable geological, geochemical and spatial characteristics for hosting large uranium deposits
(>100Mlb U3O8 ).
In addition, a series of over 20 other Targets have been identified for ground follow up. These targets have
been identified as having favourable geological, structural and geophysical characteristics, however only
limited, if any, drilling has been undertaken to determine whether anomalous uranium and/or radiogenic
pathfinders are present. The work undertaken in 2015 will assess these targets in greater detail and progress
them as possible drill targets for 2016.
Field work is expected to commence in April 2015 and will involve the re-establishment of access tracks and reopening the Myra Camp. The exploration work will be focussed on defining precise drill targets within the
priority target areas. Detailed geophysical surveys will be undertaken on each of these target areas in the June
Quarter to ensure accurate drill targeting so that drilling can commence in June. A pattern of nine drill holes is
proposed to test each target selected as having the potential to host 100 million pounds of U3O8.
Figure 1: 2015 Priority Target Areas (magenta colouring)
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 31 March 2015
3
March Quarter Exploration Activities - Tin Camp Creek Project
Priority targets for the 2015 field season within the Tin Camp Creek project are TCC2, TCC4, and TCC13 (see
Figure 1). Targets have been prioritised on the basis of having strong uranium and radiogenic isotope
anomalism, favourable host rocks and structures.
Target TCC2, is a sandstone covered target that has never been drilled. It is characterised by strong radiogenic
isotope anomalism in sandstone at surface and deep basement SAM features identified during the 2014 field
season. Located to the north of Orion North prospect, Target TCC2 also presents as a possible source for
radiogenic springs observed at Orion North.
Target TCC4, located west of the South Horn prospect, is characterised by coincident strong surface radiogenic
isotope anomalism and SAM conductors beneath sandstone cover. Strong downhole radiogenic isotope
signatures and intense chlorite alteration were encountered east of TCC4 in holes drilled in 2014.
Target TCC13 is characterised by a complex structural setting, presence of chlorite altered schists of the Cahill
Formation, known uranium mineralisation (Mintaka prospect – up to 1m @ 2299ppm U3O8 refer ASX
announcement 21st October 2014) and radiogenic isotope anomalies. A prominent conductor north of Mintaka is
encompassed in the TCC13 target area.
March Quarter Exploration Activities – Beatrice Project
The Beatrice Project is a Joint Venture between Alligator and Cameco Australia Pty Ltd (Cameco) where
Alligator may earn a 51% interest in the project by expending $250,000 by 2 July 2016.
Core from three diamond drill holes drilled by Cameco in 2009 at the Beatrice Prospect has been sampled and
assayed by Alligator on a systematic basis. The holes were analysed by Alligator on one metre intervals
through the zones identified as radiogenic by Cameco using downhole gamma probe techniques supported by
intermittent laboratory analysis.
Our analyses confirm ore grade x width uranium mineralisation (where the width x uranium content exceeds five
metre %). An interval of 19 metres at 3,626ppm U3O8 from five metres below surface was returned from drill
hole BTD0273 (Refer ASX Announcement 13th March 2015). An additional 5 metre interval (from surface to 5m)
of significant uranium mineralisation is also evident in existing core samples, however accurate grade reporting
is not possible in this interval due to core loss in highly weathered surface material.
Sporadic mineralisation (less than 1,000ppm U3O8) was also identified in drill hole BTD0275. Details of assays
are provided in Table 1 and the location of drill holes is shown on Figure 2.
The Beatrice Prospect was discovered in 1971 by Queensland Mines Limited (QML). QML completed six drill
holes and limited costeaning in the area of the outcropping mineralisation. A best intersection of 7m @ 2.8%
(28,000ppm) U3O8 is recorded in their reports. However further ground work is required to validate the exact
location of the QML 1971 drill holes.
Alligator has also reviewed previous geophysical work over the Beatrice Prospect and the surrounding area
including high quality airborne magnetic, radiometric and electromagnetics (EM) surveys. In addition, a detailed
Sub-Audio Magnetic (SAM) survey was completed over the Beatrice Prospect area in 2009. This survey
identified a 600m long north-south trending SAM conductor. The ore grade x width mineralisation intersected by
Cameco and Queensland Mines occurs at the southern end of this SAM conductor and is spatially coincident
with it. Holes drilled outside this conductor did not intersect mineralisation. The northern 500m of the SAM
feature has not been drill tested. Alligator plans to drill test this northern trending conductor in 2015.
Previous radiometric surveys also indicate radiometric anomalism extending south of existing drilling. This has
not been drilled tested.
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 31 March 2015
4
MGA 94
Easting
MGA 94
Northing
Azimuth
(Mag)
Hole ID
Prospect
Dip
BTD0273
Beatrice
304337
8604275
326
-65
BTD0274
Beatrice
304334
8604289
154
-60
BTD0275
Beatrice
304346
8604258
325
Metres
from
Surface
Length
(metres)
Grade (ppm
U3O8)
5
19
3,626
No Significant Assays
-65
89
1
528
and
98
1
308
Table 1. Beatrice Assay Results – March 2015 ( JORC Table 1 provided in ASX announcement 13th March
2015)
Figure 2: Beatrice Prospect Assay Location on SAM geophysics
The Beatrice Prospect is considered a high priorirty drilling target for 2015. Initial field work is scheduled for
April 2015.
Additional to the Beatrice Prospect, two other targets, BT1 and BT3 have been identified for detailed follow up,
including geophysics, and possible drill testing in 2015.
Target BT1 is characterised by a large untested airborne radiometric anomaly and proximity to the Beatrice
Fault zone. Target BT3 comprises the Beatrice prospect environs, inclusive of key structural extensions and
three discrete radiometric anomalies.
March Quarter Exploration Activities - Mamadawerre Project
The Mamadawerre Project area consists of EL27251, held 100% by Northern Prospector Pty Ltd (a 100%
owned subsidiary of Alligator Energy Ltd), and the adjoining Mamadawerre JV (EL24992), which is a joint
venture between Cameco Australia Pty Ltd (Cameco) and Alligator. Alligator may earn up to 90% of the
Mamadawerre JV project.
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 31 March 2015
5
Final processed data from the 2014 helicopter-borne VTEM survey was received in the March quarter. The
survey was designed to identify alteration zones indicative of both unconformity style and sandstone hosted
uranium mineralisation within the sandstone cover rocks and the underlying basement lithologies along the
Steptoe Fault zone.
Interpretation of data is ongoing with geophysical consultants, initial indications suggest conductive units, within
basement lithologies, parallel to the NE trending Goomadeer Fault zone close to its intersection with the
Steptoe fault zone. This area, target MW1, will be subject to field investigation during Q2 2015 (see Figure 4 )
Results from tenement wide rock chip sampling have returned some discrete anomalous radiogenic isotope
ratios. These areas are earmarked for gridded rock chip isotope surveys during Q2.
Figure 3 Mamadawerre Project area – VTEM survey areas MW1, MW2 and MW3 showing conductivity
(Ch28).
Community and Environment
In March, the company finalised plans for regional weed control programs to commence in April in consultation
with the NLC, Wardekken Land Management and Traditional Owners. As part of its community and
environmental engagement, Alligator Energy has been involved with local, collaborative weed control efforts
targeting Mission Grass infestations in the region for the past three years. The company remains committed to
supporting local community projects through partnerships and looks forward to a positive year in the West
Arnhem Land area.
Research and Development
Work continued on R&D activities during the March Quarter. This partnership is investigating improved
techniques for exploration targeting for unconformity uranium deposits. Work during the period focused on
trialling specific geochemical analytical techniques to delineate halos surrounding uranium deposits using
samples obtained from the broader Caramal area during 2012 and 2013. The current phase of this research
project is expected to be completed in May 2016.
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 31 March 2015
6
CORPORATE
Cash at Bank
The Company has maintained a sound cash position and as at 31 March 2015, had cash reserves of $2.75
million. Further details of the cashflows for the quarter are included in the Appendix 5B.
Research & Development Tax Offset
The Company has been conducting a research program in the Alligator Rivers Uranium Province with the
objective of developing techniques that assist in identifying unconformity uranium deposits. The R&D Tax Offset
claim for the 2014 financial year (which is associated with this program of work) was received shortly after the
end of the March quarter and totaled $470k.
Directors’ Fee Plan
In November 2014 shareholders approved the implementation of a Directors’ Fee Plan where directors have the
option, on a quarterly basis, to receive a portion or all of their remuneration in shares in lieu of a cash payment.
During the quarter 1,125,000 shares were issued in lieu of directors’ remuneration totaling $29k.
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 31 March 2015
7
Competent Person’s Statement
Information in this report is based on current and historic Exploration Results compiled by Mr Rob
Sowerby who is a Member of the Australasian Institute of Geoscientists. Mr Sowerby is CEO and
Director of Alligator Energy Ltd, and has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity he is undertaking to
qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Sowerby consents to
the inclusion in this release of the matters based on his information in the form and context in
which it appears.
About Alligator Energy
Alligator Energy Ltd is an Australian, ASX listed, exploration company with uranium exploration
tenements in the world class Alligator Rivers Uranium Province in Arnhem Land, Northern
Territory. The Alligator Rivers Uranium Province hosts nearly 1 billion pounds of high grade
uranium resources and past production, including the Ranger Mine and Jabiluka. Since listing in
February 2011, the company has completed in excess of 15,000m of drilling, defined a maiden high
grade, JORC compliant resource at Caramal (6.5Mlb U3O8 at 3100ppm U3O8) and discovered new
mineralization at Mintaka and Orion East. High Grade mineralization also occurs at the historic
South Horn and Gorrunghar prospect which remain only partially tested.
The company has in excess of 1000km2 of Exploration Licence applications and is also in Joint
Venture with Cameco Australia Pty Ltd for the Mamadawerre Project and Beatrice Project, also
within the Alligator Rivers Uranium Province.
Project Location Diagrams
FOR FURTHER INFORMATION, PLEASE CONTACT
Mr Rob Sowerby
Chief Executive Officer
Alligator Energy Ltd
Email: info@alligatorenergy.com.au
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 31 March 2015
8
Appendix 5B
Mining exploration entity quarterly report
Rule 5.3
Appendix 5B
Mining exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10
Name of entity
ALLIGATOR ENERGY LTD
ABN
Quarter ended (“current quarter”)
79 140 575 604
31 March 2015
Consolidated statement of cash flows
Cash flows related to operating activities
1.1
Receipts from product sales and related
debtors
1.2
Payments for (a) exploration & evaluation
(b) development
(c) production
(d) administration
Dividends received
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes (paid)/ received- R&D
Other (provide details if material)Collaborative Geophysics Grant
1.3
1.4
1.5
1.6
1.7
Current quarter
$A’000
Year to date
$A’000
-
-
(106)
(196)
28
(2,937)
(724)
54
-
558
-
35
(274)
(3,014)
(2)
20
18
(83)
20
(256)
(3,077)
Net Operating Cash Flows
1.8
1.9
1.10
1.11
1.12
1.13
Cash flows related to investing activities
Payment for purchases of: (a) prospects
(b) equity investments
(c) other fixed assets
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
Loans to other entities
Loans repaid by other entities
Other - Security Deposits
Net investing cash flows
Total operating and investing cash flows
(carried forward)
+ See chapter 19 for defined terms.
17/12/2010 Appendix 5B Page 1
(63)
Appendix 5B
Mining exploration entity quarterly report
1.13
(256)
(3,077)
29
29
4,071
(289)
3,782
Net increase (decrease) in cash held
(227)
705
1.20
1.21
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
2,981
2,049
1.22
Cash at end of quarter
2,754
2,754
1.14
1.15
1.16
1.17
1.18
1.19
Total operating and investing cash flows
(brought forward)
Cash flows related to financing activities
Proceeds from issues of shares, options, etc.
Proceeds from sale of forfeited shares
Proceeds from borrowings
Repayment of borrowings
Dividends paid
Other - Capital Raising Costs
Net financing cash flows
Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the
related entities
Current quarter
$A'000
1.23
Aggregate amount of payments to the parties included in item 1.2
90
1.24
Aggregate amount of loans to the parties included in item 1.10
Nil
1.25
Explanation necessary for an understanding of the transactions
Directors’ fees, salaries and superannuation totalled $90k before amounts then used to subscribe for ordinary
shares in the Company under the Directors’ Fee Plan approved at the AGM on 21 November 2014 which
totalled $29k.
Non-cash financing and investing activities
2.1
Details of financing and investing transactions which have had a material effect on
consolidated assets and liabilities but did not involve cash flows
Nil
2.2
Details of outlays made by other entities to establish or increase their share in projects in
which the reporting entity has an interest
Nil
+ See chapter 19 for defined terms.
Appendix 5B Page 2
17/12/2010
Appendix 5B
Mining exploration entity quarterly report
Financing facilities available
Add notes as necessary for an understanding of the position.
3.1
Loan facilities
3.2
Credit standby arrangements
Amount available
$A’000
-
Amount used
$A’000
-
-
-
Estimated cash outflows for next quarter
$A’000
823
4.1
Exploration and evaluation
4.2
Development
-
4.3
Production
-
4.4
Administration
172
Total
995
Reconciliation of cash
Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows)
to the related items in the accounts is as follows.
5.1
Cash on hand and at bank
5.2
Deposits at call
5.3
Bank overdraft
5.4
Other (provide details)
Current quarter
$A’000
Previous quarter
$A’000
445
690
2,309
2,291
-
-
-
-
2,754
2,981
Total: cash at end of quarter (item 1.22)
Changes in interests in mining tenements
Tenement
reference
6.1
Interests in mining
tenements relinquished,
reduced or lapsed
NIL
6.2
Interests in mining
tenements acquired or
increased
NIL
+ See chapter 19 for defined terms.
17/12/2010 Appendix 5B Page 3
Nature of interest
(note (2))
Interest at
beginning
of quarter
Interest at
end of
quarter
Appendix 5B
Mining exploration entity quarterly report
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
Total number
7.1
7.2
7.3
7.4
7.5
7.6
7.7
Preference +securities
(description)
Changes during quarter
(a) Increases through
issues
(b) Decreases through
returns of capital, buybacks, redemptions
+Ordinary securities
Changes during quarter
(a) Increases through
issues
(b) Decreases through
returns of capital, buybacks
+Convertible debt
Number
quoted
NIL
NIL
310,531,959
310,531,959
1,125,000
2,747,059
1,125,000
2,747,059
-
-
NIL
NIL
securities (description)
Changes during quarter
(a) Increases through
issues
(b) Decreases through
securities matured,
converted
Options (description
and conversion factor)
Amount paid
up per security
(see note 3)
(cents)
2.6 cents
0 cents
2.6 cents
0 cents
Exercise price
Expiry date
6,250,000
2,000,000
700,000
1,000,000
2,205,882
-
$0.20
$0.25
$0.15
$0.00
$0.00
21 Nov 2015
30 Nov 2015
7 Mar 2017
2 May 2017
26 Nov 2017
$0.00
$0.00
-
7.8
7.9
7.10
Issued during quarter
Exercised during quarter
Expired during quarter
2,747,059
458,823
-
7.11
Debentures
(totals only)
Unsecured notes (totals
only)
NIL
NIL
NIL
NIL
7.12
Issue price per
security (see
note 3) (cents)
-
+ See chapter 19 for defined terms.
Appendix 5B Page 4
17/12/2010
Appendix 5B
Mining exploration entity quarterly report
Compliance statement
1
This statement has been prepared under accounting policies which comply with
accounting standards as defined in the Corporations Act or other standards
acceptable to ASX (see note 5).
2
This statement does give a true and fair view of the matters disclosed.
Mike Meintjes
Company Secretary
29 April 2015
Notes
1
The quarterly report provides a basis for informing the market how the entity’s
activities have been financed for the past quarter and the effect on its cash
position. An entity wanting to disclose additional information is encouraged to
do so, in a note or notes attached to this report.
2
The “Nature of interest” (items 6.1 and 6.2) includes options in respect of
interests in mining tenements acquired, exercised or lapsed during the
reporting period. If the entity is involved in a joint venture agreement and
there are conditions precedent which will change its percentage interest in a
mining tenement, it should disclose the change of percentage interest and
conditions precedent in the list required for items 6.1 and 6.2.
3
Issued and quoted securities The issue price and amount paid up is not
required in items 7.1 and 7.3 for fully paid securities.
4
The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of
Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.
5
Accounting Standards ASX will accept, for example, the use of International
Financial Reporting Standards for foreign entities. If the standards used do not
address a topic, the Australian standard on that topic (if any) must be complied
with.
== == == == ==
+ See chapter 19 for defined terms.
17/12/2010 Appendix 5B Page 5
Share your feedback
Discover