EXPLORATION
Shallow uranium exploration drilling underway at the Beatrice Project in
the NT
Drilling testing strong geophysical targets below alluvial cover
Ph: (07) 3852 4712
Fax: (07) 3852 5684
ASX Code: AGE
Drilling expected to be completed in early November
Number of Shares:
350.9M Ordinary Shares
16.2M Unlisted Options
CORPORATE
Greg Hall, a senior resource industry executive with significant uranium
sector experience, joined the Company as a non-executive director
AGE earned 51% of the Beatrice JV uranium project after completing
exploration expenditure of $250,000 and committed to Stage 2
Support by over 50% of shareholders of the 1:4 Rights Issue raising
$1.6m
Two non-executive directors committed to subscribing for additional
Board of Directors:
Mr John Main
(Chairman)
Mr Robert Sowerby
(CEO, Director)
Mr Paul Dickson
(Non Exec. Director)
Mr Peter McIntyre
(Non Exec. Director)
ordinary shares at the Rights Issue price totalling $110,000
Mr Andrew Vigar
(Non Exec. Director)
Mr Greg Hall
(Non Exec. Director)
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 30 Sept 2015
1
EXPLORATION
Beatrice Project
A 3,500 metre shallow geochemical drilling program commenced in September in the Alligator
Rivers region of the Northern Territory.
The BT-1, BT-4 and Beatrice Prospect targets are radiometric and conductor features in the
basement and are covered by shallow alluvial and colluvial sediments. The air-core drilling
program is designed to test for anomalous geochemical responses, mineralisation and alteration
under these sediments.
An additional priority target has been defined under Kombolgie Sandstone to the north of BT-1.
The BT-8 target is defined by a coincident SAM/TFEM and radiogenic isotope anomaly and adds
to the existing set of three Kombolgie sandstone covered targets to be drill tested in 2016
The 2015 drilling campaign began on September 8, 2015, at the BT-4 prospect. Drilling targeted
a strong, north-south trending SAM conductor extending over 1,000 metres. The BT-4 anomaly is
located two kilometres north of the Beatrice Prospect along strike from the SAM (Sub Audio
Magnetics) conductor, magnetic and uranium mineralisation and soil anomalism that defines the
Beatrice drill target. The target is concealed by sands which render traditional spectrometer and
geochemical sampling, as well as radiogenic isotope sampling, ineffective.
Eleven shallow (maximum depth 34 metres) air-core drill holes were completed on three traverse
lines to test a SAM geophysical target (refer Figure 2). Drilling has intersected a fault zone with
associated alteration. While alteration and the fault zone were accurately defined by the SAM
anomaly, the basement rock types no significant uranium mineralisation has been intersected.
The contact with basement lithologies more likely to host mineralization is now considered further
to the north of existing drilling. The results of this latest drilling will be further assessed before
undertaking future drilling at BT-4.
As of the 30th September, shallow air-core drilling was underway at the Beatrice prospect to test a
potential southerly extension to previously discovered high-grade mineralisation which included
19m@3,626ppm (0.36%) U3O8 (ASX announcement- 15th March 2015). Soil and ground
radiometric surveys completed over Beatrice prospect show strong uranium (>100ppm U3O8)
and strong radiogenic isotope anomalies extending more than 200 metres south from the known
high-grade mineralisation to the edge of younger cover material (ASX announcement- 5th August
2015).
The BT-1 target will be the final target tested during this phase of drilling. Drilling at BT-1 will be
testing a very strong, shallow, east-west trending SAM conductor extending over 4,000 metres
and associated with a known strong uranium radiometric anomaly but covered by thin, alluvial
material. Drilling is planned to collect weathered bedrock geochemical samples from beneath the
young alluvial material for radiometric/geochemical analysis. Identification of anomalous uranium
and strong alteration will be considered a highly positive result.
Drilling is expected to be completed in early November with assay results to be reported in late
November. Due to the shallow nature of drilling in oxidized rock types, reporting of gamma
logging is not considered reliable due to disequilibrium effects. Laboratory analysis for uranium is
considered the only appropriate measure for these sample types and therefore results will be
reported only when final assay results have been received.
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 30 Sept 2015
2
Figure 1: 2015 Work areas
Figure 2: Actual drilling locations at BT-4 and proposed locations for Beatrice Prospect.
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 30 Sept 2015
3
Tin Camp Creek Project
Radiogenic isotope sampling at TCC 4 in the Tin Camp Creek prospect during 2014 identified an
anomaly in the Kombolgie Sandstone. Additional sampling of outcropping sandstone and old
reconnaissance drill holes in 2015 has shown the anomalism extends over more than 2,000
metres. A peak response over 1,000 metres long was defined. Further processing of geophysical
data from the 2015 SAM survey has defined a coincident anomaly associated with this radiogenic
isotope anomaly.
The TCC4 target is considered a priority target for drill testing beneath the sandstone cover.
Diamond drilling of this target is planned for the commencement of the 2016 field season.
Mamadawerre JV Project
No substantial work was undertaken on the Mamadawerre JV Project area during the September
Quarter.
Research and Development
Alligator’s R&D program is focused on developing innovative techniques for exploration targeting
for unconformity uranium deposits. In particular, investigations and experimentation is being
undertaken on innovative applications of radiogenic isotope geochemical testing and Sub Audio
Magnetics (SAM) Geophysical techniques.
Further surface sampling was undertaken on the Beatrice Prospect to determine distribution of
radiogenic isotopes in sandstone and groundwater. A total of 930 sandstone samples have been
collected in 2015 for analysis.
Advanced techniques for processing late time signal decay responses from SAM/TFEM (Total
Field Electromagnetic) surveys are continuing.
CORPORATE
Non-Executive Director Appointment
On 27 July 2015, the Board appointed Greg Hall as a non-executive director of the Company.
Greg joined the Company after more than 27 years’ experience as an executive in the resources
sector. His experience includes employment with large listed companies such as North, WMC and
Rio Tinto as well as listed juniors such as Toro Energy and Hillgrove Resources.
Importantly Greg has a deep understanding of the uranium sector through his role as Marketing
Manager for ERA/Rio Tinto Uranium and the evaluation/approval of WA’s first fully approved
uranium project (as MD and Non-Executive Director) with Toro Energy Ltd. His operational
uranium experience also includes roles as Mining Manager at Olympic Dam and Ranger Uranium
Mine.
Greg has a Bachelor of Engineering in Mining Engineering and is Past Board and Exco member
of the Australian Uranium Association.
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 30 Sept 2015
4
Beatrice Project- Stage 1 Farm-in
Alligator completed its Stage 1 expenditure obligations to earn 51% of the Beatrice uranium
project JV. The company has notified Cameco Australia Pty Ltd (Cameco) and is now in the
process of having the 51% interest registered with the Northern Territory Department of Mines
and Energy (refer ASX release 20 August 2015).
This interest has been earned by funding recent geophysical and geochemical surveys
undertaken on the project area which identified a number of highly prospective targets (refer ASX
release 5 August 2015).
Fund Raising
On 21 August 2015, Alligator announced a 1:4 non-renounceable Rights Issue to existing
shareholders at an issue price of 4 cents per share. Acceptances of Entitlements and Additional
Shares by shareholders totaled $1,577,087. This constituted a 51% take-up of the shares offered
under the Rights Issue. The Rights Issue closed on 15 September 2015.
Acceptances of Entitlements were received for a total of 36,048,446 New Shares raising
$1,441,938. A number of shareholders who accepted their full Entitlement also applied for
Additional Shares under the Offer. Accordingly, 3,378,737 Additional Shares will also be issued
raising $135,149.
Two non-executive directors, Peter McIntyre and Greg Hall, have collectively committed to taking
up 2.75 million shares ($110,000) in the Rights Issue shortfall, subject to and conditional on
approval of the proposed subscriptions at the AGM as required under the ASX Listing Rules.
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 30 Sept 2015
5
Competent Person’s Statement
Information in this report is based on current and historic Exploration Results compiled by Mr Rob Sowerby who is
a Member of the Australasian Institute of Geoscientists. Mr Sowerby is CEO and Director of Alligator Energy Ltd,
and has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Sowerby
consents to the inclusion in this release of the matters based on his information in the form and context in which it
appears.
About Alligator Energy
Alligator Energy Ltd is an Australian, ASX listed, exploration company with uranium exploration tenements in the
world class Alligator Rivers Uranium Province in Arnhem Land, Northern Territory. The Alligator Rivers Uranium
Province hosts nearly 1 billion pounds of high grade uranium resources and past production, including the Ranger
Mine and Jabiluka. Since listing in February 2011, the company has completed in excess of 15,000m of drilling,
defined a maiden high grade, JORC compliant resource at Caramal (6.5Mlb U3O8 at 3100ppm U3O8) and
discovered new mineralization at Mintaka and Orion East. High Grade mineralization also occurs at the historic
South Horn and Gorrunghar prospect which remain only partially tested.
2
The company has in excess of 1000km of Exploration Licence applications and is also in Joint Venture with
Cameco Australia Pty Ltd for the Mamadawerre Project and Beatrice Project, also within the Alligator Rivers
Uranium Province.
Project Location Diagrams and Exploration Licences
FOR FURTHER INFORMATION, PLEASE CONTACT
Mr Rob Sowerby
Chief Executive Officer
Ian Howarth
Collins Street Media
0407 822 319
ian@collinsstreetmedia.com.au
Alligator Energy Ltd
Email: info@alligatorenergy.com.au
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 30 Sept 2015
6
Appendix 5B
Mining exploration entity quarterly report
Rule 5.3
Appendix 5B
Mining exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10
Name of entity
ALLIGATOR ENERGY LTD
ABN
Quarter ended (“current quarter”)
79 140 575 604
30 September 2015
Consolidated statement of cash flows
Cash flows related to operating activities
1.1
Receipts from product sales and related
debtors
1.2
Payments for (a) exploration & evaluation
(b) development
(c) production
(d) administration
Dividends received
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes (paid)/ received- R&D
Other (provide details if material)
1.3
1.4
1.5
1.6
1.7
Current quarter
$A’000
Year to date
$A’000
-
-
(1,270)
(215)
10
(1,270)
(215)
10
-
-
(1,475)
(1,475)
(30)
(30)
(30)
(30)
(1,505)
(1,505)
Net Operating Cash Flows
1.8
1.9
1.10
1.11
1.12
1.13
Cash flows related to investing activities
Payment for purchases of: (a) prospects
(b) equity investments
(c) other fixed assets
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
Loans to other entities
Loans repaid by other entities
Other - Security Deposits
Net investing cash flows
Total operating and investing cash flows
(carried forward)
+ See chapter 19 for defined terms.
17/12/2010 Appendix 5B Page 1
Appendix 5B
Mining exploration entity quarterly report
1.13
(1,505)
(1,505)
1,588
(42)
1,546
1,588
(42)
1,546
Net increase (decrease) in cash held
41
41
1.20
1.21
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
2,363
2,363
1.22
Cash at end of quarter
2,404
2,404
1.14
1.15
1.16
1.17
1.18
1.19
Total operating and investing cash flows
(brought forward)
Cash flows related to financing activities
Proceeds from issues of shares, options, etc.
Proceeds from sale of forfeited shares
Proceeds from borrowings
Repayment of borrowings
Dividends paid
Other - Capital Raising Costs
Net financing cash flows
Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the
related entities
Current quarter
$A'000
1.23
Aggregate amount of payments to the parties included in item 1.2
78
1.24
Aggregate amount of loans to the parties included in item 1.10
Nil
1.25
Explanation necessary for an understanding of the transactions
Directors’ fees, salaries and superannuation totalled $78k before amounts then used to subscribe for ordinary
shares in the Company under the Directors’ Fee Plan approved at the AGM on 21 November 2014 which
totalled $10.5k
Non-cash financing and investing activities
2.1
Details of financing and investing transactions which have had a material effect on
consolidated assets and liabilities but did not involve cash flows
Nil
2.2
Details of outlays made by other entities to establish or increase their share in projects in
which the reporting entity has an interest
Nil
+ See chapter 19 for defined terms.
Appendix 5B Page 2
17/12/2010
Appendix 5B
Mining exploration entity quarterly report
Financing facilities available
Add notes as necessary for an understanding of the position.
3.1
Loan facilities
3.2
Credit standby arrangements
Amount available
$A’000
-
Amount used
$A’000
-
-
-
Estimated cash outflows for next quarter
$A’000
1,288
4.1
Exploration and evaluation
4.2
Development
-
4.3
Production
-
4.4
Administration
186
1,474
Total
Reconciliation of cash
Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows)
to the related items in the accounts is as follows.
5.1
Cash on hand and at bank
5.2
Deposits at call
5.3
Bank overdraft
5.4
Other (provide details)
Current quarter
$A’000
Previous quarter
$A’000
479
314
1,925
2,049
-
-
-
-
2,404
2,363
Total: cash at end of quarter (item 1.22)
Changes in interests in mining tenements
Tenement
reference
6.1
Interests in mining
tenements relinquished,
reduced or lapsed
NIL
6.2
Interests in mining
tenements acquired or
increased
NIL
+ See chapter 19 for defined terms.
17/12/2010 Appendix 5B Page 3
Nature of interest
(note (2))
Interest at
beginning
of quarter
Interest at
end of
quarter
Appendix 5B
Mining exploration entity quarterly report
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
Total number
7.1
7.2
7.3
7.4
7.5
7.6
7.7
Preference +securities
(description)
Changes during quarter
(a) Increases through
issues
(b) Decreases through
returns of capital, buybacks, redemptions
+Ordinary securities
Changes during quarter
(a) Increases through
issues
(b) Decreases through
returns of capital, buybacks
+Convertible debt
Number
quoted
NIL
NIL
350,896,873
350,896,873
269,231
39,427,183
-
269,231
39,427,183
-
NIL
NIL
securities (description)
Changes during quarter
(a) Increases through
issues
(b) Decreases through
securities matured,
converted
Options (description
and conversion factor)
6,250,000
2,000,000
700,000
1,000,000
2,205,882
2,035,648
2,035,648
-
7.8
Issued during quarter
-
-
7.9
7.10
Exercised during quarter
Expired during quarter
-
-
7.11
Debentures
(totals only)
Unsecured notes (totals
only)
NIL
NIL
NIL
NIL
7.12
Issue price per
security (see
note 3) (cents)
Amount paid
up per security
(see note 3)
(cents)
3.9 cents
4.0 cents
3.9 cents
4.0 cents
Exercise price
Expiry date
$0.20
$0.25
$0.15
$0.00
$0.00
$0.00
$0.00
21 Nov 2015
30 Nov 2015
7 Mar 2017
2 May 2017
26 Nov 2017
31 Jan 2016
21 April 2018
+ See chapter 19 for defined terms.
Appendix 5B Page 4
17/12/2010
Appendix 5B
Mining exploration entity quarterly report
Compliance statement
1
This statement has been prepared under accounting policies which comply with
accounting standards as defined in the Corporations Act or other standards
acceptable to ASX (see note 5).
2
This statement does give a true and fair view of the matters disclosed.
Mike Meintjes
Company Secretary
30 October 2015
Notes
1
The quarterly report provides a basis for informing the market how the entity’s
activities have been financed for the past quarter and the effect on its cash
position. An entity wanting to disclose additional information is encouraged to
do so, in a note or notes attached to this report.
2
The “Nature of interest” (items 6.1 and 6.2) includes options in respect of
interests in mining tenements acquired, exercised or lapsed during the
reporting period. If the entity is involved in a joint venture agreement and
there are conditions precedent which will change its percentage interest in a
mining tenement, it should disclose the change of percentage interest and
conditions precedent in the list required for items 6.1 and 6.2.
3
Issued and quoted securities The issue price and amount paid up is not
required in items 7.1 and 7.3 for fully paid securities.
4
The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of
Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.
5
Accounting Standards ASX will accept, for example, the use of International
Financial Reporting Standards for foreign entities. If the standards used do not
address a topic, the Australian standard on that topic (if any) must be complied
with.
== == == == ==
+ See chapter 19 for defined terms.
17/12/2010 Appendix 5B Page 5
Share your feedback
Discover