Presentation- World Nuclear Fuel Market- June 25
Released
Released
Announcement PDF
ASX:AGE
Advancing Samphire Uranium
Project into Trial Production
Greg Hall – CEO
Andrea Marsland-Smith – CEO Designate
WNFM June 2025
Disclaimer
Forward Looking Statements
This presentation contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can
include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance of the Company.
These risks and uncertainties could cause actual results and the Company’s plans and objectives to differ materially from those expressed in the forward-looking information. Actual
results and future events could differ materially from anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates
and opinions of management on the dates they are made and expressly qualified in their entirety by this notice. The Company assumes no obligation to update forward-looking
information should circumstances or management’s estimates or opinions change.
Competent Person’s Statement – Uranium and Previously Reported Information
Information in this report is based on current and historic Exploration and Resource Drilling Results compiled by Dr Andrea Marsland-Smith, who is a Member of the AusIMM. Dr
Marsland-Smith is employed by Alligator Energy as Chief Operating Officer (COO) and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity she is undertaking (including 21 years working with ISR uranium development and operations) to qualify as a Competent Person as defined in
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr Marsland-Smith consents to the inclusion in this release of
the matters based on her information in the form and context in which it appears.
In relation to Exploration results and Mineral Resource estimates referred to in the announcements referred to on slides 3,6,7,8,9 the Company confirms that it is not aware of any
new information or data that materially affects the information included in the original market announcement and that all material assumptions and technical parameters underpinning
the estimates in the relevant market announcement continue to apply and have not materially changed. In relation to production target referred to on slide 6, the Company confirms
that all material assumptions underpinning the production target, and the forecast financial information derived from the production target, in the initial announcement continue to
apply and have not materially changed.
2
Alligator Corporate Presentation | May 2025 | ASX:AGE
Company Snapshot – Alligator Energy Limited (ASX: AGE)
Tier One uranium location
Samphire ISR Uranium Project in South Australia, tier
one location with ~40 years of uranium mining and
production
Experienced Team
Experienced ISR exploration, development and
production Management team, uranium mining
experienced Board, uranium marketing expertise, future
offtake from late this decade
Significant resource with
expansion potential
18 million pounds of U3O8 , second
satellite deposit to drill, and additional
exploration target up to 75 million
pounds U3O8 with potential beyond
3
Alligator Corporate Presentation | May 2025 | ASX:AGE
Trial Production
New uranium discovery
ISR Field Recovery Trial planned
for H2 2025 will derisk project,
inform the feasibility study, and
position Samphire to be SA’s next
uranium mine
Big Lake Project in Lake Eyre Basin
(above Cooper Basin) in SA - a new
ISR uranium discovery in a
previously untested region
Samphire Uranium project: South Australia – Experience in Uranium
20kms from
Whyalla, SA
Iron and steel making centre,
Excellent regional
infrastructure, skilled labourforce, local engineering and
services
4
Alligator Corporate Presentation | May 2025 | ASX:AGE
Environment Social Governance (ESG) in practice: Operating philosophy
• We aim to add value in all of our decision-making for shareholders.
Shareholders
• We wish to provide an engaging, challenging, enjoyable and respectful
workplace for our employees.
• We respect the rights of landowners and communities and seek to
collaborate for our mutual benefit.
Stakeholder
Perspective
• We respect the cultural heritage and connection to country of
Traditional Owners and wish to create mutually beneficial
opportunities.
Team
Communities
Focus on
Environment
Landowners
• We aim for a low impact on the environment, through innovation, use
of latest technology, and responsible land management techniques.
Traditional
Owners
Our aim is to discover, source and economically extract these needed commodities with an innovative approach,
with either zero or minimal impact, and with positive value and experience for our stakeholders and communities.
5
Alligator Corporate Presentation | May 2025 | ASX:AGE
Samphire Uranium project: A highly competitive In-Situ Recovery project
Conceptual Model of ISR
Blackbush Mineral Resource Update (May 2025)
80m
(260ft)
deep
ISR
At 250ppm cut-off grade the Blackbush MRE now stands at an Indicated Mineral
Resource of 14.2Mlbs at 786ppm and an Inferred Mineral Resource of 3.8Mlbs at
443ppm, totalling 18.0Mlbs at 676ppm U3O81
Robust scoping study at 1.2 Mlbs pa
A$131m capex, 42% IRR, and 2.45 yr payback 2
1 AGE ASX release 6 May 2025, Increased Mineral Resource Estimate and Upgrade of Indicated
Resource for the Blackbush Deposit, Samphire U Project. 02943740.pdf
2 AGE ASX release 14 December 2023
https://wcsecure.weblink.com.au/pdf/AGE/02753924.pdf
6
Alligator Corporate Presentation | May 2025 | ASX:AGE
Plan view of Blackbush channel - Collar locations (pre 2024 blue dots, 2024 in black dots) and
current Indicated (red shell), Inferred (green shell) and Unclassified (pale green shell) MRE .
Blackbush Deposit Indicated Mineral Resource highlights:
• Increased by 10% to 14.2Mlbs at an average grade of 786ppm U3O8
• 135% increase since commencement of AGE’s resource drilling at Blackbush in 20221.
• 78% of the metal in the total MRE is now classified as Indicated
• Indicated Resource now of a size and integrity ready for detailed well field
designs and may allow an increase in the production rate upwards from
1.2Mlbs pa (Updated Scoping Study2) to be targeted during Feasibility Study
Further Extensions outside the Exploration Target Range Envelope
•
Pink drilled area is 18 Mlbs resource at Blackbush
•
Second satellite deposit at Plumbush (orange rectangle)
already established – requires closer spaced drilling to
become a potential resource.
•
Exploration target range – additional 14 to 75 Mlbs
•
Ground gravity data shows outstanding continuity of the
Samphire palaeochannel – recently increased to total length
of ~over 90kms of channels.
•
Historical drillholes confirm that extensions contain the same
thick sequences of Kanaka Bed sands which host the
Blackbush Mineral Resource.
•
72% of the prospective areas of the entire Samphire
palaeochannel system remain completely untested by drilling.
Significant potential for new discoveries and resource growth
in the Project area.
Refer ASX Announcements 7 December 2023 and 2 May 2024
7
Alligator Corporate Presentation | May 2025 | ASX:AGE
Samphire Uranium Project – Field Recovery Trial (FRT)
• Field Recovery Trial (FRT) construction targeted for July /
August pending PEPR (operating plan) regulatory approval.
Plant fully fabricated and delivered to AGE’s Whyalla yard.
• FRT operation for 3+ months from ~September to November
2025 and consists of three producing well patterns and a
containerised pilot plant.
• FRT is designed to confirm key operating parameters and
marks an important step toward development.
• Parameters to be assessed include in-situ chemistry,
hydrogeology, uranium recovery, reagent usage, and other
environmental and economic factors.
• Data and learnings further de-risk the Project and provides
the necessary inputs to a full feasibility study and full
Mining Lease Application to commence during 2H 2025.
• Expression of Interest mid 2025 to select engineering firms for
definitive feasibility study commencing late 2025.
8
Alligator Corporate Presentation | May 2025 | ASX:AGE
Wellhouse (Pipe room) Module
Samphire Uranium Project – Field Recovery Trial Plant
• Fabrication of the containerised FRT processing
Pilot plant layout
plant completed - delivered to AGE’s Whyalla
yard.
• Whyalla based contractor, Ahrens Group Pty Ltd,
selected for the on-site construction of the pilot
plant, contract being finalized.
• Plant control system set up and tested.
Commissioning and operating plans being
finalised for initiation.
• Post-FRT and subject to any further testing, well
infrastructure and plant to be removed, and area
rehabilitated – pilot plant available for future
satellite field testing.
• Samples of final clean eluate solution containing
extracted uranium oxide to be further processed
into U3O8 concentrate offsite for Converter
quality samples.
9
Alligator Corporate Presentation | May 2025 | ASX:AGE
Ion Exchange Module
Wellhouse Module (pipe room)
Delivered to site
2025 Year Plans and Targets
10 Alligator Corporate Presentation | May 2025 | ASX:AGE
ASX:AGE
Greg Hall CEO
Andrea Marsland-Smith
CEO Designate
+61 (0) 7 3839 3904
gh@alligatorenergy.com.au
ams@alligatorenergy.com.au
www.alligatorenergy.com.au