Red Cloud Securities Conference Presentation - Feb 25
Released
Released
Announcement PDF
ASX:AGE
Advancing Samphire Uranium
Project into Trial Production
Red Cloud Securities Pre-PDAC
Greg Hall – CEO – February 2025
Disclaimer
Forward Looking Statements
This presentation contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can
include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance of the Company.
These risks and uncertainties could cause actual results and the Company’s plans and objectives to differ materially from those expressed in the forward-looking information. Actual
results and future events could differ materially from anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates
and opinions of management on the dates they are made and expressly qualified in their entirety by this notice. The Company assumes no obligation to update forward-looking
information should circumstances or management’s estimates or opinions change.
Competent Person’s Statement – Uranium and Previously Reported Information
Information in this report is based on current and historic Exploration and Resource Drilling Results compiled by Dr Andrea Marsland-Smith, who is a Member of the AusIMM. Dr
Marsland-Smith is employed by Alligator Energy as Chief Operating Officer (COO) and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity she is undertaking (including 15 years working with ISR uranium development and operations) to qualify as a Competent Person as defined in
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr Marsland-Smith consents to the inclusion in this release of
the matters based on her information in the form and context in which it appears.
In relation to Exploration results and Mineral Resource estimates referred to in the announcements referred to on slides 4,7,8,10,11 and 17 the Company confirms that it is not aware
of any new information or data that materially affects the information included in the original market announcement and that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. In relation to production target referred to on slides 7 and 9, the
Company confirms that all material assumptions underpinning the production target, and the forecast financial information derived from the production target, in the initial
announcement continue to apply and have not materially changed.
Competent Person’s Statement – Nickel Cobalt exploration
Information in this report is based on current and historic Exploration Results compiled by Mr Geoffrey Chapman who is a Fellow of the Australasian Institute of Mining and
Metallurgy. Mr Chapman is a Consultant Geologist with Alligator Energy Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves. Mr Chapman consents to the inclusion in this release of the matters based on his information in the form and context in which it
appears.
2
Alligator Corporate Presentation | February 2025 | ASX:AGE
Company Snapshot
Capital Structure (as at 29 Jan 2025)
Share Price
$0.036
Ordinary Shares
3,873.6 M
Perf Shares, Listed & Unlisted Options
462.2 M
Cash as at 31 Dec 2024
$ 20.2 M
Market Cap
$140 M
Top 50 Shareholders
Brokers &
Banks
19%
Retail
45%
Directors
&
Executives
5%
Institutions
31%
3
Alligator Corporate Presentation | February 2025 | ASX:AGE
Investment Highlights – Alligator Energy Ltd (ASX: AGE)
Tier One location
Experienced Team
Trial Production
Samphire ISR Uranium Project in
South Australia, tier one location
with ~40 years of uranium
mining and production
Exp ISR production team in place,
uranium Executives, marketing
expertise in place, future offtake
from late this decade
ISR Field Recovery Trial planned
for H2 2025 will derisk project,
inform the feasibility study, and
position Samphire to be SA’s next
uranium mine
Significant resource with
expansion potential
~18 million pounds of U3O8 , satellite
deposit, and addition exploration
target of up to 75 million pounds U3O8
4
Alligator Corporate Presentation | February 2024 | ASX:AGE
New discovery
Well capitalised
Big Lake Project in Lake
Eyre Basin represents a
new ISR U discovery in a
previously untested region
Strong Aust market
support with Cash
Balance of $20.2 million
(as of Dec 31 2024)
Uranium and Nuclear Fuel market
5
Alligator Corporate Presentation | February 2025 | ASX:AGE
Samphire Uranium project: South Australia – experience in uranium
6
Alligator Corporate Presentation | February 2025 | ASX:AGE
Samphire Highlights
20kms from
Whyalla, SA
JORC compliant
resource
Regional exploration
opportunities
Excellent regional
infrastructure and
skilled labour-force
17.5 Mlbs uranium resource,
satellite prospect to drill, with
significant scope for growth
Exploration Target
estimates additional
14 - 75 Mlbs
Note: the potential quantity and grade of the Exploration Target is
conceptual in nature as there has been insufficient exploration to date to
estimate a Mineral Resource and it remains uncertain whether further
exploration will result in the estimation of a Mineral Resource
Robust Scoping Study1.2 Mlb / annum prod.
A$131m capex, 42% IRR,
and 2.45 yr payback
Refer ASX release 14 December 2023
“Scoping Study Update”
7
Alligator Corporate Presentation | February 2025 | ASX:AGE
Pilot ISR trial
operations imminent
Fabricated and delivered to
site, lease approved, awaiting
operating plan approval
ESG
Strong ESG credentials,
with environmental
commendation awarded by
SA government
Samphire Uranium project: A highly competitive In-Situ Recovery project
• Initial low capital cost estimate of A$131 million,
despite significant contingencies totalling 35%.
• AISC at the lower end of cost curve, due to:
➢ In-situ Recovery (ISR) amenable,
➢ nature of the deposit, shallow depth (200 to 260ft),
excellent formation porosity, and
➢ high leaching dynamics.
• Location near Whyalla affords lower cost of key
infrastructure, locally based workforce (i.e. no FIFO or
camp), experienced mining services and business
support.
• Expansion potential - Exploration Target Range (Dec 23)
estimating an additional 14 - 75 Mlbs on top of 17.5Mlbs
resource. Multi-year resource extension and step-out
drilling to increase mine life and production rate.
• Field Recovery Trial on receipt of final operating plan
regulatory approval to de-risk project and confirm
parameters to be used in feasibility study during 2H 2025
8
Alligator Corporate Presentation | February 2025 | ASX:AGE
Conceptual Model of ISR
Samphire Uranium Project – Dec 2023 Scoping Study† : 1.2 Mlbs pa project
Study metrics* at US$75 / lb uranium price
A$131m
2.45 years
42%
A$257m
US$33.31/lb
US$16.06/lb
CAPEX
Payback
IRR*
NPV8*
AISC
Cash Costs
(post-tax, real,
ungeared)
(post-tax, real,
ungeared)
(A$47.58/lb)
(A$22.94 /lb)
(including contingency)
† Ref ASX release 14 December 2023 “Scoping Study Update”: Alligator confirms that all material assumptions underpinning the ‘production target’ or the forecast financial information derived from the
‘production target’ continue to apply and have not materially changed other than the outlook for the long-term uranium price as set out above; *Calculated using 0.70 US/A$ exchange rate inclusion of significant
contingencies and inflation of 35%.
9
Alligator Corporate Presentation | February 2025 | ASX:AGE
Samphire Uranium Project – Blackbush 2024 Drilling and resource update
Significant uranium mineralisation intersections from Blackbush West uranium
roll fronts has delivered further targets outside of the Inferred mineral resource.
Announced in ASX release dated 21 Nov 2024:
•
•
•
•
•
•
•
•
•
BBRM24-304: 1.3 meters at 1.94% (19,391ppm) pU3O8 from 62.6m (GT 25,208)
BBRM24-278: 1.1 meters at 0.44% (4,392ppm) pU3O8 from 62.94m (GT 4,832)
BBRM24-338: 2.4 meters at 0.20% (1,948ppm) pU3O8 from 56.7m (GT 4,675)
BBRM24-321: 1.1 meters at 0.36% (3,633ppm) pU3O8 from 58.59m (GT 3,996)
BBRM24-282: 1.7 meters at 0.23% (2,314ppm) pU3O8 from 63.1m (GT 3,934)
BBRM24-283: 0.8 meters at 0.45% (4,506ppm) pU3O8 from 65.03m (GT 3,604)
BBRM24-318: 0.7 meters at 0.36% (3,566ppm) pU3O8 from 59.1m (GT 2,497)
BBRM24-330: 0.8 meters at 0.18% (1,791ppm) pU3O8 from 63.1m (GT 1,433)
BBRM24-314: 0.6 meters at 0.17% (1,734ppm) pU3O8 from 59.14m (GT 1,040)
An update of the JORC Resource Estimate inclusive of all 2024 drill results to be
completed in Q1, 2025, targeting both resource expansion and category
conversion from inferred to indicated
Note: pU3O8 denotes that the grade has been determined by Prompt Fission Neutron
downhole logging
GT= grade(ppm) x thickness(m) – divide by 10,000 for m% GT
ASX release 1 May 2024 – Extension of Uranium Mineralisation at Samphire, and ASX
release 21 Nov 2024 – Significant Drilling Results – Samphire Uranium Project Update
10 Alligator Corporate Presentation | February 2025 | ASX:AGE
Further Extensions outside the Exploration Target Range Envelope
Ground Gravity Survey- April 2024
•
Exploration target range – additional 14 to 75 Mlbs
•
Ground gravity data shows outstanding continuity of the
Samphire palaeochannel system by 34 lineal km’s.
•
50% increase to the existing palaeochannel strike length to
~over 90kms.
•
Historical drillholes confirm that extensions contain the same
thick sequences of Kanaka Bed sands which host the
Blackbush Mineral Resource .
•
Multiple historical drillhole intersections (above 250ppm
eU3O8 cutoff) confirm that uranium is ubiquitous throughout
this system.
•
72% (over 70km) of the prospective areas of the entire
Samphire palaeochannel system remain completely untested
by drilling.
•
Significant potential for new discoveries and resource growth
in the Project area.
Refer ASX Announcements 7 December 2023 and 2 May 2024
11 Alligator Corporate Presentation | February 2025 | ASX:AGE
Samphire Uranium Project – Field Recovery Trial (FRT)
• Field Recovery Trial (FRT) construction targeted for mid year
pending PEPR (operating plan) regulatory approval. Plant fully
fabricated and delivered to AGE’s Whyalla yard.
• FRT operation for 3-4 months and consists of three producing
well patterns and a containerised pilot plant.
• FRT is designed to confirm key operating parameters and
marks an important step toward development.
• Parameters to be assessed include in-situ chemistry,
hydrogeology, uranium recovery, reagent usage, and other
environmental and economic factors.
• Data and learnings further de-risk the Project and provides the
necessary inputs to a full feasibility study and Mining Lease
Application during H2 2025.
• EoI’s to select engineering firms for feasibility study to
commence
Wellhouse (Pipe room) Module
12 Alligator Corporate Presentation | February 2025 | ASX:AGE
Samphire Uranium Project – Field Recovery Trial Plant
• Fabrication of the containerised FRT processing
Pilot plant layout
plant completed - delivered to AGE’s Whyalla
yard in July 2024.
• Expressions of Interest to five Whyalla based
companies for onsite civils and pilot plant
construction evaluated. Preferred company to
be announced in coming weeks.
• Plant control system set up and tested.
Commissioning and operating plans being
finalised for initiation.
• Post-FRT and subject to any further testing, well
infrastructure and plant to be removed, and area
rehabilitated – pilot plant available for future
satellite field testing.
• Samples of final clean eluate solution containing
extracted uranium oxide to be further processed
into U3O8 concentrate offsite for Converter
quality samples.
13 Alligator Corporate Presentation | February 2025 | ASX:AGE
Ion Exchange Module
Wellhouse Module (pipe room)
Delivered to site
2025 Plans and Targets
• Jan – Retention Lease approval with assigned conditions for Field Recovery Trial (FRT)
• Feb – Submission of Program for Environment Performance and Rehabilitation (PEPR) – FRT operating plan
• Feb – Start of second exploration program on Big Lake Uranium discovery
• Feb – Alligator Rivers data review and workshop on next steps and targets
• Mar / Apr – Updated uranium resource for Blackbush Deposit, Samphire project
• May / Jun – Anticipated approval of PEPR – Commencement of trial production well drilling for FRT
• Jun / Jul – On-site construction of Samphire FRT pilot plant – civils, plant, infrastructure
• 1H – Expression of Interest to engineering groups for Samphire Feasibility to commence Q3
• Aug to Nov – Operation of Field Recovery Trial – incl RO plant operation
• Q3 – Initial regulatory discussion around Scoping for future full mine approvals
• 2H – Commence Plumbush satellite deposit resource drilling (subject to successful pastoral access
agreement and cultural heritage survey)
• Q3 – potential next BLU drilling program subject to results
14 Alligator Corporate Presentation | February 2025 | ASX:AGE
2025 Plans and Targets
15 Alligator Corporate Presentation | February 2025 | ASX:AGE
Exploration projects
NT, AUSTRALIA
ITALY
Piedmont NW
Alligator Rivers
(ARUP)
High Grade U
Ni-Co-Cu-Au-PGEs
SA, AUSTRALIA
Big Lake
(Cooper Basin)
ISR style U
SA, AUSTRALIA
Investment in
EnviroCopper Ltd
Copper ISR
16 Alligator Corporate Presentation | February 2025 | ASX:AGE
Big Lake Uranium - Inaugural Drilling Program Discovery Success
• Inaugural drilling program intersected significant thicknesses of
anomalous uranium mineralisation within interbedded
palaeochannel sand units in the Namba Formation.
• Discovery is first proof of concept that significant uranium is present
within Lake Eyre basin sediments above the hydrocarbon-rich
Cooper Basin within potentially ISR amenable host and depths.
• Laboratory chemical assay results validate the in-field XRF
measurements for contained uranium. These include:
• AC24-021
• AC24-022
• AC24-023
• AC24-025
20m @ 110 ppm U from 106 m
35 m @ 117 ppm U from 93 m
5 m @ 47 ppm U from 104 m
10 m @ 138 ppm U from 108 m
• The indicative grade-thickness of two intersections is at or near the
economic cut off used at the Company’s Samphire ISR uranium
project near Whyalla, SA.
• Second drilling program now underway include rotary mud drilling
for deeper drilling into both the Namba and Eyre formations.
Alligator Corporate Presentation | February 2025 | ASX:AGE
Refer ASX releases 13 August 2024 and 23 October 2024
ASX:AGE
Greg Hall CEO
+61 (0) 7 3839 3904
gh@alligatorenergy.com.au
www.alligatorenergy.com.au
Share your feedback
Discover