Half Year Financial Report - 31 December 2024
Released
Released
Announcement PDF
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
31 December 2024
HALF YEAR FINANCIAL REPORT
ACN 140 575 604 • PO Box 338, Spring Hill, QLD 4004 • +61 (0) 7 3839 3904 • info@alligatorenergy.com.au •
www.alligatorenergy.com.au
CONTENTS
Page
Directors’ Report
1
Auditor’s Independence Declaration
7
Consolidated Statement of Profit or Loss and Other Comprehensive Income
8
Consolidated Statement of Financial Position
9
Consolidated Statement of Changes in Equity
10
Consolidated Statement of Cash Flows
11
Notes to the Financial Statements
12
Directors’ Declaration
19
Independent Auditor’s Review Report to Members
20
Competent Person’s Statement
22
CORPORATE OFFICE
Suite 2, 128 Bowen St
Spring Hill, QLD 4000
Tel: (07) 3839 3904
Postal Address
PO Box 338
Spring Hill, QLD 4004
The information in this report should be read in conjunction with the Annual Report for the year ended
30 June 2024 which is available from the Alligator Energy Limited website:
www.alligatorenergy.com.au
ACN 140 575 604 • PO Box 338, Spring Hill, QLD 4004 • +61 (0) 7 3839 3904 • info@alligatorenergy.com.au •
www.alligatorenergy.com.au
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
DIRECTORS’ REPORT
The Directors of Alligator Energy Limited (the ‘Company’, ‘Alligator’, ‘AGE’) and its controlled entities
(the ‘Group’) present their report, together with the financial statements of the Group, for the half-year
ended 31 December 2024.
Directors
The following persons were Directors of Alligator Energy Limited (‘Alligator’) during the half-year and
up to the date of this report, unless stated otherwise:
Paul Dickson
Fiona Nicholls
Peter McIntyre
Gregory Hall
Callum McIntyre
Non-Executive Chairman
Non-Executive Director
Non-Executive Director
Managing Director & CEO
Alternate Director for Peter McIntyre
Principal activities
The principal activities of the Group are uranium and other energy minerals exploration. There were no
significant changes in the nature of the Group’s activities during the half-year.
Dividends
There were no dividends paid to shareholders during the half-year.
Review of operations
(i)
Exploration and Evaluation activities
Samphire Project, South Australia
Mineral Resource Drilling at Blackbush
Drilling activities for the six month period focused south of Blackbush West and Area 51 (west of
Blackbush West) within the indicated resource envelope to convert additional resource to the
Indicated category in preparation for updated Blackbush resource targeted for early 2025. Key
outcomes for the period were released to the market in late November 2024 and included:
- Uranium mineralisation extended by a cumulative 500m of strike length outside the
known Blackbush West Mineral Resource Envelope.
- Significant uranium intersections encountered in roll fronts focusing on the western
and southern areas of Blackbush west.
o A total of 61 holes drilled for 5,158m from mid-July to mid November 2024.
o Results align with the strategy outlined in Alligator’s Exploration Target Range.
- Continued refinement in understanding of the Blackbush West uranium roll fronts has
delivered further targets outside of the Inferred mineral resource.
ACN 140 575 604 • PO Box 338, Spring Hill, QLD 4004 • +61 (0) 7 3839 3904 • info@alligatorenergy.com.au • Page 1
www.alligatorenergy.com.au
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
DIRECTORS’ REPORT
(continued)
Review of operations (cont.)
Samphire Project, South Australia (cont.)
- Significant uranium mineralisation intersections included:
o
o
o
o
o
o
o
o
o
BBRM24-304
BBRM24-278
BBRM24-338
BBRM24-321
BBRM24-282
BBRM24-283
BBRM24-318
BBRM24-330
BBRM24-314
1.3 metres at 1.94% (19,391ppm) pU3O81 from 62.6m (GT 25,208)2
1.1 metres at 0.44% (4,392ppm) pU3O8 from 62.94m (GT 4,832)
2.4 metres at 0.20% (1,948ppm) pU3O8 from 56.7m (GT 4,675)
1.1 metres at 0.36% (3,633ppm) pU3O8 from 58.59m (GT 3,996)
1.7 metres at 0.23% (2,314ppm) pU3O8 from 63.1m (GT 3,934)
0.8 metres at 0.45% (4,506ppm) pU3O8 from 65.03m (GT 3,604)
0.7 metres at 0.36% (3,566ppm) pU3O8 from 59.1m (GT 2,497)
0.8 metres at 0.18% (1,791ppm) pU3O8 from 63.1m (GT 1,433)
0.6 metres at 0.17% (1,734ppm) pU3O8 from 59.14m (GT 1,040)
An update of the JORC Mineral Resource Estimate, inclusive of all drill results for 2024 will be
completed late in Q1, 2025.
Field Recovery Trial (FRT)
In late December 2024, the Company received the draft Retention Lease (RL) tenement
documents from the SA Department for Energy and Mining (DEM) including the
proposed Conditions of operation with which the Company must comply while operating
the FRT.
Alligator reviewed the Conditions and after clarification of some points, accepted the
Conditions on 30 December 2024. The Company received confirmation from the DEM of
the grant of a RL for the conduct of the FRT, on 13 January 2025. The associated
Conditions are now being factored into the Program for Environment Protection and
Rehabilitation (PEPR) which forms the operating plan for the FRT. The PEPR is targeted
for submission in February 2025 and will likely take some months to be approved.
Approval of the PEPR will represent the final step in the regulatory process, allowing
commencement of on-site construction of the FRT infrastructure.
Contractual arrangement negotiations commenced with a preferred Whyalla based
contractor for the FRT civil works and construction based on a detailed scope of work, a
targeted schedule and definitive cost estimate.
1 Note: pU O
3
8 denotes that the grade has been determined by Prompt Fission Neutron downhole logging
2 GT= grade(ppm) x thickness(m) – divide by 10,000 for m% GT
ACN 140 575 604 • PO Box 338, Spring Hill, QLD 4004 • +61 (0) 7 3839 3904 • info@alligatorenergy.com.au • Page 2
www.alligatorenergy.com.au
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
DIRECTORS’ REPORT
(continued)
Review of operations (cont.)
Alligator Rivers Province (ARUP) – TCC, Beatrice and Nabarlek North Projects
The new high resolution airborne magnetic and radiometric survey acquired earlier in 2024 was
supplemented with a third-party (Southern Geoscience Consultants) interpretation to assist with
planning follow-up drill programs in 2025.
The 2024 drilling program was completed in September, having drilled a total of 3,526 m of
reverse circulation in 22 holes in just two weeks. The program included 8 holes averaging 180 m
depth to test for northerly extensions of the U40 prospect, along with step-out drilling from AGE’s
uranium intercept reported in the previous financial year.
A total of 504 downhole samples were taken for geochemical analysis across varying geological,
alteration and potentially mineralised zones. The results from the assays of all samples are
anticipated early in 2025 and will inform planning workshops and future targeting. In addition to
downhole sampling, 236 surface samples were taken across the Nabarlek North project forming
broad traverses designed to aid with geological interpretations and identify the most prospective
geological domains with the project.
At the Company’s Tin Camp Creek Project hosting the historic Caramal resource, 88 surface
samples were taken across historic and new prospects in conjunction with environmental access
assessments which will inform the Company’s 2025 program generation for the project.
The data and results for two co-funding grants received from the NT Government were submitted
towards the end of the half-year. These grants contributed to the funding of 2024 airborne
geophysics and greenfields exploration RC drilling. Claimable co-funding expenditure has been
confirmed with the Company receiving in excess of $175k in grants for the period.
Big Lake Uranium (BLU), South Australia
The inaugural drilling program at Big Lake was completed during the period with 27 holes for a
combined total of 3,413 m. Fences of holes were strategically placed centred on five areas to
calibrate seismic/AEM interpretations and provide confirmation of key elements to demonstrate a
fertile basin uranium roll-front mineralisation model.
Drilling at Site 10 on the key tenement, EL6367, returned significant thicknesses of paleochannel
sands and elevated uranium values, and these have now been confirmed by assay. Four holes
recorded uranium values at over 100 ppm, including two intersections within porous sands of
greater than 20 m thickness
A heritage clearance was undertaken in late October with the Yandruwandha Yawarrawarrka
Traditional Land Owners Aboriginal Corporation for additional site clearances for a 2025 drilling
program planned for mobilisation in late February 2025.
ACN 140 575 604 • PO Box 338, Spring Hill, QLD 4004 • +61 (0) 7 3839 3904 • info@alligatorenergy.com.au • Page 3
www.alligatorenergy.com.au
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
DIRECTORS’ REPORT
(continued)
Review of operations (cont.)
Piedmont Project, northern Italy
Tenement applications approved - Castello di Gavala, Sella Bassa and Valmaggia applications
covering a total area of 5,405 hectares were approved and the licences issued during the period.
The applications were resubmitted during 2024 with refined boundaries targeting the key lower
mantle geological settings hosting Ni, Cu, Au and Pt-Pd occurrences. At the time of assessing data
for the resubmission of the applications, the presence of carbonatites within the sequence was
identified providing the opportunity to also investigate the potential for REE occurrences.
A small stream sampling program was undertaken at the Laghetto and Sella Bassa licences
proximal to the Gula Prospect. The objective of this program was to follow up on the exceptional
Au grab samples results (up to 60.8g/t – ASX Announcement- 14 September 2018) and historic
stream sampling to investigate the extent of the Au anomalism. A total of 5 samples were collected
spanning approximately 2km of river system. Bulk samples were split into 3 fractions for each site
giving a total of 15 samples now submitted to ALS Ireland for geochemical analysis. Assaying
will cover a suite of elements including Au, Ni and REEs.
Marketing the opportunity to acquire the Project to interested parties will resume once the assay
results for the recent sampling program are returned and the Project Information Memorandum
updated.
Investment in EnviroCopper Limited (ECL) – Cu ISR
The Company continues to plan for a Site Environmental Lixiviant Test (SELT) Circulation Trial
(copper extraction) whilst awaiting the regulatory approval in the form of a Program for
Environment Protection and Rehabilitation (PEPR).
Three rotary mud drillholes were completed at ECL’s Alford West Project to determine
hydrological characteristics and to test weathered structurally controlled mineralisation for in-situ
recovery amenability
A Deed of Variation to the EnviroCopper Limited (ECL) Shareholders’ Agreement was finalised
during the period involving completion of the originally envisaged Stage 1 investment (see ASX
Announcement 18 December 2023) in that company. The subscription arrangements were
completed post period end with Alligator now holding a 15.61% interest and appointing Greg Hall
to the Board of ECL
(ii)
Financial
The loss for the consolidated group for the half-year was $1,471,177 (Half-year to 31 December
2023: $1,483,414 loss). The loss for the period includes expensing of ground reconnaissance
ACN 140 575 604 • PO Box 338, Spring Hill, QLD 4004 • +61 (0) 7 3839 3904 • info@alligatorenergy.com.au • Page 4
www.alligatorenergy.com.au
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
DIRECTORS’ REPORT
(continued)
Financial (cont.)
related expenditures and holding costs for the Tin Camp Creek and Beatrice Projects of $150,940
(Half-year to 31 December 2023: $45,214). Employee benefit costs for the period were $796,692
(Half year to 31 December 2023: $676,150). The increase from the prior period relates primarily
to additional corporate focused activities by exploration staff and a senior staff member
redundancy. Share based payments for the period were $211,301 (Half year to 31 December 2023:
$156,121). The increase was a result of a larger number of staff being eligible for the Employee
Share Scheme and the inclusion of share options in the remuneration arrangements for NonExecutive Directors (approved at the 2024 AGM).
Business development costs for the period were $184,739 (Half year to 31 December 2023:
$119,560). The increase relates to a success fee payable for the EnviroCopper Limited transaction.
The significant increase in interest income during the period is as a result of an improved interest
rate environment and higher average cash balances on hand.
(iii)
Environment, Social and Governance (ESG)
Alligator is committed to sound ESG practices across all facets of its business and is continuing
the process of establishing a framework and goals to support sustainable operating activities across
its portfolio of development and exploration projects.
The Company has recently implemented a companywide Workplace Health and Safety,
Environmental and Quality Management System which is being embedded into ‘business as usual’
practices.
(iv)
Matters subsequent to the end of the half-year
After period end the Company subscribed for 321,405 shares in EnviroCopper Limited (ECL) for
a consideration of $871,007. Alligator now holds a 15.61% interest in ECL. The Company has
appointed Greg Hall as its representative to the Board of ECL.
In January 2025 the Company received confirmation from the Department for Energy and Mining
(DEM) of the grant of a Retention Lease (RL) for the conduct of the FRT, incorporating a trial
wellfield and pilot uranium extraction plant. The conditions attaching to the RL will be factored
into the Program for Environment Protection and Rehabilitation (PEPR) which forms the operating
plan for the FRT. The PEPR is targeted for submission by Alligator in late February 2025.
Approval of the PEPR represents the final step in the DEM regulatory process, and with an EPA
site permit process underway, these will allow the commencement of on-site construction of the
FRT infrastructure.
ACN 140 575 604 • PO Box 338, Spring Hill, QLD 4004 • +61 (0) 7 3839 3904 • info@alligatorenergy.com.au • Page 5
www.alligatorenergy.com.au
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
DIRECTORS’ REPORT
(continued)
On 27 February 2025, the Company advised that a follow-up drill program at the Big Lake
Uranium Project (Big Lake) in the Lake Eyre Basin, South Australia was underway following the
initial discovery success in 2024.
On 3 March 2025, the Company advised that the Program for Environment Protection and
Rehabilitation (PEPR) for conducting the in-situ Field Recovery Trial (FRT) at the Samphire
Uranium Project, near Whyalla, South Australia had been submitted and is now in the assessment
phase.
No other matter or circumstance has arisen since 31 December 2024 that has significantly affected,
or may significantly affect:
a) The Group’s operations in future financial years, or
b) The results of those operations in future financial years, or
c) The Group’s state of affairs in future financial years.
(v)
Auditor’s Independence Declaration
The auditor’s independence declaration as required under section 307C of the Corporations Act
2001 is set out on page 7.
This report is made in accordance with a resolution of the Board of Directors made pursuant to
section 306(3) of the Corporations Act 2001.
Paul Dickson
Chairman
Brisbane, 13 March 2025
ACN 140 575 604 • PO Box 338, Spring Hill, QLD 4004 • +61 (0) 7 3839 3904 • info@alligatorenergy.com.au • Page 6
www.alligatorenergy.com.au
PKF Brisbane Audit
ABN 33 873 151 348
Level 6, 10 Eagle Street
Brisbane, QLD 4000
Australia
+61 7 3839 9733
brisbane@pkf.com.au
pkf.com.au
AUDITOR’S INDEPENDENCE DECLARATION
UNDER SECTION 307C OF THE CORPORATIONS ACT 2001
TO THE DIRECTORS OF
ALLIGATOR ENERGY LIMITED
I declare that, to the best of my knowledge and belief, during the half-year ended 31
December 2024, there have been:
(a)
no contraventions of the auditor independence requirements of the Corporations Act
2001 in relation to the review; and
(b)
no contraventions of any applicable code of professional conduct in relation to the
review.
This declaration is in respect of Alligator Energy Limited and the entities it controlled during
the half year.
PKF BRISBANE AUDIT
TIM FOLLETT
PARTNER
13 MARCH 2025
BRISBANE
PKF Brisbane Pty Ltd is a member of PKF Global, the network of member firms of PKF International Limited, each of which is a separately owned legal entity and
does not accept any responsibility or liability for the actions or inactions of any individual member or correspondent firm(s). Liability limited by a scheme
approved under Professional Standards Legislation.
ACN 140 575 604 • PO Box 338, Spring Hill, QLD 4004 • +61 (0) 7 3839 3904 • info@alligatorenergy.com.au • Page 7
www.alligatorenergy.com.au
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
CONSOLIDATED STATEMENT OF PROFIT OR LOSS
AND OTHER COMPREHENSIVE INCOME
FOR THE HALF-YEAR ENDED 31 DECEMBER 2024
31 December
2024
$
31 December
2023
$
736,556
-
374,591
-
(66,422)
(15,043)
(102,415)
(796,692)
(211,301)
(42,440)
(39,870)
(149,951)
(76,446)
(61,800)
(40,481)
(184,739)
(150,940)
(75,554)
(6,726)
(186,915)
(45,452)
(81,602)
(96,994)
(676,150)
(156,121)
(41,242)
(35,367)
(124,411)
(70,306)
(49,682)
(47,355)
(119,560)
(45,214)
(284)
(103,174)
(8,436)
(156,655)
(1,471,177)
(1,471,177)
(1,483,414)
(1,483,414)
-
-
Total comprehensive loss for the period
(1,471,177)
(1,483,414)
Loss attributable to members of the parent entity
(1,471,177)
(1,483,414)
Total comprehensive loss attributable to members
of the parent entity
(1,471,177)
(1,483,414)
Cents
(0.038)
(0.038)
Cents
(0.04)
(0.04)
Note
Revenue
Other income - interest
Insurance claim proceeds
Expenses
Accounting and audit fees
Consultants and professional fees
Directors’ fees
Employee benefits expense
Share-based payments
Depreciation
Occupancy expenses
Stock exchange and share registry fees
Travel and accommodation expenses
Insurance
Investor relations
Business development
Exploration costs expensed
Foreign exchange (loss)/gain
IT costs incl licences
Interest expense – ROU asset
Other expenses
Loss before income tax
Income tax
Loss for the period
6
Other comprehensive income
Loss per share:
Basic earnings/(loss) per share
Diluted earnings/(loss) per share
The accompanying notes form part of these financial statements.
ACN 140 575 604 • PO Box 338, Spring Hill, QLD 4004 • +61 (0) 7 3839 3904 • info@alligatorenergy.com.au • Page 8
www.alligatorenergy.com.au
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
AS AT 31 DECEMBER 2024
Note
ASSETS
Current Assets
Cash and cash equivalents
Trade and other receivables
Inventories
Total Current Assets
31 December
2024
$
30 June
2024
$
20,252,739
846,248
3,536
21,102,523
28,392,442
852,721
33,293
29,278,456
706,237
3,840,669
206,799
1,163,993
40,035,716
45,953,414
520,688
3,480,720
239,493
935,000
33,682,236
38,858,137
Total Assets
67,055,937
68,136,593
LIABILITIES
Current Liabilities
Trade and other payables
Lease liabilities
Total Current Liabilities
1,648,185
62,442
1,710,627
1,627,380
62,441
1,689,821
154,287
597,770
752,057
185,061
408,585
593,646
Total Liabilities
2,462,684
2,283,467
Net Assets
64,593,253
65,853,126
100,275,097
256,074
(35,937,917)
100,123,598
324,882
(34,595,354)
64,593,253
65,853,126
Non-Current Assets
Trade and other receivables
Plant and equipment
Right of use asset
Financial assets
Exploration and evaluation expenditure
Total Non-Current Assets
5
6
Non-Current Liabilities
Lease liabilities
Provisions
Total Non-Current Liabilities
EQUITY
Contributed equity
Reserves
Accumulated losses
7
Total Equity
The accompanying notes form part of these financial statements.
ACN 140 575 604 • PO Box 338, Spring Hill, QLD 4004 • +61 (0) 7 3839 3904 • info@alligatorenergy.com.au • Page 9
www.alligatorenergy.com.au
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
FOR THE HALF-YEAR ENDED 31 DECEMBER 2024
Balance at 1 July 2023
Total comprehensive loss for the
period
Contributed
equity
Options
Reserve
Accumulated
Losses
Total
$
$
$
$
72,515,301
175,697
(31,249,670)
41,441,328
-
-
(1,483,414)
(1,483,414)
Transactions with owners in
their capacity as owners:
Share options – value of expense
Options exercised/lapsed
Issue of ordinary shares
Capital raising costs
129,500
156,121
(198,776)
69,276
156,121
-
28,792,000
(1,727,767)
-
-
28,792,000(1,727,767)
Balance at 31 December 2023
99,709,034
133,042
(32,663,808)
67,178,268
Balance at 1 July 2024
100,123,598
324,882
(34,595,353)
(65,853,127)
-
-
(1,471,177)
(1,471,177)
151,499
211,301
(280,109)
128,610
-
-
-
-
()
100,275,097
256,074
(35,937,917)
64,593,253
Total comprehensive loss for the
period
Transactions with owners in
their capacity as owners:
Share options – value of expense
Options exercised/lapsed
Issue of ordinary shares
Capital raising costs
Balance at 31 December 2024
211,301
The accompanying notes form part of these financial statements.
ACN 140 575 604 • PO Box 338, Spring Hill, QLD 4004 • +61 (0) 7 3839 3904 • info@alligatorenergy.com.au • Page 10
www.alligatorenergy.com.au
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
CONSOLIDATED STATEMENT OF CASH FLOWS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2024
31 December
2024
$
31 December
2023
$
Interest received
Payments to suppliers and employees
736,557
(1,738,141)
374,591
(1,538,237)
Net cash outflow from operating activities
(1,001,584)
(1,163,646)
Payments for exploration expenditure
Receipts from Govt Grants for exploration
Payments for security deposits
Payments for purchase of fixed assets
Payments for capital works in progress (FRT)
Investment in EnviroCopper Ltd
(6,331,068)
72,540
(185,545)
(133,136)
(294,421)
(228,993)
(6,337,981)
(35,150)
(122,203)
(1,334,535)
-
Net cash (outflow) from investing activities
(7,100,623)
(7,829,869)
Proceeds on issue of shares
Payment of capital raising costs
Lease payments
(37,496)
28,792,000
(1,727,767)
(37,500)
Net cash inflow from financing activities
(37,496)
27,064,232
Net (decrease)/increase in cash held
(8,139,703)
18,033,218
Cash and cash equivalents at the beginning of the financial
period
28,392,443
18,498,329
Cash and cash equivalents at the end of financial period
20,252,740
36,531,547
Cash flows from operating activities
Cash flows from investing activities
Cash flows from financing activities
The accompanying notes form part of these financial statements.
ACN 140 575 604 • PO Box 338, Spring Hill, QLD 4004 • +61 (0) 7 3839 3904 • info@alligatorenergy.com.au • Page 11
www.alligatorenergy.com.au
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
NOTES TO THE FINANCIAL STATEMENTS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2024
Note 1
General information and summary of significant accounting policies
Basis of preparation of half-year financial statements
These consolidated interim financial statements and notes represent those of Alligator Energy Limited
(the Company) and Controlled Entities (the Group or Consolidated Entity). Alligator Energy Limited is a
publicly listed company incorporated and domiciled in Australia.
These general purpose interim financial statements for the half-year reporting period ended 31 December
2024 have been prepared in accordance with requirements of the Corporations Act 2001 and Australian
Accounting Standard AASB 134: Interim Financial Reporting. The Group is a for-profit entity for
financial reporting purposes under Australian Accounting Standards. The financial statements are
presented in Australian dollars.
This interim financial report is intended to provide users with an update on the latest annual financial
statements of the Group. As such, it does not contain information, or all the notes of the type normally
included in the annual financial report. It is therefore recommended that this financial report be read in
conjunction with the annual financial statements of the Group for the year ended 30 June 2024, together
with any public announcements made during the half-year in accordance with the continuous disclosure
requirements of the Corporations Act 2001 and the ASX Listing Rules.
These interim financial statements have been approved and authorised for issue by the Directors on 13
March 2025 2025. The interim financial report have been prepared on the basis of historical cost, except
for the statement of cashflows. Cost is based on the fair values of consideration in exchange for assets.
Significant accounting policies
The same accounting policies and methods of computation have been followed in this half-year financial
report as were applied in the most recent annual financial statements, except in relation to the matter
discussed below.
New and revised accounting requirements applicable to the current half-year reporting period
The group has adopted all of the new or amended Accounting Standards and Interpretations issued by
the Australian Accounting Standards Board (‘AASB’) that are mandatory for the current reporting
period. Any new or amended Accounting Standards or Interpretations that are not yet mandatory have
not been early adopted. None of the new standards or amendments to standards that are mandatory for
the first time materially affected any of the amounts recognised in the current period or any prior period.
ACN 140 575 604 • PO Box 338, Spring Hill, QLD 4004 • +61 (0) 7 3839 3904 • info@alligatorenergy.com.au • Page 12
www.alligatorenergy.com.au
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
NOTES TO THE FINANCIAL STATEMENTS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2024
Note 1
General information and summary of significant accounting policies (continued)
Going Concern
The financial statements have been prepared on a going concern basis that presumes the realisation of
assets and the discharge of liabilities in the normal course of operations for the foreseeable future.
During the six months ended 31 December 2024, the Group made an operating loss before tax of
$1,471,177 (2023: $1,483,414). Cash outflows from operating and exploration-related investing
activities during the same period were $7,332,652 (2023: $8,836,162). The Group’s ability to continue
on a going concern basis is therefore dependent upon its ability to manage its current cash resources,
raise additional capital through farm-out arrangements with strategic partners or share issues to existing
shareholders or new investors.
The Directors are confident of being able to manage the current cash resources and expenditure
commitments as appropriate and to continue to secure additional funding requirements as necessary.
On this basis they believe the Group is a going concern and will be able to pay its debts as and when
they fall due and payable.
Note 2
Critical accounting estimates and judgements
Estimates and judgements are continually evaluated and are based on historical experience and other
factors, including expectations of future events that may have a financial impact on the entity and that
are believed to be reasonable under the circumstances.
Critical judgements in applying the entity’s accounting policies
The Group has capitalised exploration expenditure of $40,035,716 (30 June 2024: $33,682,236). This
amount includes costs directly associated with exploration and the purchase of interests in exploration
titles. These costs are capitalised as an intangible asset until assessment and/or drilling of the permit is
complete and the results have been evaluated. These direct costs include employee remuneration,
materials, rentals, camp costs and payments to contractors for services such as drilling and geotech
surveys. The expenditure is carried forward until such a time as the area moves into the development
phase, is abandoned or sold. Given exploration activities have not yet reached a stage which permits a
reasonable assessment of the existence or otherwise of recoverable resources and the difficulty in
forecasting cash flows to assess the fair value of exploration expenditure, there is uncertainty as to the
carrying value of exploration expenditure. The ultimate recovery of the carrying value of exploration
expenditure is dependent upon the successful development and commercial exploitation or,
alternatively, sale of the interest in the tenements. The Directors are of the opinion that the exploration
expenditure is recoverable for the amount stated in the financial report.
Provision for site restoration
The Group estimates the cost of rehabilitating disturbances as a result of exploration activity. These
estimates are based on the requirements of current legislation, comprise an estimate of the external costs
to rehabilitate and are consistent with the amounts reported to the Department of Tourism, Industry and
Trade in the Northern Territory and the Department of Energy and Minerals in South Australia.
ACN 140 575 604 • PO Box 338, Spring Hill, QLD 4004 • +61 (0) 7 3839 3904 • info@alligatorenergy.com.au • Page 13
www.alligatorenergy.com.au
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
NOTES TO THE FINANCIAL STATEMENTS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2024
Note 3
Segment information
Operating segments are identified, and segment information disclosed, on the basis of internal reports
that are regularly provided to, or reviewed by, the Group’s chief operating decision maker which, for
the Group, is the Board of Directors. In this regard, the Board of Directors confirms that the Group
continues to operate in on