Quarter Highlights
Alligator Energy Limited (“Alligator”, “AGE” or the “Company”) is pleased to release the 30 June 2025 Quarterly
Activities Report.
Significant Highlights for the Quarter include:
Samphire Project
•
•
•
•
•
The Program for Environment Protection and Rehabilitation (PEPR) addressing conditions of the RL
and operation of the FRT is still in the assessment phase by DEM, the EPA, and the Department of
Environment and Water (DEW).
Achieved a key milestone in receiving the Works Approval License from the EPA for construction of
the FRT.
An update of the Blackbush JORC Mineral Resource Estimate (MRE) incorporating AGE’s 2024
drilling results has been completed. The Indicated portion of the MRE increased by 10% from the
previous MRE to 14.2 Mlbs at an average grade of 786ppm U3O8.
The Total MRE has increased by 3% to 18.0 Mlbs at an average grade of 676ppm U3O8.
Drilling of three investigation wells required for the FRT groundwater baseline has been completed on
site.
Big Lake Project
•
•
Big Lake exploration activities were postponed due to flooding in the Cooper Basin region following
significant monsoonal rain in Qld.
AGE has been monitoring the flood event and has begun preparing a revised AC drilling program
planned for Q4 2025 if conditions allow. Sampling at the Adelaide drill core library, the collection of
historic information from petroleum wells and the analysis of 2024 drilling data is ongoing.
Alligator Rivers Projects
•
•
A work program meeting was held with traditional owners and the NLC regarding planned work over
the next two years.
AGE is co-funding a component of the NTGS West Arnhem Ground Gravity Survey which covers key
future target areas of the Tin Camp Creek (TCC) project.
Corporate and Uranium Market
•
•
•
•
•
Cash balance at quarter end of $30.1 M, inclusive of the Share Placement concluded in June 2025
Successful completion of a Share Placement to raise $17.25M (before costs). The Share Placement
was strongly supported by institutional investors, both in Australia and overseas and has materially
strengthened the Alligator share register.
During the quarter the Company advised that Andrea Marsland-Smith, the current COO, would be
appointed to the CEO role on 1 July 2025 and Greg Hall moving to the part-time role of Executive
Director - Marketing & Investor Relations.
The spot U3O8 price ended the quarter at US$78.50/lb (March 2025: US$64/lb) but has since drifted
lower. The long-term U3O8 price was maintained at US$80/lb U3O8 (March 2025: US$80/lb).
Key uranium and nuclear market developments included:
- President Trump signed four executive orders aimed at streamlining the regulatory process for the
US nuclear fuel-cycle, including new reactor approvals, reactor extensions and new reactor
technologies, with the objective of re-establishing the U.S. as the global leader in nuclear energy.
- AI group Meta signed a 20-year Power Purchase Agreement with Constellation Energy.
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 2 of 19
3
-
The World Bank removed its ban on funding nuclear energy, aiming to include it in a new
comprehensive energy funding strategy.
China’s State Council approved construction plans for 10 new reactors. 30 reactors are currently
under construction and the country’s fleet is expected to reach 200 GW by 2040, versus 60 GW
last year.
Plans for the forthcoming quarter:
•
Samphire
-
•
Big Lake
-
•
AGE has been monitoring the flood event and has begun preparing a revised Air Core drilling
program planned for Q4 2025 if conditions allow.
Sampling and analysis of core at the Adelaide drill core library.
Data mining of historic information from petroleum wells and analysis of 2024 drilling data is ongoing.
Alligator Rivers
-
•
Continue to engage with DEM, EPA and DEW regarding assessment of the PEPR and final approval,
with FRT on-site construction start timing dependent on this notification.
Preparation of scope documents ahead of commencing a tender process to select definitive
feasibility study consultants.
Continued review and technical interpretation of 2024 geochemistry and geophysics in conjunction
with all Alligator River project data, and target development and work program generation.
Mine Management Plan approvals finalised for future work at TCC.
Field visit for rehabilitation/environmental monitoring and reporting in conjunction with local
community stakeholder engagement and site maintenance.
Annual audit inspection by the Office of the Supervising Scientist (OSS) scheduled for late August.
Piedmont
-
Based on the limited market interest in acquiring the Project, in mid-July work commenced to
relinquish the four granted licences.
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 3 of 19
4
Samphire Uranium Project Development
The Company received formal advice from the DEM on 13 January 2025 of the grant of a RL for the
purposes of conducting a field recovery trial at the Samphire Project. AGE submitted the Program for
Environment Protection and Rehabilitation (PEPR) to DEM on 14th March 2025 which governs how the trial
will be conducted. Formal request for information (RFI) was received from DEM on 23 May 2025. AGE
submitted its responses in mid-June which remain under assessment by DEM, EPA and DEW.
•
Approval of the PEPR is the final step in the DEM regulatory process to commence on-site
construction of the FRT infrastructure. Figure 1 shows the indicative Schedule for Samphire
Field Recovery Trial - PEPR approval, construction and operations.
•
Construction licensing with the EPA and SafeworkSA licensing completed.
•
Drilling of three investigation wells required for the FRT groundwater baseline characterisation and
then for the FRT has been completed on site.
Figure 1 – Indicative Schedule for Samphire Field Recovery Trial - PEPR approval, construction and operations.
Subject to DEM (and Co-Regulators) approval of the PEPR
•
An update of the JORC Mineral Resource Estimate (MRE) for the Blackbush deposit has been
completed (Figure 2).
-
-
With the addition of the 2024 resource drilling, the Indicated portion of the MRE has been
further increased by 10% from the previous MRE to 14.2 Mlbs at an average grade of
786ppm U3O8.
The Total MRE (Inferred and Indicated) has increased by 3% to 18.0 Mlbs at an average
grade of 676ppm U3O8.
0.5 Mlbs were added to the Total Resource, and 1.3 Mlbs were converted to the Indicated
Resource Category.
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 4 of 19
5
Figure 2 – Collar locations (pre 2024 blue dots, 2024 in black dots) and current Indicated (red shell), Inferred (green
shell) and Unclassified (pale green shell) MRE.
Big Lake Uranium (BLU) Project
•
As per ASX release 23 October 2024, drilling at BLU Site 10 on EL6367 (Figure 3) returned significant
thicknesses of unconsolidated sands and elevated uranium values which were confirmed by assay
(Figures 3 & 4). Four holes recorded uranium values at over 100 ppm, including two intersections within
porous sands of greater than 20 m thickness.
•
Approval of the exploration PEPR was received early Q1 for a program comprising up to 30 aircore
holes to test targets identified in the Namba Formation and up to 20 rotary-mud holes to test targets
identified in the Eyre Formation to approximately 250m depth.
•
In late February 2025 the Company initiated a rotary mud drilling program at the Big Lake Project
targeting both the Namba and Eyre formations, with two drill holes completed.
•
In March flood alerts were issued for the Cooper and Strzelecki Creeks with local graziers and oil and
gas companies commencing flood mitigation procedures. After considering the potential for a significant
period of disruption and the safety of personnel and equipment, AGE decided to initiated demobilisation
procedures and issued a force majeure notice to its drilling contractor.
•
By April many of AGE’s planned drilling areas were impacted, including our mobile camp site, and road
access to Moomba, Innamincka and surrounds. Floodwaters have since begun to recede however
damage to local infrastructure and current road closures still prevent access to the region.
•
AGE has been monitoring the flood event and has begun preparing a revised AC drilling program
planned for Q4 2025 if conditions allow. Sampling at the Adelaide drill core library, the collection of
historic information from petroleum and analysis of 2024 drilling data is ongoing.
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 5 of 19
6
Figure 3: Alligator’s significant tenement holding, southern Cooper Basin (Big Lake Project) - location of Site 10
denoted.
Figure 4: Drillhole location map (Site 10) showing uranium grades (ppm) encountered in AGE’s 2024 drilling
program. Rotary Mud drilling in this area will be targeted to both expand the mineralisation footprint and look for
deeper sand units.
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 6 of 19
7
Alligator Rivers Uranium Province (ARUP)
•
Work at the Company’s ARUP Projects during the quarter focused on retaining the projects in good
standing through compliance reporting and in-house technical works along with progressing
approvals and targeting activities for the next phase of exploration activity.
•
The Company has taken up an option for co-funding a component of the NTGS West Arnhem Ground
Gravity Survey which is due to commence during July 2025. The NTGS is set to undertake helicopter
supported ground gravity across a large portion of the Alligator Rivers region and West Arnhem at
4km spacing with the option for exploration companies to fund infill areas at up to 500m spacing.
Alligator has selected an area approximately 80km2 in the north of EL24922 (Tin Camp Creek) with
broad sandstone cover up to 300m deep for infill by NTGS. The survey represents excellent value
for the Company based on the cost per station, and that there is no logistics or support requirements
from AGE. The capture of detailed gravity in this region will provide additional targeting mechanisms
to identify key structures and stratigraphic intercepts below the unconformity in a region where strong
radiogenic ground waters ebb from below the deep sandstone cover bearing key Uranium derived
isotopes and indicators.
•
A work program meeting was held with traditional owners and the NLC in Gunbalanya during April
consulting on a range of proposed and completed works at the Nabarlek North project, with consent
obtained for all proposed work programs. While exploration activity will be limited during 2025 across
the Alligator Rivers, key rehab inspections and targeting work is continuing, along with community
engagement programs.
Piedmont Nickel Cobalt Project - NW Italy (Ni, Au, Cu, Co – AGE: 51% JV)
•
Marketing of the Piedmont Project to interested parties continued during the quarter with the focus on
outlining the gold exploration potential of the licences given the historical mine workings in the region.
•
Based on the limited market interest in acquiring the Project, the Company agreed with its JV
partners in mid-July 2025 to relinquish the licences and discontinue this business operation. The
financial impact of this decision at quarter end is immaterial as the Company has previously impaired
most of the exploration expenditure on the Project.
Investment in EnviroCopper Limited (ECL) – Cu ISR
AGE: 15.61% interest
•
During the quarter, ECL received approval from the Department for Energy and Mining (DEM), for a
90 day in-ground Site Environmental Lixiviant Trial (SELT) to confirm economic modelling for potential
copper extraction. The SELT is expected to commence in the coming quarter. If successful, this trial
may lead to feasibility studies and a mining lease application under the Mining Act (SA) for a Copper
ISR mine at Kapunda.
•
First stage pump testing has been undertaken during the quarter at ECL’s second project, Alford West,
to establish hydrogeological parameters and test ISR amenability. Initial pumping test results fall in
the range for successful ISR operations. Once this testing has been completed then tracer tests will
be planned for later in the quarter, subject to receipt of Drain and Discharge permit approvals.
•
ISR factors arising from the Kapunda approval process have now been included in the DEM’s ePEPR
form. This initiative provides a “template” for companies to take to other ISR projects which may
significantly improve approval timeframes.
•
ECL remains in ongoing investment discussions with international investors focused on copper ISR
for a significant equity injection.
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 7 of 19
8
Market Update
The spot U3O8 price ended the quarter 22% higher at ~US$78.50/lb (March 2025 - ~US$64.23/lb), however
has since drifted lower. The UxC long term price indicator was maintained at US$80/lb U 3O8 for the month of
June 2025.
Key market drivers by both Governments and big technology companies during the quarter were:
• United States
President Trump signed four executive order reforms aimed at streamlining the regulatory process for the
US nuclear fuel-cycle, including approvals on new reactors, reactor extensions and new reactor
technologies, with the objective of re-establishing the U.S. as the global leader in nuclear energy.
President Trump also issued an executive order to address U.S. reliance on foreign sources for processed
critical minerals, including uranium, under Section 232 of the Trade Expansion Act.
Meta signed a 20-year Power Purchase Agreement to buy 1,121 megawatts from Constellation Energy’s
Clinton nuclear plant in Illinois starting in mid-2027.
Westinghouse and Google are partnering to apply AI tools to streamline construction of the Westinghouse
AP1000 nuclear reactors, with a successful proof of concept achieved.
The World Bank removed its ban on funding nuclear energy, aiming to include it in a new comprehensive
energy strategy, with funding to be available for extensions of existing reactors and the development of
SMRs. The World Bank and the International Atomic Energy Agency (IAEA) signed an agreement to
support the safe and responsible use of nuclear energy in developing countries.
• Asia
China’s State Council approved construction plans for 10 new reactors. 30 reactors are under
construction, and the country’s nuclear reactor fleet is expected to reach 200 gigawatts by 2040, versus
60 gigawatts last year.
India announced a target to increase uranium imports almost four-fold by 2033, from ~5.7 MMlbs U3O8
over the past 5-years, to ~19.8 MMlbs in total over 2025-2033
Indonesia plans to build 10 GWe of nuclear power by 2040 as part of a broader 103 GWe clean energy
expansion to reach carbon neutrality before 2050.
Japan enacted the GX Decarbonized Power Sources Act, lifting the 60-year cap on nuclear reactor
lifespans to support energy security and decarbonization goals.
• Europe
The European Commission projects a base case of 109 GWe by 2050 (from 98 GWe in 2025), or a level
of 144 GWe by 2050 if all existing reactor lives are extended and existing planned projects are delivered.
Poland approved €14.5 billion in financing for its first nuclear power plant, in partnership with U.S.-based
Westinghouse, aiming for full commercial operation by early 2039.
Norway has launched its first formal review of nuclear power with an EIA plan led by three national
agencies, due by September.
The UK government is investing GBP 14.2 billion to build Sizewell C—a “replica” of Hinkley Point C with
two EPR reactors (3.2 GW) to power around six million homes for at least 60 years.
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 8 of 19
9
Corporate
•
Cash balance at quarter end of $30.1 M, inclusive of the proceeds from the June 2025 share placement
referred to below.
•
In June 2025, the Company received firm commitments to raise $17.25M (before costs) via placement
to institutional and sophisticated investors. The Placement was strongly supported by institutional
investors, both in Australia and overseas and has materially strengthened the Alligator share register.
The Placement involved the issue of 556M new ordinary shares at $0.031 per share and a one for
two option issue (Options) at an exercise price of $0.047 with a two-year life from the date of issue.
•
The Options are intended to be quoted options, subject to compliance with the relevant ASX Listing
Rules and the Corporations Act, and will be issued subject to shareholder approval, to be sought at a
general meeting of the Company scheduled for 28 August 2025.
•
The funds raised through the Placement will enable the Company to accelerate progress and expand
its work programs on its key uranium projects and enable evaluation of business development
opportunities.
•
During the quarter, the Company advised that Greg Hall, CEO and Managing Director, would be
moving to the part-time role of Executive Director - Marketing & Investor Relations and that Andrea
Marsland-Smith the current COO would be assuming the CEO role effective from 1 July 2025.
•
Recruitment is underway for two executive operational roles supporting the new CEO, namely General
Manager, Approvals and Sustainability and General Manager, Operations.
•
Capital Structure and Listing Rule 5 disclosures
At 30 June 2025, the Company had the following capital structure and cash balances:
As at 30 June 2025
Cash Balance
A$30.1M
Ordinary Fully Paid Ordinary Shares (AGE)
4,430.1M
Listed Options 7.8c (Exp 28/11/25) (AGEOC)
273.9M
Unlisted Options 8.1c (Exp 01/12/25)
132.0M
Unlisted Employee Incentive Performance Options
39.9M
Director Share Options
14.4M
Expenditure on exploration and evaluation activities during the June 2025 quarter totalled $1,969k
(previous quarter - $2,061k) and related principally to advancing the Samphire Project and upcoming
Field Recovery Trial.
Payments to related parties including non-executive director fees and the salary of the CEO and
Managing Director for the March quarter totalled $139k (previous quarter $129k).
This announcement has been authorised for release by the CEO.
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 9 of 19
10
Contacts:
For more information, please contact:
Ms Andrea Marsland-Smith
Mr. Mike Meintjes
CEO
CFO & Company Secretary
ams@alligatorenergy.com.au
mm@alligatorenergy.com.au
For media enquiries, please contact:
Alex Cowie
Media & Investor Relations
alexc@nwrcommunications.com.au
Competent Person’s Statement
Uranium
Information in this report is based on current and historic Exploration and Resource Drilling Results related to the Alligator
projects is based on and fairly represents information provided by Dr Andrea Marsland-Smith who is a Member of the
AusIMM. Dr Marsland-Smith is employed by Alligator Energy as Chief Executive Officer (CEO) and has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity she
is undertaking (including 21 years working with ISR uranium development and operations) to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves. Dr Marsland-Smith consents to the inclusion in this release of the matters based on her information in
the form and context in which it appears.
In relation to Exploration results referred to in this Quarterly report, the Company confirms that it is not aware of any new
information or data that materially affects the information included in the original market announcement and that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply
and have not materially changed. In relation to the mineral resource estimate referred to in AGE ASX release 6 May 2025
or the production target referred to in AGE ASX release 14 December 2023 that is relevant for underpinning the field
recovery trial at Samphire, the Company confirms that all material assumptions underpinning the production target, and
the forecast financial information derived from the production target, in the initial announcement continue to apply and have
not materially changed.
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 10 of 19
11
Forward Looking Statement
This announcement contains projections and forward-looking information that involve various risks and uncertainties
regarding future events. Such forward-looking information can include without limitation statements based on current
expectations involving a number of risks and uncertainties and are not guarantees of future performance of the Company.
These risks and uncertainties could cause actual results and the Company’s plans and objectives to differ materially from
those expressed in the forward-looking information. Actual results and future events could differ materially from anticipated
in such information. These and all subsequent written and oral forward-looking information are based on estimates and
opinions of management on the dates they are made and expressly qualified in their entirety by this notice. The Company
assumes no obligation to update forward-looking information should circumstances or management’s estimates or opinions
change.
About Alligator Energy
Alligator Energy Ltd is an Australian, ASX-listed, exploration company focused on uranium and energy related minerals,
principally through its equity interest in EnviroCopper Limited. Alligator’s Directors have significant experience in the
exploration, development and operations of both uranium and copper projects.
Projects
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 11 of 19
12
Alligator Group Tenure Holdings at Quarter End:
The following information is provided pursuant to Listing Rule 5.3.3 for the quarter ended 30 June
2025.
ARUP (NT) Uranium
Licence Number
Ownership
Interest
Area
(km2)
State
Status
TCC Project P/L
100
76.79
NT
Granted
TCC Project P/L
100
194.59
NT
Granted
TCC Project P/L
100
11.55
NT
Granted
EL24291
Tenement
Name
Tin Camp
Creek
Tin Camp
Creek
Tin Camp
Creek
Beatrice
Alligator Energy Ltd
100
337.21
NT
Granted
EL26796
Beatrice
100
19.77
NT
Granted
EL27252
Nabarlek North
100
6.75
NT
Granted
EL27253
Nabarlek North
100
5.61
NT
Granted
EL28389
Nabarlek North
100
110.83
NT
Granted
EL28390
Nabarlek North
100
33.58
NT
Granted
EL29991
Nabarlek North
100
26.87
NT
Granted
EL29992
Nabarlek North
100
63.81
NT
Granted
EL29993
Nabarlek North
100
57.06
NT
Granted
EL31480
Nabarlek North
Alligator Energy Ltd
Northern Prospector
P/L
Northern Prospector
P/L
Northern Prospector
P/L
Northern Prospector
P/L
Northern Prospector
P/L
Northern Prospector
P/L
Northern Prospector
P/L
Northern Prospector
P/L
100
188.44
NT
Granted
Alligator Energy Ltd
100
123.88
NT
Application
Northern Prospector
P/L
100
907.44
NT
Applications
EL24921
EL24922
EL25002
EL26793, EL26794,
Beatrice
EL26795
EL27777, EL27778,
EL28176, EL28293,
EL28315, EL28863,
EL28864, EL28865,
Various
EL28950, EL31452,
EL31453, EL31454,
EL32075, EL32389,
EL32390, EL32391
Eyre Peninsula (SA) Uranium
EL5926
Samphire
S Uranium Pty Ltd
100
332
SA
Granted
EL6350
Samphire
S Uranium Pty Ltd
100
38
SA
Granted
EL6835
Samphire
S Uranium Pty Ltd
100
61
SA
EL6901
Samphire
S Uranium Pty Ltd
100
119
SA
Granted
Granted
100
818
SA
Granted
100
841
SA
Granted
100
877
SA
Granted
100
978
SA
Granted
100
939
SA
Granted
100
994
SA
Granted
Cooper Basin (SA) Uranium
EL6367
Big Lake
EL6847
Big Lake
EL6848
Big Lake
EL6849
Big Lake
EL6902
Big Lake
EL6903
Big Lake
Big Lake Uranium
Pty Ltd
Big Lake Uranium
Pty Ltd
Big Lake Uranium
Pty Ltd
Big Lake Uranium
Pty Ltd
Big Lake Uranium
Pty Ltd
Big Lake Uranium
Pty Ltd
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 12 of 19
13
EL6904
Big Lake
Big Lake Uranium
Pty Ltd
100
975
~51*
16.50
~51*
13.50
~51*
3.77
~51*
36.78
SA
Granted
Piedmont (NW Italy) Ni-Co – JV
P0038V
Laghetto
P0050V
Gavala
P0044V
Valmaggia
P0042V
Sella Bassa
AGE EV Minerale
SrL
AGE EV Minerale
SrL
AGE EV Minerale
SrL
AGE EV Minerale
SrL
PIE
(Italy)
PIE
(Italy)
PIE
(Italy)
PE
(Italy)
Granted
Granted
Granted
Granted
Blackbush Mineral Resource Estimate reported above a 250ppm U3O8 cut-off.
JORC Category
Mt
Grade
(U3O8 ppm)
U3O8 Metal
(Mlbs)
Indicated
8.2
786
14.2
Inferred
3.9
443
3.8
Total
12.1
676
18.0
The model is reported unconstrained and above a 250 ppm U3O8 lower cut-off grade for all zones in
consideration of potential for recovery by in situ leach processes.
There is no historical depletion by production within the model area.
Estimation of the disequilibrium factored and topcut gamma data (feU3O8c) is by ordinary kriging using
dynamic anisotropy for the mineralised zone.
Density is estimated by nearest neighbour estimation within the Kanaka Beds on the basis of logged geology
as either 1.79 t/m3 for lignitic material or 1.92 t/m3 for other sediments; other paleochannel stratigraphies
had a default of 1.90 t/m3 assigned; saprolite capping the basement granite was assigned a bulk density of
2.16 t/m3 and the primary basement granite was assigned a nominal bulk density of 2.70 t/m3.
The model assumes agglomeration of 12.5mE x 12.5mN x 1mRL parent blocks for definition of well fields for
production.
The model does not account for dilution, ore loss, hydrogeology, or recovery issues. These parameters should
be considered during the mining study as being dependent on the ISL treatment process.
Classification is according to JORC Code Mineral Resource categories.
Totals may vary due to rounded figures.
The mineral resource estimate in this report was reported by the Company in accordance with listing rule 5.8
on 6 May 2025. The Company confirms it is not aware of any new information or data that materially affects
the information included in the previous announcement and that all material assumptions and technical
parameters underpinning the estimates in the previous announcement continue to apply and have not
materially changed.
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 13 of 19
14
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Alligator Energy Limited
ABN
Quarter ended (“current quarter”)
140 575 604
30 June 2025
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Current quarter
$A’000
Year to date (12
months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs (incl State Payroll Taxes)
(359)
(1,545)
(e) administration and corporate costs
(320)
(1,572)
80
1,111
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
49
161
1.8
Other (annual insurances)
-
(134)
1.9
Net cash from / (used in) operating
activities
(550)
(1,979)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(318)
(769)
(1,969)
(10,361)
(e) investments (EnviroCopper)
-
(1,100)
(f)
-
-
(c) property, plant and equipment (incl
FRT construction)
(d) exploration & evaluation
other non-current assets
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 14 of 19
15
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (12
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (property and tenement bonds)
-
(186)
2.6
Net cash from / (used in) investing
activities
(2,287)
(12,416)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
17,250
17,250
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(1,041)
(1,041)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
Share your feedback
Discover