CEO Presentation - 2023 AGM
Released
Released
Announcement PDF
ASX: AGE
Annual General Meeting
CEO Update – November 2023
Disclaimer
Disclaimer
This presentation contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can
include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance of the Company.
These risks and uncertainties could cause actual results and the Company’s plans and objectives to differ materially from those expressed in the forward-looking information. Actual
results and future events could differ materially from anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates
and opinions of management on the dates they are made and expressly qualified in their entirety by this notice. The Company assumes no obligation to update forward-looking
information should circumstances or management’s estimates or opinions change.
Competent Person’s Statement – Uranium
Information in this report is based on current and historic Exploration and Resource Drilling Results compiled by Dr Andrea Marsland-Smith, who is a Member of the AusIMM. Dr
Marsland-Smith is employed by Alligator Energy as Chief Operating Officer (COO) and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity she is undertaking (including 15 years working with ISR uranium development and operations) to qualify as a Competent Person as defined in
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr Marsland-Smith consents to the inclusion in this release of
the matters based on her information in the form and context in which it appears.
Competent Person’s Statement – Nickel Cobalt exploration
Information in this report is based on current and historic Exploration Results compiled by Mr Geoffrey Chapman who is a Fellow of the Australasian Institute of Mining and
Metallurgy. Mr Chapman is a Consultant Geologist with Alligator Energy Limited, and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves. Mr Chapman consents to the inclusion in this release of the matters based on his information in the form and context in which it
appears.
2
Annual General Meeting – CEO Update | November 2023 | ASX:AGE
Company Snapshot
Capital Structure (at 23 November 2023)
Leading Uranium Focussed Board
Share Price
Member
0.059
Ordinary Shares*
3,862.3 M
Performance Shares & Unlisted Options
175.3 M
Cash at 30 September*
[Add’n $3.26M from SPP on 20 Oct 2023]
~$37.9 M
Market Cap
$227.9 M
Top 50 Shareholders
(30 June 2023)
Brokers &
Banks
19%
Retail
53%
Directors &
Executives
7%
Institutions
21%
3
Paul Dickson
Chairman
Description
Paul is a finance and corporate advisory professional with more than 30 years’
experience in the finance services industry.
Paul has been an AGE Board member since inception and Chairman for 3 years.
Gregory Hall
CEO & Managing Director
Greg is an experienced mining engineer and CEO with 35+ years’ experience in
uranium and other mine management. He previously held roles at WMC Olympic
Dam & nickel mines, LKAB Iron Ore (Sweden), ERA Ranger & Jabiluka Uranium and
international commodities marketing with Rio Tinto (ERA) Uranium, and Bauxite &
Alumina groups. Greg was also founding CEO of Toro Energy Ltd.
Peter McIntyre
Non-Executive Director
Peter is a civil engineer and experienced CEO. He previously held GM roles with
WMC Ltd, including development of major mining projects. Peter was the founding
MD of Extract Resources during the discovery and pre-feasibility of Husab Uranium
mine in Namibia, sold for US$2.2 billion.
Fiona Nicholls
Non-Executive Director
Fiona has 30 years of experience working across a range of business functions
including strategy, planning, ESG and operations, multi-country project development
and approvals and due diligence processes. Fiona was previously on the Board of
Rössing Uranium and alternate director for ERA uranium.
Callum McIntyre
Alternate Non-Executive Director
Callum has extensive experience in the finance and technology industries, both in
Australia and overseas. Previously based in London with international finance group
Thomson Reuters.
* Note as of 20 Sept 2023, AGE announced a successful placement of 491M shares to institutional and sophisticated
investors at A$0.052 for a raising of $25.5M before costs. An SPP to all shareholders was subsequentially undertaken
raising an additional $3.26M announced on 20 October 2023.
Annual General Meeting – CEO Update | November 2023 | ASX:AGE
Board & Management
Board and Management Team
Paul Dickson
Non-Executive Chairman
Gregory Hall
CEO & Managing Director
Mike Meintjes
CFO & Company Secretary
4
Annual General Meeting – CEO Update | November 2023 | ASX:AGE
Peter McIntyre
Non-Executive Director
Dr Andrea Marsland-Smith
COO
Fiona Nicholls
Non-Executive Director
Callum McIntyre
Alternate Director
Mike Barlow
Exploration Manager
Capital raise and share performance
June Quarterly report - $2.3M spend
– $18.5M cash –
Highlighted upcoming expenditure:
• ramp up of Samphire pilot plant
procurement and fabrication,
ongoing resource drilling,
hydrogeological well drilling
• ARUP IP survey and increased
drilling, BLU indigenous survey
Sept Quarterly report - $4.5M spend
- $37.9M cash ($14M retained plus
$23.9M net placement)
Additional $3.26M SPP proceeds post
quarter end
5
Annual General Meeting – CEO Update | November 2023 | ASX:AGE
Alligator Energy: Multi-Project Uranium & Energy Mineral Portfolio
Samphire Uranium Project, SA
• Defined uranium JORC Resource and Scoping Study with
competitive economics. Significant scope to expand
resource.
Alligator Rivers Uranium Province, Arnhem Land, NT
• Existing JORC Resource Estimate and exploration
activity underway focused on area north of U40 Prospect.
Big Lake Project, Cooper Basin, SA
• ISR uranium model – Inaugural exploration program
underway.
Piedmont Project, Italy
• Nickel and cobalt exploration in historical mining region.
AGE will continue to evaluate and acquire further uranium or
energy mineral assets in key target regions.
6
Annual General Meeting – CEO Update | November 2023 | ASX:AGE
Uranium and Nuclear Fuel - Commodity Price Drivers
Key drivers behind the market and Uranium spot price:
•
Global Energy Transition – Net Zero by 2050 initiative
- Biden Administration and EU support for nuclear
- 60 reactors under construction across 15 countries –
- 11 reactors (33 still in commissioning) restarted in Japan
•
Increased global energy security concerns
- Ukraine war/Russian sanctions – reduction of EUP
offtake from Russia
•
Inventory rundown – LT contracting up
- Limited new production, supply disruption (Niger) and
emergence of EFTs (Sprott/Yellow Cake)
- Conversion and enrichment supply issues
- During 2022, 122 Mlbs put under LT contract
- By Oct 2023, already 150 Mlbs under LT contract
7
Annual General Meeting – CEO Update| November 2023 | ASX:AGE
Medium term influences – advancing technologies –
SMRs (< 300MW) and Micros (1-10MW)
Samphire Uranium Project: Introduction
ISR uranium project near Whyalla, with robust economics
•
Proven In Situ Recovery (ISR) operation planned, allowing
very low impact mining.
•
JORC Resource Estimate of 18.1Mlbs U3O8.
•
Robust initial Scoping Study based on 10Mlbs U3O8 over
12 years, using Blackbush Deposit only.
•
Drilling ongoing to support a further Resource Estimate
update at Blackbush.
•
Scoping Study update in parallel targeting improved
economics.
•
Exploration target range (including Plumbush) being
determined – resource growth potential
•
Field Recovery Trial for 1H of 2024* to confirm parameters
to be used in a full feasibility study during 2024.
* On receipt of all regulatory approvals
8
Annual General Meeting – CEO Update | November 2023 | ASX:AGE
Samphire Uranium Project Scoping Study: Key Metrics
A$129.3 m
3.5 years
29%
A$152.0 m
US$30.20 /lb
US$17.9 /lb
CAPEX
(including contingency)
Payback
IRR*
(post-tax, real, ungeared)
NPV8*
(post-tax, real, ungeared)
AISC
(A$ 43.2 /lb)
Cash Costs
(A$25.6 /lb)
*Calculated using US$65 per lb uranium price and 0.70 US/A$ exchange rate inclusion of significant contingencies and inflation of 40%.
Currently undertaking Resource update, Scoping Study update targeting increased production target of 1.2Mlbs pa,
and Exploration Target range estimates for Nov / early Dec announcement .
Current Resource
JORC Category
Mt
Grade
(U3O8 ppm)
U3O8 Metal
(KTonnes)
U3O8 Metal (Mlbs)
Indicated
6.1
796
4.8
10.7
Inferred
5.3
633
3.4
7.4
Total
11.4
720
8.2
18.1
ASX Release – 2 March 2023
9
Annual General Meeting – CEO Update| November 2023 | ASX:AGE
Samphire Uranium project: Competitive and Optimisation Opportunities
•
Conceptual Model of ISR
ISR - Low initial capital cost estimate, despite inclusion
of significant contingencies and inflation of 40%.
•
Low end AISC due to shallow deposit, excellent
formation porosity, high leaching dynamics
•
Location near Whyalla offers locally based workforce (no
FIFO and camp), experienced mining services and
business support, lower cost of key infrastructure.
Potential to scale and optimise plant
•
Currently undertaking resource and Scoping Study update – plan for increased production target of 1.2Mlbs pa.
•
Modular plant makes production capacity scalable.
•
Further exploration potential for additional uranium at Blackbush deposit, then south to Plumbush deposit plus
wider exploration on known channels.
•
Scope for processing efficiencies, in particular to reduce costs around RO plant, and increase recovery rates.
10 Annual General Meeting – CEO Update | November 2023 |
ASX:AGE
Samphire Uranium Project – Scope for Mineral Resource Growth
Strong Resource growth potential at Blackbush
•
Currently 18.1Mlbs U3O8 from 11.4 million
tonnes at 720 ppm U3O8.
•
Coherent multi-level high-grade zones with
cumulative strike length of >2,700m and width
between 300-450m.
11 Annual General Meeting – CEO Update | November 2023 |
ASX:AGE
Samphire Uranium Project – Scope for Resource Growth
Local and district-scale resource growth potential
• Plumbush Deposit not adequately tested nor is its
relationship to Blackbush Deposit known.
• High-resolution ground gravity acquired September 2022 to
improve palaeochannel resolution.
• Regional ground gravity shows significant palaeochannel
extensions.
− Immediate focus for near-future drill programs
− Potential for palaeochannel system to extend north and
south of the current defined area
− Potential for additional satellite deposits
• Developing an ‘exploration target range’ for the Project.
Regional filtered ground gravity showing potential palaeochannel extensions and Blackbush palaeochannel (defined by drilling).
12 Annual General Meeting – CEO Update | November 2023 |
ASX:AGE
Samphire Uranium Project: Next steps
Intention to rapidly progress next steps
DECEMBER 2023
FABRICATION OF
CONTAINERISED PILOT
PLANT COMPLETE
NOVEMBER 2023
SCOPING STUDY UPDATE
COMMENCE FIELD
RECOVERY TRIAL (FRT)
(Subject to DEM approvals)
Q4 2024
FURTHER RESOURCE
UPDATE
2023
Q3
Q1 2025
INITIAL CONDITIONAL
OFFTAKE CONTRACTS
2025
2024
Q4
Q1
SEPTEMBER 2023
COMPLETE RESOURCE DRILLING
DECEMBER 2023
FEASIBILITY STUDY
ENGINEERING
NOVEMBER 2023
EOI/TENDERS
UPDATED SAMPHIRE
RESOURCE
NOVEMBER 2023
RELEASE OF
EXPLORATION
TARGET RANGE
Annual General Meeting – CEO Update | November 2023 | ASX:AGE
Q2
Q2 2024
COMMENCE
FEASIBILITY STUDY
Q3
Q4
Q1
Q1 2025
TARGET
COMPLETION
FEASIBILITY STUDY
Q2
Samphire Uranium Project – Field Recovery Trial (FRT)
Field Recovery Trial for 1H of 2024* to confirm parameters to be used in a full feasibility study during 2024.
* On receipt of all regulatory approvals
•
FRT will finalise in-situ chemistry, hydrogeology, uranium recovery, environmental and
economic factors for Feasibility Study.
•
Approval for Retention Lease for FRT in progress – post public consultation now in final stage.
•
Will consist of three producing wells and a containerised pilot plant (on for 3-4 months)
•
Confirms data and information needed for Mining Lease approvals from State and Federal
Governments.
•
After planned and any future testing, well infrastructure and containerised pilot process plant
removed, and area rehabilitated – pilot plant available for future satellite field testing.
Ion Exchange Module
Pilot plant layout
14 Annual General Meeting – CEO Update | November 2023 |
Wellhouse (Pipe room) Module
ASX:AGE
Alligator Energy –
Other
Projects
Corporate
15
Alligator Rivers Uranium Province, NT
•
•
100% owned project in Australia’s premier high-grade uranium province.
Province is host to existing high-grade deposits including Jabiluka (358Mlb
@ 5,300ppm U3O8).
•
Multiple uranium targets in well-defined regional uranium bearing zone
including the Caramal Resource 6.5 Mlbs U3O8 @3,100ppm.
•
Extensive Nabarlek North exploration program underway – adjacent to U40
Prospect*.
Status of 2023 Work Program at Nabarlek North:
•
Integration of airborne gravity, other geophysics, geology, geochemistry and
drilling - collected in 2022
•
Recently completed an extensive geochemical sampling program with
RC, RAB, aircore and auger – assay results awaited
•
Completed induced polarisation (IP) survey over broad areas seeking to
identify alteration zones.
•
Data interpretation from recently completed work about to commence
with objective of moving to more-focussed targeting in 2024.
•
Commence evaluation of the potential for strategic energy minerals.
* Includes 6.3m at 7.23% U3O8 and 8.3m @ 2.12% Cu (Uranium Equities Ltd now DevEx Resources Ltd release – 4 October 2017).
16 Annual General Meeting – CEO Update | November 2023 |
ASX:AGE
Big Lake Uranium Project, SA
•
Overlies Cooper Basin in NW SA – unexplored for uranium
despite geological analogies to existing world-class ISR fields in
hydrocarbon basins in Kazakhstan, Wyoming and Texas.
•
Several potential uranium sources including; weathering / leaching
of underlying ‘hot’ granite suite or distal migration of uranium
bearing fluids toward basin depo-centres.
•
EM results and analysis of publicly available 2D seismic data
indicate potential presence of paleochannel systems.
Status of 2023 Work Program:
•
Interpretation of seismic and other datasets completed, continuing
work towards a full 3D basin model.
•
Selection of ~20 stratigraphic drill sites to test stratigraphy,
paleochannel model and qualities of U-trap rocks – testing to
commence H1 2024.
•
Exploration access agreement in place with the Traditional
Owners. Clearances for proposed 2024 drilling completed.
•
Evaluation of potential across holding to host battery metals such
as Li in condensates.
17 Annual General Meeting – CEO Update | November 2023 |
ASX:AGE
Piedmont Ni Co Project Overview, Northern Italy
• Nickel exploration with notable Cobalt, Copper, PGE, Gold credits.
• Significant metal grades from surface rock sampling: 0.19 to 2.48%
Ni, up to 0.19% Co and 0.07 to 6.38% Cu*.
• Multiple Ni showings comparable to world class deposits.
• Ground EM survey across the Laghetto prospect undertaken in
2022.
• Early exploration drilling permits approved for Alpe Laghetto.
Work underway or completed 2023:
• Additional assay, geology, petrology and petrophysics data
integrated into understanding anomalies identified at Laghetto and
La Balma.
• Continue to evaluate related opportunities, partnerships and
projects in region.
• AGE holds 51% over JV tenements, 100% of other tenements.
* AGE ASX Releases – 26 July and 14 September 2018
18 Annual General Meeting – CEO Update | November 2023 |
ASX:AGE
Project Pipeline
CONCEPTUAL
EARLY-STAGE
GREENFIELD
PROSPECTIVE
GREENFIELD
DEVELOPMENT
POTENTIAL
NABARLEK
NORTH
TIN CAMP
CREEK
SAMPHIRE
U40 Nearology
Caramal Resource
PIEDMONT
BEATRICE
Rediscovered Ni, Co & Cu
province in Northern Italy
Beatrice Prospect
BIG LAKE
Analogous to
Hydro-carbon Basins Kazak & Wyoming
STRATEGIC
MINERALS
on Current Titles plus
opportunities
OTHER URANIUM + ENERGY
MINERAL OPPORTUNITIES
19 Annual General Meeting – CEO Update | November 2023 |
ASX:AGE
M&A TEAM
IN PLACE
Blackbush
18.1 Mlb ISR
Amenable
Resource
Plumbush
Historical Prospect
Exploration target
Alligator Energy –
ESG In
Practice
Corporate
20
ESG in practice: Working with Stakeholders
• We aim to add value in all of our decision-making for
shareholders.
Shareholders
• We wish to provide an engaging, challenging, enjoyable
and respectful workplace for our employees.
Team
Communities
• We respect the rights of landowners and communities
and seek to collaborate for our mutual benefit.
Stakeholder
Perspective
• We respect the cultural heritage and connection to country
of Traditional Owners and wish to create mutually
beneficial opportunities.
Focus on
Environment
Landowners
• We aim for a low impact on the environment, through
innovation, use of latest technology, and responsible land
management techniques.
Traditional
Owners
Our aim is to discover, source and economically extract these needed commodities with an innovative approach,
with either zero or minimal impact, and with positive value and experience for our stakeholders and communities.
21 Annual General Meeting – CEO Update | November 2023 |
ASX:AGE
ESG in Practice
Alligator Rivers
•
Over 40 indigenous employees on drilling and exploration programs over 10 years.
•
On country work and support for indigenous ranger groups – even when not exploring.
•
Nabarlek North agreement – potential for TO groups to become 25% partner.
•
Drilling at Nabarlek North in 2022/23– Indigenous owned and operated drilling company.
•
Exploration rehabilitation after each program.
Samphire Project
•
Completed remaining historical rehabilitation during project acquisition.
•
Ongoing drill hole rehab – targeting lifting of bush density to double the existing.
•
Early and ongoing engagement with pastoralists, Indigenous group, Whyalla community.
•
Working with pastoralists for weed and pest control, and with rangeland improvement
initiatives.
•
Early initiatives for low impact site facilities, sustainable energy opportunity.
Big Lake Uranium
•
Full draft agreement with YYTLOAC indigenous group.
•
Plans for direct indigenous employment from first program in 2024.
Annual General Meeting – CEO Update | November 2023 | ASX:AGE
Samphire Uranium Project: Opportunity for a near carbon-free energy project
Potentially close to carbon free project
• Lower power consumption as ISR method has no rock / material
movement, nor crushing / grinding of rock. Renewable power with
backup adequate?
• Distance to Whyalla may allow all electric vehicles, light trucks, cranes
etc to be used.
• Advances in battery on-highway prime movers may support the level of
logistics and product transport needed.
• This potential opportunity aligns with SA Government Hydrogen Hub for
Whyalla region and extensive potential renewable projects.
• We will be scoping this opportunity in parallel with our economic studies.
23 Annual General Meeting – CEO Update | November 2023 |
ASX:AGE
ASX: AGE
Greg Hall CEO
+61 (0) 7 3839 3904
gh@alligatorenergy.com.au
www.alligatorenergy.com.au
Share your feedback
Discover