Assay Results Confirm Uranium Discovery - Big Lake
Released
Released
Announcement PDF
ASX Announcement
1
23 October 2024
Assay Results from the Big Lake Uranium Project
confirm Significant Uranium Discovery
Alligator Energy Limited ASX: AGE (Alligator or the Company) is pleased to advise that chemical
assay results from its inaugural drilling program at the Big Lake Uranium Project (Big Lake), South
Australia confirm preliminary findings of a significant new uranium discovery1.
Highlights
•
In August 2024, Alligator reported that its inaugural drilling program had intersected
significant thicknesses of anomalous uranium mineralisation within interbedded
palaeochannel sand units of the Namba Formation.
•
The discovery is the first proof of concept that significant uranium is present within the
Lake Eyre basin sediments that lie above the hydrocarbon-rich Cooper Basin and within
potentially In-Situ Recovery (ISR) amenable host and depths.
•
Laboratory chemical assay results validate the in-field XRF measurements for
contained uranium. These include:
o
AC24-021
20m @ 110 ppm U from 106 m
o
AC24-022
35 m @ 117 ppm U from 93 m
o
AC24-023
5 m @ 47 ppm U from 104 m
o
AC24-025
10 m @ 138 ppm U from 108 m
•
An improved result was noted in drillhole AC24-022 where in-field XRF detected 5m @
130ppm U whereas lab assay shows a significant grade thickness of 35m @ 117ppm U.
•
Alligator is currently in the process of finalising approvals for follow-up drilling in the
area for Q1 2025, following a Native Title site heritage clearance scheduled for Q4 2024.
Additional drill lines are also planned to test other locations for fertile stratigraphy and
interpretated paleochannels.
Alligator’s CEO Greg Hall stated: “The assay results validate our initial findings of the uranium
discovery at our Big Lake Project and indeed, reflect some improvement on what we had observed
in the field. The consistency and thicknesses of the intersections highlight the significant potential
for the Project from what was an inaugural drilling program in a frontier and untested portion of the
Lake Eyre/Cooper Basin system, northern South Australia.
ASX release 13 August 2024 – Significant New Uranium Discovery at Big Lake Uranium Project, SA
https://wcsecure.weblink.com.au/pdf/AGE/02838091.pdf
1
1
Having confirmed results, we are eager to move forward with the next drilling round scheduled for
early next year. Planning for the drill campaigns is always done in consultation with the Traditional
Owners, pastoralists and other stakeholders in the region, who have greatly assisted with our
exploration endeavours to date.
ASX: AGE
ASX: AGE
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | +61 (0) 7 3839 3904
info@alligatorenergy.com.au | www.alligatorenergy.com.au | Page 2 of 17
As documented in our ASX Release 13 August 20241 Alligator’s inaugural drill program within its
100% owned Big Lake Uranium Project (EL6367) reported evidence of oxidised and reduced sands
in holes drilled at “Site 10” (Figure 1) which is synonymous with roll-front uranium mineralising
systems. This discovery is the first proof of concept that significant uranium is present within the
shallow basin sediments that lie above the hydrocarbon-rich Cooper Basin and are within In-Situ
Recovery (ISR) amenable host environment.
Figure 1: Alligator’s significant tenement holding over the southern Cooper Basin which comprise the Big Lake Project.
Area of current AGE drilling activities and location Site 10 denoted.
The objective of the inaugural program was to investigate the region’s stratigraphy and the potential
for uranium mineralisation in the shallow basin sediments that lie above the hydrocarbon-rich Cooper
Basin; this setting having many attributes seen in other global hydrocarbon-related ISR uranium
fields around the world (refer Figure 2). A historical drilling program in the region by a previous
company (TC Developments) ~15 years ago indicated traces of uranium in thin clay bands in and
around existing oil and gas wells. None of these holes were drilled in palaeochannel features within
the upper (<300m) sedimentary sequence of the Basin.
ASX: AGE
ASX: AGE
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | +61 (0) 7 3839 3904
info@alligatorenergy.com.au | www.alligatorenergy.com.au | Page 3 of 17
Figure 2: Basic conceptual model for the Big Lake Project.
AGE’s strategy is to specifically target the northern extensions of the same Tertiary Namba and Eyre
sedimentary formations which host the Beverley, Four Mile and Honeymoon In-Situ Recovery (ISR)
uranium mining operations in South Australia, south of the Big Lake project. Site 10 was specifically
targeted to confirm the presence of interpreted palaeochannel sands and assess if this area showed
evidence of the key ingredients of the mineralisation model shown below.
Drilling at Site 10 was completed in August 2024 (refer ASX release 13 August 20241). Holes AC24021 to 023 and hole 025 encountered significant thicknesses of correlatable interbedded oxidised
and reduced sand units within the Namba Formation between 90 m to 130 m depth (Figure 3 and
4). In-field measurements with a calibrated2 portable X-ray fluorescence analyser (XRF) also
detected anomalous uranium grades within the Namba sands. Commercial laboratory4 assay results
2
The Olympus DP- 4050 (S/N 550191) pXRF was calibrated on 7 February 2024 by Evident Australia using Alloy Certified Reference
Material produced by Analytical Reference Material International (ARMI).
4
Bureau Veritas Australia employed standard Induced Coupling Plasma spectrometry on acid digested samples, following ISO 9001
Quality Management. Further details provided in Appendix I under Assay Quality.
ASX: AGE
ASX: AGE
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | +61 (0) 7 3839 3904
info@alligatorenergy.com.au | www.alligatorenergy.com.au | Page 4 of 17
validate the in-field results confirming this is the first time thicknesses of this size and grade have
been reported from this region. Of note is drillhole AC24-022 where in-field XRF detected 5m @
130ppm U whereas laboratory assay shows a significant grade thickness of 35m @ 117ppm U.
Alligator is currently planning follow-up drilling in this area. The comparison from in-field XRF to
laboratory assay results for the uranium intersections is shown in the table below.
Hole ID
From (m)
To (m)
Thickness (m)
In-Field XRF Assay (U
ppm)
Laboratory Assay
(U ppm)
AC24-021
106
126
20
110
100
AC24-021
129
130
1
185
129
AC24-022
93
128
35
130
117
(previously stated as
a 5m intercept, AGE
ASX Release 13
August 2024)
AC24-023
104
109
5
45
47
AC24-025
108
118
10 m
120
138
Figure 3: Drillhole location map (Site 10) showing uranium grades (ppm) and thicknesses from laboratory assay results.
ASX: AGE
ASX: AGE
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | +61 (0) 7 3839 3904
info@alligatorenergy.com.au | www.alligatorenergy.com.au | Page 5 of 17
Figure 4: North-South orientated geological cross-section showing uranium grades (ppm) and thicknesses at depth. Note
Hole 018 mineralisation was present but below significant levels (shown here to demonstrate continuity). Hole 023 not
shown as is off section.
Next Steps
Based on the highly encouraging results from the inaugural drill program, a combined mud-rotary
and aircore drilling program is being planned for the first quarter 2025. Key components include:
-
Traditional Owner heritage site clearances to be undertaken in late 2024 to allow for the twinning
of air core holes using a rotary mud drill rig and step-out drilling.
-
Deployment of rotary-mud drilling to allow for acquisition of downhole geophysics and to test the
Eyre Formation that underlies the Namba Formation up to 400 m below surface. These largely
uncemented and semi-consolidated sediments of the Eyre Formation are a principal host for
uranium mineralisation in the nearby Frome Embayment district.
-
Additional stratigraphic drill-fences to continue regional mineralisation model-testing across the
central tenure of EL 6367.
This released was authorised by Greg Hall, CEO and Managing Director.
ASX: AGE
ASX: AGE
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | +61 (0) 7 3839 3904
info@alligatorenergy.com.au | www.alligatorenergy.com.au | Page 6 of 17
Contacts
For more information, please contact:
Mr Greg Hall
Mr Mike Meintjes
CEO & Director
CFO & Company Secretary
gh@alligatorenergy.com.au
mm@alligatorenergy.com.au
For media enquiries, please contact:
Alex Cowie
Media & Investor Relations
alexc@nwrcommunications.com.au
ASX: AGE
ASX: AGE
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | +61 (0) 7 3839 3904
info@alligatorenergy.com.au | www.alligatorenergy.com.au | Page 7 of 17
Forward Looking Statement
This announcement contains projections and forward-looking information that involve various risks and
uncertainties regarding future events. Such forward-looking information can include without limitation
statements based on current expectations involving a number of risks and uncertainties and are not guarantees
of future performance of the Company. These risks and uncertainties could cause actual results and the
Company’s plans and objectives to differ materially from those expressed in the forward-looking information.
Actual results and future events could differ materially from anticipated in such information. These and all
subsequent written and oral forward-looking information are based on estimates and opinions of management
on the dates they are made and expressly qualified in their entirety by this notice. The Company assumes no
obligation to update forward-looking information should circumstances or management’s estimates or opinions
change.
Competent Person’s Statement
Information in this report is based exploration drilling results compiled by Dr Andrea Marsland-Smith who is a
Member of the AusIMM. Dr Marsland-Smith is employed on a full-time basis with Alligator Energy as Chief
Operating Officer, and has sufficient experience which is relevant to the style of mineralisation and type of
deposit under consideration (including 21 years in ISR uranium mining operations and technical work) and to
the activity she is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr MarslandSmith consents to the inclusion in this release of the matters based on her information in the form and context
in which it appears.
About Alligator Energy
Alligator Energy Ltd is an Australian, ASX-listed, exploration company focused on uranium and energy related
minerals, principally cobalt-nickel. Alligator’s Directors have significant experience in the exploration,
development and operations of both uranium and nickel projects (both laterites and sulphides).
Projects
ASX: AGE
ASX: AGE
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | +61 (0) 7 3839 3904
info@alligatorenergy.com.au | www.alligatorenergy.com.au | Page 8 of 17
APPENDIX 1
JORC Code, 2012 Edition – Table 1 (Sections 1 & 2)
Section 1 – Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
•
Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of
sampling.
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that are Material to
the Public Report.
In cases where ‘industry standard’ work has been done this would
be relatively simple (e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to produce a 30
g charge for fire assay’). In other cases more explanation may be
required, such as where there is coarse gold that has inherent
sampling problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of detailed
information.
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic, etc) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by what method, etc).
•
Method of recording and assessing core and chip sample recoveries
and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
•
•
•
•
Drilling techniques
Drill sample
recovery
•
•
•
•
Logging
•
•
•
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
•
•
•
•
•
•
•
•
•
•
Results reported in this announcement relate to aircore (AC) drilling during the 2024 exploration program
on EL6367 at the Big Lake Uranium Project in the Lake Eyre/Cooper Basin region, South Australia.
Sampling of the aircore drilling program involved the following components:
o
Drilling sample returns are taken off the rig at 1 m intervals without any splitting. They are laid out
in numerically ordered labelled bags to avoid any confusion over intervals.
o
Following geological inspection, representative and non-composited 0.5-1 kg portions are taken
from the1 m samples (above) where there is: a change in geological horizon, mineralisation,
alteration assemblages or any other zone of interest.
o
Sampling is done over potential host sequences, with focus on the Namba Formation.
o
All samples are geologically logged and natural gamma radioactivity level is measured with a RS230 BGO Super SPEC Gamma-Ray Spectrometer (May 2023).
Samples for assaying across the entire AC drilling program were shipped to the same laboratory under
one batch. Laboratory sample preparation is described in the ‘quality of assay data’ section.
Drilling was contracted to Wallis Drilling of Western Australia. Using a Mantis 200 Automated Aircore
(AC), 27 holes were drilled across 5 sites (cross-sectional lines of drillholes placed 50 – 200 m apart),
with an average depth of 150 m.
Drill hole collar locations were positioned using a Garmin GPS with an approximate X-Y tolerance of 3 to
5 m.
Sample recovery from the AC drilling is monitored during drilling with an assessment made on the
volume and weight of material recovered relative to the drill interval. If AC sample recovery is poor, it is
logged as such. This is systematically recorded in the logging database.
Cross-interval contamination is assessed regularly but it is not possible to eliminate from the AC drilling
process. However, no significant contamination issues have been encountered in this program.
For this program no apparent relationship was observed between sample recovery and grade. No sample
bias is expected.
Standard sample logging procedures are utilised, including logging codes for lithology, minerals, colour,
weathering etc.
A chip tray sample is taken for all 1 m intervals.
All chip trays are photographed for digital archiving.
Average natural gamma ray activity is measured for each sample. The instrument was purchased in
2023, pre-calibrated from counts to instrument-independent decay rate (µSv/hr). The conversion
accounts for specific instrument crystal volume, sensitivity, and dead-time.
Criteria
JORC Code explanation
Commentary
Sub-sampling
techniques and
sample
preparation
•
•
•
•
•
•
•
•
•
Quality of assay
data and
laboratory tests
•
•
•
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature, quality, and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the
in-situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
For geophysical tools, spectrometers, handheld XRF instruments,
etc, the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and precision have been
established.
•
•
•
•
•
•
The AC drilling process does not generate core but sediment chips as returns.
The chips are recovered at one-meter intervals via the cyclone – wet or dry.
~ 0.5-1 kg samples for laboratory analysis are extracted from the one-meter interval bulk return by
random scoops.
To ensure laboratory reliability, duplicates are taken at a minimum of every 25 samples.
Concentrations of uranium presented in this update are based upon samples sent under a single batch
for complete geochemical and elemental analyses by Bureau Veritas (BV), South Australia in September
2024. Assaying followed the standard processing sequence:
o
Samples are pulverized to a maximum 3 mm grain size and then split to obtain separate aliquots.
o
One aliquot with a minimum of 0.2 g for mixed acid digest with a mixture of nitric, perchloric and
hydrofluoric acids. Induction Coupled Plasma Mass Spectrometry (ICP- MS) is then employed to
detect concentrations of 42 elements (detection limits vary depending on the element).
o
Another aliquot is prepared and fused with lithium metaborate at high temperature. ICP – MS is
then employed to detect another ~ 30 elements, including rare earths (detection limits vary
depending on the element).
Bureau Veritas employs procedures in accordance with ISO 9001 Quality Management, including one in
twenty samples analysed in duplicate.
Of 174 samples assayed, 9 represented blind duplicates. Duplicates are within 20% of each other for
75% of the time.
Intervals of interest (sands within the Namba Formation) sampled at 1 m intervals.
Coefficient of determination for thickest intercepts Niton XRF uranium concentrations versus assay
results are > 0.5 (shown here for AC24-021):
Criteria
JORC Code explanation
Commentary
Verification of
sampling and
assaying
•
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
•
•
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish
the degree of geological and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been applied.
•
All coordinate information was collected using handheld GPS utilizing GDA 1994, Zone 54. While the
spatial location is expected to be within 3 – 5 m, it is possible that the elevation can be as much as 10 m
out with respect to the currently established geoid.
•
The AC drill lines (or fences) of three to ten drillholes were strategically placed within the Big Lake Project
to:
o
Corroborate seismic/airborne electromagnetic (AEM) interpretations of potential mineralisation.
bearing channels and host sequences (in this case, primarily the Namba Formation)
o
Test the quality and variability of potential host formation.
o
Potentially make intercepts into host formations with indicators of uranium, uranium transport or
uranium deposition.
•
•
•
Location of data
points
Data spacing and
distribution
•
•
•
•
•
•
•
•
Alligator’s field geologists are supervised by the Project Lead/Senior Geologist.
All field data is entered into excel spreadsheets (supported by look-up tables) at site and subsequently
validated on import into the centralized Access database.
Hard copies of logging and sampling data are stored in the local office and electronic data is stored on
the company server.
As an early exploration/part stratigraphic drilling program, twinning of results is not required. However, all
new data will be compared against legacy drill datasets, Alligator’s previous aircore drill data, geophysical
coverage etc, to check for a consistent picture, possible discrepancies in new and old data and
anomalies – leading to an enhanced picture of local prospectivity.
Criteria
JORC Code explanation
Commentary
Orientation of data
in relation to
geological
structure
•
•
•
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known,
considering the deposit type.
If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
Drill traverses were generally designed to be orthogonal to the predicted course of interpreted
palaeochannels. However, this was impractical in many cases owing to:
o
Access restrictions due to oil and gas infrastructure or to minimise environmental disturbance.
o
Uncertainty of palaeochannel geometry at this early stage of exploration.
o
Inherent ambiguity of datasets due to spatial resolution or penetration limitations (particularly for
AEM data in conductive cover terrain).
Sample security
•
The measures taken to ensure sample security.
•
Company geologists supervise all sampling and subsequent storage in field and transport to point of
dispatch to the assay laboratory.
Audits or reviews
•
The results of any audits or reviews of sampling techniques and
• As an inaugural drilling program audits or reviews of the sampling techniques were not undertaken.
data.
Section 2 Reporting of Exploration Results
Section 2 – Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
•
•
The Big Lake Project (Tenement Holder - Big Lake Uranium Pty Ltd, project operated by Alligator Energy
Ltd) is comprised of 7 exploration licences (EL 6367, EL 6847, EL 6848, EL 6849, EL 6902, EL 6903 and
EL 6904) covering 6,422km2. The initial licence - EL 6367 was granted on 22nd July 2019 for a two-year
period and covers an area of 818 km2. This licence was renewed for an additional three-years, expiring
July 2024. A further 6 licences were added to the project in 2022 and 2023. EL6367 covers part of the
Strzelecki regional reserve on its western side and parts of the Cooper Creek flood plain. The licence
also covered parts of 6 historical exploration leases, ELs 4068, 4069, 4071, 4072, 4073 and 4076
previously held by TC Development Corporation Pty Ltd between 2008 and 2013.
•
A Native Title Agreement for Mineral Exploration (NTMA) for Exploration between Big Lake Uranium Pty
Ltd and Yandruwandha Yawarrawarrka Traditional Landowners (Aboriginal Corporation) RNTBC (INC
3840) has been instrumented and endorsed (RI 53024) on 2 August 2023.The agreement covers EL
6367, EL 6847, EL 6849, EL 6902, EL 6903 and EL 6904.Hertitage sites in the area take the form of
registered sites, which the company has full understanding of the location, and are excluded from
exploration. Like any other jurisdiction, Alligator is required to protect heritage and archaeological sites
via work area clearances on an as-needs basis.
•
Alligator operates under an approved authorisation (Exploration Program for Environmental Protection
and Rehabilitation) with the SA Government.
•
Historic work across the tenement area (EL 6367) has predominantly focused on petroleum exploration
which actively commenced on-ground exploration in the mid-1960s. To date 424 petroleum wells have
been recorded within the licence boundary and active production is ongoing with processing taking place
at SANTOS’ nearby Moomba facility. Petroleum drilling across the tenement has provided valuable
uranium exploration data through gamma logs which are valuable for the construction of simplified
stratigraphic logging, however the primary focus of these holes lies much deeper than economic
uranium exploration targets. Petroleum drilling in the district typically targets stratigraphic horizons of the
Eromanga Basin approximately 1300m deep and Cooper Basin approximately 3000m deep.
•
Exploration done
by other parties
•
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
Acknowledgment and appraisal of exploration by other parties.
Criteria
JORC Code explanation
Commentary
•
Four 3D seismic surveys overlap parts of the licence giving almost total coverage.
Seismic Survey (Year conducted)
Moomba Big Lake 3D
(1997
Barina-Farina 3D
(1998)
Caladan-Daralingie 3D
(2001)
Greater Strzelecki 3D
(2001)
Over 1000 2D seismic profiles have been conducted across the exploration licence over the past 50
years. Quality of the 2D data varies with vintage, with those being shot from the mid 90’s onwards
generally the best datasets for geological interpretation. In 2019 the SA government began reprocessing
open file 2D seismic to generate pre-stack time and depth migrated datasets for the Cooper Basin 2D
cubed programme. 3855 lines have currently been reprocessed, 205 of which are located within the Big
Lake Project. This reprocessed data provides a filtered full-offset final migration that enhances the data
lower in the seismic profile, providing insights to possible fluid migration paths beneath, and into, the
stratigraphy targeted by AGE.
•
Aside from Petroleum exploration only modest mineral exploration has been conducted within the
licence. Uranium exploration was conducted by TC Development Corporation Pty Ltd who held 6
licences (EL4068, EL4069, EL4071, EL4072, EL4073 & EL4076) overlapping EL6367 amongst others in
the region. TC Development Corporation Pty Ltd held the licences between 2008 and 2013, with active
on-ground exploration conducted during 2008 and 2009.
•
On-ground exploration by TC Development consisted primarily of rotary mud drilling of 148 holes
totalling 20,584 m. These holes concentrated around historic gamma anomalies identified in petroleum
well logs. Hole depths range from 60 to 290 m depth and average 140 m targeting the Eyre Formation
proximal to hydrocarbon domes. Gamma logs and lithology was recorded for all holes with 3687 interval
samples analysed for geochemistry through XRF by Genalysis Labs WA.
Criteria
JORC Code explanation
Geology
•
Deposit type, geological setting and style of mineralisation.
Commentary
•
The Big Lake exploration project lies on the eastern edge of the Cooper – Eromanga basins between
the Patchawarra and Tenappera Troughs. The basins have a long history of oil and gas extraction
and the uranium occurrence model follows analogues of occurrences above hydrocarbon fields in
New Mexico and Texas in the United States of America and those of Kazakhstan.
•
REDOX-controlled ‘roll front’ uranium mineralisation is being targeted by Alligator within the
sedimentary Tertiary Namba and Eyre Formations and Cretaceous Winton Formation. The potential
uranium source for the BLU Project is interpreted to be from weathering/leaching of the underlying
uranium enriched Big Lake Granite Suite. The suite was recognised initially from regional heat flow
maps of Australia and elevated geothermal gradients in the Cooper Basin petroleum wells. They
were subsequently recognised in seismic data and later intersected in petroleum wells.
•
Uranium from this potential source is interpreted to migrate via oxidised groundwater into permeable
units and paleochannels within the basin. Hydrocarbons generated in the lower part of the basin are
known to have transgressed stratigraphy and leaked into the upper parts providing the reductant for
uranium to precipitate from the groundwater (see Figure below). Numerous regional petroleum
wells show traces of uranium throughout the sedimentary sequences of the basin, confirming the
potential for the mineralisation model described above, with recently acquired airborne
electromagnetics and reprocessed seismic data demonstrating continuity and volume potential.
Drill hole
Information
•
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above
Share your feedback
Discover