Quarterly Activities Report and 5B Cashflow - March 2025
Released
Released
Announcement PDF
QUARTERLY REPORT
FOR THE PERIOD ENDING
31 March 2025
31 December
2021
ASX: AGE
2
Quarter Highlights
Alligator Energy Limited (“Alligator”, “AGE” or the “Company”) is pleased to release the 31 March 2025
Quarterly Activities Report.
Significant Highlights for the Quarter include:
Samphire Project
•
•
•
•
•
•
The Company received the Retention Lease (RL) from the SA Department for Energy and Mining
(DEM) on 13 January 2025 for the conduct of its in-situ recovery Field Recovery Trial (FRT) at
Samphire.
The Program for Environment Protection and Rehabilitation (PEPR) addressing conditions of the RL
and operation of the FRT was submitted and is now in the assessment phase by DEM, the EPA, and
the Department of Environment and Water (DEW).
Approval of the PEPR and EPA construction and operating permits represent the final steps in the
regulatory process.
A preferred Whyalla based contractor, Ahrens Group Pty Ltd, was selected for the on-site construction
of the pilot plant and associated civils, along with the pipe works and pumps to connect with the three
FRT production well patterns.
An update of the Blackbush JORC Mineral Resource Estimate incorporating AGE’s 2024 drilling
results is in final stages.
Post quarter end, drilling of observation wells required for the FRT commenced on site.
Big Lake Project
•
•
Alligator received its exploration PEPR approval for follow-up drilling1 aimed at expanding the
discovery area around Site 102 along with investigation of other uranium targets.
A rotary mud drill crew mobilised late February, with two drill holes being completed. Flood waters
from the significant rain event in Western Queensland impacted AGE’s drilling areas resulting in the
suspension of drilling until floodwaters recede.
Alligator Rivers Projects
•
•
•
•
•
•
Assays from the 2024 drilling program received with new mineralisation occurrence identified at Bully
(~4 kms east of U40) with 1m @ 108ppm U3O8 in NNRC24-019 from 83m.3
U40 extension follow-up drilling has identified further mineralisation extending into the Company’s
tenure with 5 of 7 holes returning anomalous U3O8, with peak results of:
o 3m @ 260ppm U3O8 in NNRC24-031 from 45m (including 1m @ 570ppm)
Surface sampling has identified multiple U anomalies across both the Nabarlek North and Tin Camp
Creek (TCC) Projects including 4,120ppm U3O8 at the historic Gorrunghar Prospect.
Structural and geological interpretation of 2024 airborne Magnetic and Radiometric survey ongoing.
Notable surface sampling results in other commodities including critical minerals, with up to 3.16%
Total Rare Earth Elements (TREO) in hand samples.
Receipt of third co-funding allocation under previously approved grants from the NT’s ‘Resourcing the
Territory’, Geophysics and Drilling Collaborations program with AGE receiving almost $180k towards
exploration expenditures.
1 AGE ASX Release 27 February 2025 (https://wcsecure.weblink.com.au/pdf/AGE/02918313.pdf)
2 AGE ASX Release – 13 August 2024 (https://wcsecure.weblink.com.au/pdf/AGE/02838091.pdf) and 23 October 2024
(https://wcsecure.weblink.com.au/pdf/AGE/02870056.pdf)
3 AGE ASX Announcement 1 April 2025. (https://wcsecure.weblink.com.au/pdf/AGE/02930892.pdf)
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 2 of 23
3
Corporate and Uranium Market
•
Cash balance at quarter end of $16.8 M, inclusive of a one-off payment to EnviroCopper Limited (ECL)
for an increased equity investment (see further detail below).
The spot U3O8 price ended the quarter at US$64.23/lb (Dec 2024: $72/lb) but has since firmed above
US$67.
The long-term end-of-month U3O8 price was maintained at US$80/lb U3O8 (Dec 2024: US$80.50lb)
Completion of the further subscription for fully paid ordinary shares in ECL for $871k was completed
with AGE now holding a 15.61% interest in ECL. Greg Hall has been appointed to the board of ECL.
Key market developments included:
•
•
•
•
➢
➢
➢
The US Department of Energy (DOE) issued a report at the start of the quarter showing that US
data centre energy use has tripled over the past decade and is projected to double or triple again
by 2028, driven by increased adoption of AI technologies, domestic manufacturing growth, and
industrial electrification.
A coalition of 11 pro-nuclear European governments is urging the EU to include nuclear energy
in its Affordable Energy Action Plan for cost-effective and secure energy.
India’s Jindal Nuclear announced plans to develop 18 GWe by 2046 as part of the country’s goal
of reaching 100 GWe.
Plans for the forthcoming quarter:
•
Samphire
- Continued engagement with DEM, EPA and DEW regarding assessment of the PEPR and final
approval, with construction start timing dependent on this notification.
- Receipt of EPA and SafeworkSA licenses to commence FRT operations.
- Procurement of last remaining items for the FRT (ablution and office blocks, laboratory items, tanks
and wellfield polypipe etc).
- Preparation of scope documents ahead of commencing a tender process to select definitive
feasibility study consultants.
- Finalisation of the JORC Mineral Resource Estimate for the Blackbush deposit.
•
Big Lake
-
•
Alligator Rivers
-
•
Watching brief regarding flood levels and duration, and any potential timing for possible return to
continue drilling.
Continuation of data analysis from historical petroleum wells and seismic data within the wider
project area (outside of EL6367) to define additional areas for exploratory drilling.
Continued review and technical interpretation of 2024 geochemistry and geophysics in conjunction
with all Alligator River project data.
Target development and work program generation.
Mine Management Plan approvals for future work at the Tin Camp Creek Project.
Work program meeting and presentation with Traditional Owners for further proposed work at
Nabarlek North.
Piedmont
-
Renewed marketing effort for the sale of the Piedmont Project including setting out details of the
historic gold mining activities on the licences and in the broader district.
-
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 3 of 23
4
Samphire Uranium Project Development
•
The Company received formal advice from the DEM on 13 January 2025 of the grant of a RL
for the purposes of conducting a field recovery trial at the Samphire Project. The RL has
several conditions (environmental outcomes) covering a range of important areas, including,
stakeholder engagement processes; groundwater management; soil, vegetation and fauna
strategies; air quality; radiation management; traffic, noise and public safety. These
conditions, after further consultation with the DEM, EPA and DEW were incorporated into the
PEPR submitted on 7 March 2025. This document, once approved, governs how the trial will
be conducted.
•
Approval of the PEPR is the final step in the DEM regulatory process to commence on-site
construction of the FRT infrastructure, with EPA and SafeworkSA licensing also underway.
•
Fabrication of the containerised FRT plant by Adelaide Control Engineering was completed in
July 2024 along with acceptance testing of the ion exchange and wellhouse modules. The
pilot plant and associated equipment is currently in Alligator’s Whyalla yard.
•
Whyalla based contractor, Ahrens Group Pty Ltd, has been selected for the on-site
construction of the pilot plant and associated civils, along with the pipe works and pumps to
connect with the three trial-production well patterns. The construction contract will be ready
for signing once the PEPR and EPA permits are approved. Ahrens is ready to mobilise their
team and subcontractors in the Whyalla region (estimated at up to 25 skilled construction and
trades people) for the 2 to 3 months construction and commissioning phase.
•
The objectives of the FRT are to confirm key parameters of a future production operation and
marks an important step toward development. Parameters to be assessed include in-situ
chemistry, hydrogeology, uranium recovery, reagent usage, and other environmental and
economic factors. Data and learnings further de-risk the Project and provide the necessary
inputs to a definitive feasibility study and Mining Lease Application to be commenced during
2H 2025.
•
The FRT operations will be conducted over a period of three to four months after construction
and commissioning is completed (targeted during Q3 2025 (refer Fig 2 – Indicative Samphire
FRT Schedule) and will involve establishing three well-field patterns (refer Figure 1) and
placement and construction of a pilot processing plant (already fabricated). Post completion
of the FRT operations, and any additional test work identified in the short-term, the pilot plant
and wellfields will be removed, and the area rehabilitated.
•
An update of the JORC Mineral Resource Estimate for the Blackbush deposit is underway
targeting completion early Q3.
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 4 of 23
5
Figure 1 – Layout of the FRT production wellfields and pilot plant site.
Figure 2 – Indicative Schedule for Samphire Field Recovery Trial - PEPR approval, construction and operations. Subject
to DEM (and Co-Regulators) approval of the PEPR
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 5 of 23
6
Big Lake Uranium (BLU) Project
•
As per ASX release 23 October 20244, drilling at Site 10 on EL6367 (Figure 3) returned significant
thicknesses of unconsolidated sands and elevated uranium values which were confirmed by assay
(Figure 4). Four holes recorded uranium values at over 100 ppm, including two intersections within
porous sands of greater than 20 m thickness.
Figure 3: Alligator’s significant tenement holding, southern Cooper Basin (Big Lake Project) - location of Site 10 denoted.
Figure 4: Drillhole location map (Site 10) showing uranium grades (ppm) encountered in AGE’s 2024 drilling program.
Rotary Mud drilling in this area will be targeted to both expand the mineralisation footprint and look for deeper sand units.
4 AGE ASX Release 23 October 2024 (https://wcsecure.weblink.com.au/pdf/AGE/02870056.pdf)
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 6 of 23
7
•
Approval of the exploration PEPR was received early Q1 for a program comprising up to 30 aircore
holes to test targets identified in the Namba Formation and up to 20 rotary-mud holes to test targets
identified in the Eyre Formation to approximately 250m depth.
•
The rotary mud drill crew mobilised late February. After some equipment commissioning issues, two
drill holes were completed in the first 2-weeks of the program. These initial holes encountered similar
oxidised sands observed in last year’s drilling. Subsequently, flood waters from the significant rain
event in Western Queensland impacted AGE’s drilling areas such that drilling had to be suspended
until floodwaters recede. It is unknown how long the area may be inaccessible, but flood levels and
duration are anticipated to be similar to other large flood events (e.g. the 1974 flood) and could be
several months before access is possible.
Figure 5: Sites on EL6367 with heritage clearance for 2025 drilling activity. Note Site 10A is the newly heritage surveyed
larger area for 2025 drilling.
Alligator Rivers Uranium Province (ARUP)
Exploration progress for the quarter includes:
•
Drilling results for the 2024 Nabarlek North program received5. Five out of seven holes drilled along
strike of the U40 prospect on AGE’s tenement (U40 extension) intercepted anomalous uranium with
peak results of 3m @ 260ppm U3O8 in NNRC24-031 from 45m (including 1m @ 570ppm U3O8).
Location of drillholes and results are summarised Figure 6.
5 AGE ASX Announcement 1 April 2025. (https://wcsecure.weblink.com.au/pdf/AGE/02930892.pdf)
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 7 of 23
8
Figure 6. Plan view of AGE’s 2024 RC drilling and surface programs and results at the Nabarlek North Project.
•
In addition to the results at U40 extension, a new mineral occurrence (Bully Prospect) was identified
along an interpreted structure approximately 4km to the northeast. Here, 1m @ 108ppm U3O8 in
NNRC24-019 from 83m was intersected with additional low-grade anomalism at other intervals and in
a neighbouring hole associated with vector chlorite/sericite alteration in the target Cahill Formation.
•
Surface sampling results received during the quarter highlighted low level anomalies at the Nabarlek
North project and notable uranium results from mapping and structural investigation of historic
prospects within the Tin Camp Creek licences with a peak result of 4210ppm U3O8 (Table1, Figure 7).
Table 1: Key U assay results from 2024 surface sampling, assay reported >15ppm U3O8.
Project
Prospect
Samp ID
Type
U3O8_ppm
Comments
TCC
Gorr
TC24-005
SOIL
4209.89
Gorrunghar surface sample from costeen, known U occurrence
TCC
Area 84
TC24-086
ROCK
405.66
Mordijimuk - historic known U occurrence
TCC
Gurrigarri
TC24-088
ROCK
267.69
GurriGarri known U occurrence
TCC
Area 84
TC24-085
ROCK
179.24
Mordijimuk - historic known U occurrence
TCC
Kukalak
TC24-036
ROCK
175.71
Sample on Caramal road. Western edge of Caramal
TCC
Area 84
TC24-076
ROCK
103.54
Mordijimuk - historic known U occurrence
TCC
Kukalak
TC24-065
ROCK
95.05
Ancillary U with REEs and Th
TCC
Kukalak
TC24-079
ROCK
84.2
Ancillary U with REEs and Th
TCC
Kukalak
TC24-028
ROCK
67.57
Ancillary U with REEs and Th
TCC
Kukalak
TC24-050
ROCK
62.62
Ancillary U with REEs and Th
TCC
Kukalak
TC24-078
ROCK
62.5
Ancillary U with REEs and Th
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 8 of 23
9
TCC
Kukalak
TC24-061
ROCK
61.79
Ancillary U with REEs and Th
TCC
Kukalak
TC24-069
ROCK
46.93
Ancillary U with REEs and Th
TCC
Kukalak
TC24-058
ROCK
46.11
Ancillary U with REEs and Th
TCC
Kukalak
TC24-080
ROCK
36.67
Ancillary U with REEs and Th
TCC
TC24-038
ROCK
35.14
Ancillary U with REEs and Th
TC24-010
SOIL
35.02
Regional sampling along Caramal fault
TCC
Kukalak
Robbie’s
Rd
Kukalak
TC24-030
ROCK
31.84
Ancillary U with REEs and Th
TCC
Kukalak
TC24-077
ROCK
31.72
Ancillary U with REEs and Th
TCC
Kukalak
TC24-032
ROCK
30.31
Ancillary U with REEs and Th
TCC
•
Rare Earth Elements were also investigated with peak results highlighting 3.16% Total Rare Earth
Oxides (TREO) in grab samples of which 0.68% is comprised of Magnet Rare Earth Element Oxides
(MREO), key results below in Table 2 below and Figure 7.
Table 2. Key surface sampling Rare Earth Element results – 0.2% MREO cutoff
Project
Prospect
Samp ID
Type
TREO_ppm
MREO_ppm
Comments
TCC
Kukalak
TC24-036
ROCK
31551.79
6813.79
REEs adjacent to Caramal = over 3% TREOs
TCC
Kukalak
TC24-065
ROCK
29647
6295.72
REEs adjacent to Caramal
TCC
Kukalak
TC24-079
ROCK
19799.35
4460.37
REEs adjacent to Caramal
TCC
Kukalak
TC24-028
ROCK
17315.15
3838.02
REEs adjacent to Caramal
TCC
Kukalak
TC24-078
ROCK
13366.87
2958.22
REEs adjacent to Caramal
TCC
Kukalak
TC24-058
ROCK
13298.6
2942.68
REEs adjacent to Caramal
TCC
Kukalak
TC24-050
ROCK
11301.93
2509.79
REEs adjacent to Caramal
TCC
Kukalak
TC24-061
ROCK
10312.62
2295.12
REEs adjacent to Caramal
TCC
Kukalak
TC24-069
ROCK
9568.07
2123.64
REEs adjacent to Caramal
•
Opportunistic grab samples during reconnaissance also highlight the potential for high purity silica
(HPS) to occur in the region through massive quartz veining (Table 3, Figure 7). Two samples were
collected over 8km apart in separate vein systems returning up to 97.84% SiO 2 through whole rock
XRF analysis by Bureau Veritas Minerals. HPS has uses in specialist technologies and chips for AI
and solar cells in the renewable sector. While 98% SiO 2 is preferred in industry, improved sampling
procedures and handling could potentially improve results and understanding of the potential.
Table 3. Key HPS assay results from surface sampling
Project
TCC
TCC
Prospect
Robbie’s
road
Random
Samp ID
Type
SiO2_%
Fe_%
Comments
TC24-011
ROCK
97.84
1.74
Spot grab sample en-route to Robbie’s Prospect.
TC24-007
ROCK
97.12
2.06
Random Grab Sample from TCC1 valley scouting NW 24921
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 9 of 23
10
Figure 7. Plan view of AGE’s 2024 surface sampling program and results at the Tin Camp Creek project.
•
Finalisation and receipt of last instalments for Co-Funding grants towards the 2024 exploration
program now received from NT Government. These grants have contributed to the funding of 2024
airborne geophysics and greenfields exploration RC drilling. Combined Co-funding expenditure has
now been received (post quarter end) in full totalling just short of $180k in grants against the 2024
ARUP exploration program.
•
Other works ongoing during the quarter include structural and geological interpretation of 2024
airborne magnetic and radiometric data with key features/areas of interest being identified for
reconnaissance in 2025. These areas will be presented at a NLC facilitated work program meeting
scheduled for May to enable ground works and reconnaissance later in 2025.
Piedmont Nickel Cobalt Project - NW Italy (Ni, Au, Cu, Co – AGE: 51% JV)
•
No results of any significance were returned from assays of 5 stream samples collected spanning
approximately 2km of river system on the Laghetto Licence in the valley below the historic Gula Gold
Mine.
•
Marketing of the Project to interested parties will resume during late April 2025 including outlining the
gold exploration potential of the licences given the historical mine workings in the region (Figure 7).
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 10 of 23
11
Figure 7. Piedmont Project historic regional gold occurrences. Licences marked as application have now been granted.
Investment in EnviroCopper Limited (ECL) – Cu ISR
AGE: 15.61% interest
•
Activity at the Kapunda Project during the quarter covered additional hydrogeological test work prior
to commencing the next round of in-ground testing at the Kapunda copper ISR project.
•
Significant progress has been made in finalising the ePEPR approval so that circulation of lixiviant at
the Kapunda Project can occur. This work is targeted to commence before the end of the coming
quarter to tie in with completion of the BHP research funding.
•
Activity for the Alford West Project included drilling to install a 5-spot bore pattern and 3 monitoring
wells. Samples are currently with Bureau Veritas awaiting assay. Follow up hydrogeological pump
testing will commence in the June quarter to establish hydrogeological parameters and test ISR
amenability.
•
ECL is in ongoing investment discussions with international investors focused on copper ISR for a
significant equity injection which it is targeting to complete in the coming quarter.
Market Update
The spot U3O8 price ended the quarter down at ~US$64.23/lb (December 2024 – US$72/lb) however has
since firmed above US$67/lb. The UxC long term price indicator was maintained at US$80/lb U3O8 for
the month of March 2025.
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 11 of 23
12
Key market drivers by both Governments and big technology companies during the quarter were:
United States
•
The US Department of Energy (DOE) issued a report at the start of the quarter showing that US data
centre energy use has tripled over the past decade and is projected to double or triple again by 2028,
driven by increased adoption of AI technologies, domestic manufacturing growth, and industrial
electrification. The DOE is working with key stakeholders to advance technologies and strategies
including advanced nuclear power. By way of example, it re-issued a $900 MM solicitation to support
the deployment of Generation III+ SAMRs to boost domestic nuclear capacity under the Trump
administration's energy strategy. It also recently released its second loan disbursement to support the
Palisades nuclear plant restart.
•
State level support toward for nuclear continues to grow with notable events in the quarter including:
Colorado Senate approving a bill for nuclear to qualify as “clean energy”; Indiana Senate advancing
bill to accelerate SMR deployment; Texas legislators introduced the Atomic Texas Act to accelerate
nuclear expansion by creating the Texas Advanced Nuclear Energy Authority; and South Carolina
seeking to restart construction of two nuclear reactors at South Carolina’s V.C. Summer Nuclear
Station to meet AI demand
•
U.S.-based SAMR startup Deep Fission partnered with Endeavour Energy to deploy up to 2.0 GWe in
nuclear capacity for powering data centres, with initial reactors expected to start by 2029.
Asia
•
Following an October 2024 referendum supporting large-scale nuclear capacity, positioning
Kazakhstan as a future leader in nuclear energy development, the country announced plans to finalize
the participants for its first commercial nuclear power plant consortium by 2025, involving global
nuclear leaders, with Rosatom and a Chinese company among potential collaborators; later it
confirmed the site for first nuclear power plant.
•
Mongolia reached a preliminary agreement with France’s Orano to develop the Zuuvch Ovoo ISR
uranium project, valued at $1.6 billion, with production expected to begin in 2028.
•
In China, the No.1 Unit of Zhangzhou nuclear power project started commercial operation. Of the 96
reactors built globally since 2007, 51% were in China where construction took 6-years on average (vs
9-years on average globally).
•
India’s Jindal Nuclear announced plans to develop 18 GWe by 2046 as part of the country’s goal of
reaching 100 GWe. Vietnam also approved a nuclear development plan to construct the country’s first
reactor “within the next decade”. Russia and Myanmar sign agreements to construct SMRs.
Europe
•
HANetf and Sprott Asset Management launched the Sprott Physical Uranium ETC (SPUT), Europe’s
first physical uranium ETC, listed in London and set to list on Xetra exchange in Germany.
•
A coalition of 11 pro-nuclear European governments is urging the EU to include nuclear energy in its
Affordable Energy Action Plan for cost-effective and secure energy.
•
Switzerland plans to amend its 2018 ban on new nuclear power plants allowing future new nuclear
plant builds, aiming to secure long-term clean nuclear energy supply as a fallback if renewable energy
goals are unmet. Switzerland’s Axpo Power later signed a uranium supply contract with Kazatomprom.
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 12 of 23
13
•
Poland took another step towards building its first nuclear power plant after the government greenlit
as much as 60.2 billion zloty ($14.7 billion) in funding for the project (which still awaits the European
Union approval to go ahead).
•
The UK government announced plans to expand public AI computing power 20-fold by 2030, with
significant public-private investments, including over $17 billion committed by Vantage Data Centers
and Nscale. It also announced a package of reforms designed to accelerate the expansion of nuclear
power by removing red tape.
•
Germany’s KernD nuclear lobby claims up to six closed nuclear plants could be recommissioned to
cut electricity costs and reduce reliance on imports. Restarting the plants would cost €1-3 billion per
unit, but German utilities oppose the idea, citing decommissioning efforts, staffing, and regulatory
hurdles.
Corporate
•
Cash balance at quarter end of $16.8M, inclusive of a one-off payment to ECL for increased equity
investment.
•
The Company completed a further subscription for fully paid ordinary shares in ECL for $871k and
now holds a 15.61% interest in ECL. Greg Hall has been appointed to the board of ECL.
Capital Structure and Listing Rule 5 disclosures
At 31 March 2025, the Company had the following capital structure and cash balances:
As at 31 March 2025
Cash Balance
A$16.8M
Ordinary Fully Paid Ordinary Shares (AGE)
3,874.2M
Listed Options 7.8c (Exp 28/11/25) (AGEOC)
273.9M
Unlisted Options 8.1c (Exp 01/12/25)
132.0M
Unlisted Employee Incentive Performance Options
41.9M
Director Share Options
14.4M
Expenditure on exploration and evaluation activities during the March 2025 quarter totalled $2,061k (previous
quarter - $2,691k) and related principally to advancing the Samphire Project, commencement of the drilling
program at Big Lake in 1Q 2025 and analysis of the 2024 field program results for the Nabarlek North and Tin
Camp Creek Projects in the Alligator Rivers.
Payments to related parties including non-executive director fees and the salary of the CEO and Managing
Director for the March quarter totalled $129k (previous quarter $123k).
This announcement has been authorised for release by the CEO and Managing Director.
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 13 of 23
14
Contacts:
For more information, please contact:
Mr. Greg Hall
Mr. Mike Meintjes
CEO & Director
CFO & Company Secretary
gh@alligatorenergy.com.au
mm@alligatorenergy.com.au
For media enquiries, please contact:
Alex Cowie
Media & Investor Relations
alexc@nwrcommunications.com.au
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 14 of 23
15
Competent Person’s Statement
Uranium
The information in this announcement that relates current and historical drillhole data, QAQC and geology aspects related
to the Alligator projects is based on and fairly represents information provided by Dr Andrea Marsland-Smith who is a
Member of the AusIMM. Dr Marsland-Smith is employed on a full-time basis with Alligator Energy as Chief Operating
Officer, and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration
(including 21 years in ISR uranium mining operations and technical work) and to the activity she is undertaking to qualify
as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves. Dr Marsland-Smith consents to the inclusion in this release of the matters based
on her information in the form and context in which it appears.
In relation to Exploration results referred to in this Quarterly report, the Company confirms that it is not aware of any new
information or data that materially affects the information included in the original market announcement and that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply
and have not materially changed. In relation to production target referred to in AGE ASX release 14 December 2023 that
is relevant for underpinning the field recovery trial at Samphire, the Company confirms that all material assumptions
underpinning the production target, and the forecast financial information derived from the production target, in the initial
announcement continue to apply and have not materially changed.
Forward Looking Statement
This announcement contains projections and forward-looking information that involve various risks and uncertainties
regarding future events. Such forward-looking information can include without limitation statements based on current
expectations involving a number of risks and uncertainties and are not guarantees of future performance of the Company.
These risks and uncertainties could cause actual results and the Company’s plans and objectives to differ materially from
those expressed in the forward-looking information. Actual results and future events could differ materially from anticipated
in such information. These and all subsequent written and oral forward-looking information are based on estimates and
opinions of management on the dates they are made and expressly qualified in their entirety by this notice. The Company
assumes no obligation to update forward-looking information should circumstances or management’s estimates or opinions
change.
About Alligator Energy
Alligator Energy Ltd is an Australian, ASX-listed, exploration company focused on uranium and energy related minerals,
principally through its equity interest and funding agreement with EnviroCopper Limited. Alligator’s Directors have
significant experience in the exploration, development and operations of both uranium and nickel projects (both laterites
and sulphides).
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 15 of 23