Completion of Pilot Plant Construction
Released
Released
Announcement PDF
ASX Announcement
19 December 2025
Highlights:
• Practical completion achieved for the construction of the pilot plant; completed
safely, on schedule, and under budget
• Control of the site has formally transferred back to Alligator, enabling the
Company to commence the final pre-operation activities
• Field Recovery Trial (FRT) to begin in February 2026, with first results expected
in Q1 CY2026
Alligator Energy Ltd (ASX: AGE, ‘Alligator’ or ‘the Company’) is pleased to announce a
significant milestone in the advancement of its Samphire Uranium Project, with Practical
Completion achieved for the pilot plant. This milestone confirms the successful conclusion
of all construction works and the completion of Stage 1 Commissioning (construction
verification) and Stage 2 Commissioning (energisation).
Construction commenced on 7 October 2025 and has been executed with an excellent
outcome. The pilot plant was completed safely and on schedule, reflecting the strength of
Alligator’s project management, the capability of Ahrens, and a highly disciplined delivery
approach across the full build period. Achieving Practical Completion in line with the original
program is a strong validation of the construction and commissioning plan, particularly given
the logistical and operational complexity of building a new pilot plant.
Cost performance was equally strong, with the construction completed under budget,
demonstrating effective procurement, tight contractor oversight and consistent control of
project scope – a testament to Alligator and Ahrens management of the construction phase.
Safety performance across the construction phase was also exemplary, highlighted by only
one first-aid incident (minor) recorded over the entire program. This result underscores the
high safety standards maintained on site and the shared commitment of both Alligator and
Ahrens to proactive risk management and safe work practices throughout delivery.
With Practical Completion now confirmed, care and control of the site has formally
transferred back to Alligator, enabling the Company to commence the final pre-operation
activities, including Stage 3 dry and Stage 4 wet commissioning commencing early January.
The FRT is designed to demonstrate and validate the in-situ recovery (ISR) operating
performance at Samphire, including confirming operating parameters and recovery
characteristics to support future development decisions. The FRT remains on track to begin
in February 2026, fully consistent with the original project schedule. Initial results are
Construction of Pilot Plant Completed On Time and
Under Budget
2
expected during the first quarter of calendar year 2026, providing an important near-term
value catalyst for the Samphire project and Alligator’s broader ISR uranium strategy.
Alligator’s CEO Andrea Marsland-Smith stated: “achieving practical completion is a
major step forward for the Samphire project and a clear demonstration of Alligator’s ability
to execute complex project milestones safely and efficiently. The team has delivered an
incredibly high quality facility within the planned schedule and budget, which positions us
strongly as we move into final commissioning and trial operations. We are excited to enter
this next phase and look forward to delivering early field recovery results in the March
quarter of 2026, with field recovery trials expected to be completed in the June quarter of
2026 and the outcomes feeding directly into the Bankable Feasibility Study, which is
targeted for completion in early 2027.
Running in parallel with the FRT, 2026 is expected to be a busy year, with the mining lease
permitting process underway and an updated Mineral Resource Estimate planned for the
first half of 2026.”
This announcement was authorised for release by the Board of Alligator Energy Ltd.
Figure 1: Alligator Staff With Ahrens And Department of Energy and Mining Employees
3
Figure 2: Aerial View – Field Recovery Trial Plant
Figure 3: View Looking South – Field Recovery Trial Plant
4
Figure 4: View Looking North – Field Recovery Trial Plant
Figure 5: Lined Pond Used For Hydrogeological Testwork Associated With The Trial
5
Contacts
For more information, please contact:
Ms Andrea Marsland-Smith
CEO
Mr Joe Sutanto
CFO & Company Secretary
For media enquiries, please contact:
Jeffrey Sterlson Alex Cowie
Stakeholder Engagement Manager Media & Investor Relations
js@alligator energy.com.au alexc@nwrcommunications.com.au
This announcement contains projections and forward-looking information that involve various risks
and uncertainties regarding future events. Such forward-looking information can include without
limitation statements based on current expectations involving a number of risks and uncertainties
and are not guarantees of future performance of the Company. These risks and uncertainties could
cause actual results and the Company’s plans and objectives to differ materially from those
expressed in the forward-looking information. Actual results and future events could differ materially
from anticipated in such information. These and all subsequent written and oral forward-looking
information are based on estimates and opinions of management on the dates they are made and
expressly qualified in their entirety by this notice. The Company assumes no obligation to update
forward-looking information should circumstances or management’s estimates or opinions change.
Alligator Energy is a uranium and energy metals project development and exploration group with
clear pathways for approval and development through its multi-jurisdictional portfolio. The Alligator
Energy Directors and Leadership Team have significant uranium experience including achieving
approval of WA’s first uranium mine at the Wiluna Uranium Project (Toro Energy), discovery and
pre-feasibility study of the Husab Uranium Mine in Namibia (Extract Resources) and management
roles with WMC Olympic Dam, ERA Ranger Mine and Heathgate Resources uranium ISR
operations at Beverley and Four Mile.
About Alligator Energy
Forward Looking Statement
6
Projects