Quarter Highlights
Alligator Energy Limited (“Alligator”, “AGE” or the “Company”) is pleased to release the 31 December 2023
Quarterly Activities Report.
Uranium - Samphire Project
•
Resource infill drilling was completed in early October, with 117 holes for 10,062 m drilled in total for the
2023 calendar year.
•
The infill drilling was successful in converting a further portion of the Inferred Category of the JORC
Blackbush Mineral Resource to Indicated:
-
The Indicated Mineral Resource increased by 21% to 12.9Mlbs at an average grade of
754ppm U3O8 – a 115% increase since commencement of resource drilling in 2022.
-
2.2Mlbs U3O8 was converted to Indicated Resource, with a corresponding drop in Inferred
resource of 2.9Mlbs.
-
74% of the metal in the total MRE is now classified as Indicated.
•
At 250ppm cut-off grade the Blackbush Mineral Resource Estimate 1 (MRE) now stands at an Indicated
Mineral Resource of 12.9Mlbs at 754ppm and an Inferred Mineral Resource of 4.6Mlbs at 447ppm,
totalling 17.5Mlbs at 640ppm U3O8.
•
An increase in the confidence level of the MRE for Blackbush supported an update to the initial2 Scoping
Study in December incorporating a lift in the annualised in-situ recovery (ISR) Production Target from
1Mlbs pa to 1.2Mlbs pa, and an increased price assumption to US$75 / lb. Key highlights from the
updated study include:
-
69% increase to the post-tax NPV8 to A$257M.
Reduction in payback period by 30% to 2.45 years.
Net project cashflow (post Capex and tax) increase of 52% to A$467M.
20% step-up in the steady state annual Production with only a minor 2% increase in capital
expenditure forecast to A$131M.
Favourable average cash operating costs (C1) of A$22.94/lb U3O8 (US$16.06/lb U3O8) with a
range of A$21.79/lb - A$24.09/lb and AISC of A$47.58/lb U3O8 (US$33.31/lb U3O8) with range
of A$45.20/lb to A$49.96/lb.
•
An Exploration Target Range estimate of 14Mlbs to 75Mlbs of contained eU3O8 (using 250 ppm
eU3O8 cut-off) was established during the quarter for areas outside of the Blackbush MRE envelope
comprising extensions to Blackbush mineralisation, the Plumbush Prospect as well as other areas of
known mineralisation:
In calculating the Exploration Target Range results show that with 64 kms of interpreted host
palaeochannel strike length, only 10% of the prospective system (Blackbush Deposit and portion
of Plumbush Prospect) has been well explored, with a further 30% partly drill tested, and
58% (over 37 kms) of the prospective areas of the palaeochannel system remain completely
untested, indicating the significant potential for new discoveries in the Project area.
•
AGE’s Retention Lease Application (RLA) to conduct its Field Recovery Trial (FRT) progressed with
formal feedback received from the Department for Energy & Mining (DEM) on 20 December 2023
regarding the public consultation and the various SA Government Department’s submissions. Drafting
of AGE’s formal responses to the submissions is currently in progress.
1 AGE ASX Release 7 December 2023; 02751141.pdf (weblink.com.au)
2 AGE ASX Release 14 March 2023, https://wcsecure.weblink.com.au/pdf/AGE/02643151.pdf
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 2 of 26
•
Off-site fabrication of the Field Recovery Trial pilot plant by Adelaide Control Engineering (ACE) is
nearing completion and transport of the pilot plant to AGE’s Whyalla storage facility will occur late
February/early March after initial wet commissioning and acceptance testing has been completed.
Big Lake Project
•
A cultural heritage survey of proposed 2024 drill lines was undertaken in November by the
Yandruwandha Yawarrawarrka Traditional Landowners. Subject to receipt of final report and finalisation
of drilling contract, the 5,600 m stratigraphic, concept-testing drill program will commence in March 2024.
Nabarlek North Project
•
All 2023 exploration and rehabilitation work was completed during the quarter. This included a ninehole reverse circulation drilling program of 1,398 m, with hole NNRC23-008 returning a significant
intercept of 3m at 0.12% U3O8 along trend from the U40 Prospect (refer ASX release of 18 December
2023).
Energy Minerals - Piedmont Project (Ni Cu Co)
•
Based on the technical review and recommendations of the previous quarter, renewal of the principal
tenement of Alpe Laghetto was initiated. A proposed works program was compiled and presented to the
Turin Region Mines Department as part of the renewal process.
Corporate
•
•
Cash balance at quarter end of $36.6M.
•
•
The Company held its 2023 AGM on 24 November 2023.
•
In December 2023, the Company completed terms for an initial investment commitment of $900k in
EnviroCopper Ltd (ECL), an unlisted company undertaking early-stage copper ISR test work and trials
on two oxide copper projects in South Australia. Alligator has the sole funding right to optional future
investments in ECL up to 50.1%.
In October 2023, the Company successfully completed a share purchase plan (SPP) offer raising
$3.26M before costs, at an issue price of $0.052 per share.
In late November 2023, the Company issued 273,961,390 premium priced options under the terms of
both the Placement completed in September 2023 and the SPP outlined above. The options are
exercisable at $0.078 each at any time before 28 November 2025. AGE successfully applied for
quotation of the Options with ASX which now trade under the code AGEOC.
Plans for the forthcoming quarter:
•
Samphire
- Exploration and resource extension drill testing commencing late January 2024 to advance toward
extending the life of mine, with a drill rig secured for year-round drilling in 2024. All land access and
other approvals in place for this work.
- Progression of the RLA to approval via submission of AGE’s formal responses the public/SA
Government consultation on the application and submission of a Program for Environmental
Protection and Rehabilitation (PEPR). The approval of the latter is required prior to commencement
of FRT operations.
- Transport of FRT infrastructure to Whyalla in readiness for on-site construction (post receipt of lease
and PEPR approvals).
- Initiation of optimisation studies (water, power, transport, logistics etc.) required to be concluded prior
to commencement of a feasibility study. In addition, AGE is looking for ways to develop a low
emission, low environmental and social impact operation and will commence early work on these
evaluations and extend this in parallel to the feasibility study.
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 3 of 26
•
Big Lake – A 40-to-45-hole drilling program (circa 5,600m) is planned for commencement late in the
forthcoming quarter. The program is the first step as ‘proof of concept’ for suitable host / concentration
mechanisms for uranium bearing mineralisation in the formations overlying the Cooper Basin.
•
Nabarlek North – Review and integration of all 2023 exploration data (geochemistry, IP, surface
mapping and drill hole data), leading to refinement of target areas and exploration proposals for the
2024 field season. This includes looking at further potential along trend from the U40 Prospect following
the significant uranium intercept from RC drilling in 2023.
•
Piedmont – Subject to securing tenure renewal approval, planning to be progressed for reconnaissance
geochemistry and geological mapping work across the district for May/June 2024.
Uranium Market
•
Spot uranium price increased from US$73.50 / lb at end of September to US$100 / lb at end December
2023 – an increase of 36% in three months.
•
•
Long term market pricing increased from US$62 / lb to US$68 / lb.
•
A “Prohibiting Russian Uranium Imports Act” Bill was passed through the US House of Representatives
and is awaiting approval in the Senate.
•
Uranium volumes contracted in the Term market topped 160 M lbs for 2023, compared with around 120
M lbs in 2022. This increased volume is still less than the replacement rate for uranium burn-up in the
existing reactor fleet.
•
During January, Kazatomprom made a brief statement that 2024 and 2025 uranium production would
likely be impacted by ongoing acid supply shortages. This news had a significant impact on spot
uranium prices, lifting this to over US$100 / lb.
At COP28 nuclear energy was formally included in the final COP agreement, and 22 countries
committed to a tripling of nuclear power capacity by 2050.
Samphire Uranium Project Development
Blackbush Mineral Resource
Resource drilling was completed for the 2023 calendar year in early October at the Blackbush Deposit with
continued focus on increasing the confidence of the Mineral Resource Estimate (MRE) through conversion of
the Inferred category to Indicated status. A total of 117 holes (for 10,062 m) were completed.
Drilling was carried out primarily in the northern Blackbush West area which historically had very little Prompt
Fission Neutron (PFN) acquired grade data (pU 3O8) required for conversion of the mineral resource to
Indicated status. Several significant uranium intercepts were encountered (BBRM23-126, 128, 133, 136, 142
& 144) in addition to the southern area (BBRM23-121,122, 123, 124, 154, 161, 163, 171, 175 & 184) showing
that high-grade mineralisation extends beyond the area of the current Indicated Resource (Figure 1).
Mineralisation also remains open to the west which will be drilled at the recommencement of drilling in late
January 2024.
AMC Consultants were provided with this additional drill data to update the Mineral Resource Estimate (MRE)
which was completed and announced in December 20233. An additional 2.2MLbs was converted to the
Indicated Mineral Resource category, which increased from 10.7MLbs to 12.9Mlbs at an average grade of
754ppm U3O8. This is a 21% increase from the previous Indicated MRE with no change in cut-off grade which
has remained at 250ppm U3O8.
Overall, 74% of the Blackbush Mineral Resource is now classified as Indicated; a notable improvement from
40% in AGE’s initial MRE targeting In-Situ Recovery announced September 2022. In summary at 250ppm cutoff grade the Blackbush resource now stands at Indicated Mineral Resource of 12.9Mlbs at 754ppm, and an
3 AGE ASX Release 7 December 2023; 02751141.pdf (weblink.com.au)
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 4 of 26
Inferred Mineral Resource of 4.6Mlbs at 447ppm, totalling 17.5Mlbs at 640ppm U 3O8 (refer Blackbush Mineral
Resource Estimate Table at the back of this report).
Figure 1: Current Inferred resource area outline (blue) and Indicated Resource area outline (red) showing AGE 2023
drilling focussed within the Inferred Resource envelope.
Exploration Target Range
An Exploration Target Range was announced on 7 December 20234 and was estimated in accordance with
JORC 2012 Clause 17 based on several factors including over 1,000 historical drillholes, statistical analysis of
high and low range grade intercepts, thicknesses of target sand horizons (Kanaka Bed sands), palaeochannel
strike length and the presence of underlying uraniferous granites combined with geophysical structural
interpretations.
The Exploration Target Range is currently 16Mt to 37Mt at a grade between 390 and 903ppm eU3O8 for a
range of 14Mlbs to 75Mlbs of contained eU3O8 at 250ppm cut-off. The range does not include the Blackbush
Mineral Resource Estimate. The work identified 11 discrete palaeochannel areas, of which 5 were used in the
above estimate (see Table 1 and Figure 2). Only Kanaka Bed sands that hosted areas amenable to In-Situ
Recovery (ISR) were considered. Key advantages for AGE’s Samphire exploration programs are:
4
-
With 64 kms of interpreted palaeochannel strike length, only 10% of the prospective system
(Blackbush Deposit and portion of Plumbush Prospect) has been well explored, with a further 30%
partly drill tested.
-
58% (over 37 kms) of the prospective areas of the palaeochannel system remain completely untested,
indicating the significant potential for new discoveries in the Project area.
AGE ASX Release 7 December 2023; 02751150.pdf (weblink.com.au)
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 5 of 26
Table 1: Samphire Exploration Target Range including 5 out of 11 target areas within the Samphire Uranium Project
Area.
Target Area
Estimated Tonnage
(Mt)
Estimated Grade (ppm U3O8)
Estimated Exploration
Target Range (Mlb)
Min
Max
Min
Max
Average
Min
Max
Blackbush Extension 1
0.82
1.69
354
922
543
0.64
3.43
Blackbush Extension 2
2.09
4.94
382
697
487
1.76
7.59
North-eastern Channels
3.18
7.20
353
795
500
2.47
12.62
Eastern Channels
6.77
12.62
332
426
363
4.95
11.85
Plumbush
3.11
10.63
530
1676
912
3.63
39.28
14
75
Blackbush North
Not included in Target Range
Central Channels
Not included in Target Range
Western Channels
Not included in Target Range
Plumbush Extended
Not included in Target Range
Far North
Not included in Target Range
Far South
Not included in Target Range
TOTAL
Figure 2: Map highlighting the 11 target area locations within the Samphire Uranium Project Area.
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 6 of 26
Samphire Scoping Study Update
Adelaide-based Wallbridge Gilbert Aztec (WGA) consultants were engaged to update the initial Scoping Study5
for Samphire targeting an increased production rate and an update of other key factors. The update was
announced on 14 December 20236.
The Updated Scoping Study delivered a 69% increase to the post-tax NPV8 to A$257M (A$244 M - A$270M)
up from A$152M which was principally driven by:
-
An increase in the annualised Production Target from 10.0 Mlbs U3O8 to 12.3 Mlbs pa over the same
12-year period which lifts revenues and free cashflows over a similar life-of-mine (LOM) assumption.
-
Improved knowledge base and understanding through AGE progressing with the field recovery trial
(FRT) planning, procurement, resource modelling and refinement of process design leading to some
modifications to the original design criteria.
-
Updating of other key inputs, principally commodity price and major component costs to reflect current
market indicators.
Other key outcomes include:
-
Enhanced Project economics at a forecast US$75/lb U3O8 realised sales price (previously US$65/lb)
and an unchanged A$:US$ exchange rate of 70 cents.
-
Post-tax internal rate of return (IRR) of 42% (40.0% - 44.1%) up from 29%.
-
Reduction in payback period by 30% to 2.45 years from start of production.
-
Forecast net project cashflow (post Capex and tax) increase of 52% to A$467M (A$443M A$490M).
-
Low initial capital expenditure forecast of A$131M (A$124M-A$138M) being an increase of 2% to
achieve the 20% step-up in the steady state annual Production Target - including consistent
application of contingency (30%) and a 5% escalation assumption (down from 10% previously due to
improved ability to estimate costs).
-
Favourable average cash operating costs (C1) of A$22.94/lb U3O8 (US$16.06/lb U3O8) with a range
of A$21.79/lb - A$24.09/lb) and AISC (including transport, shipping, royalties and sustaining capital)
of A$47.58/lb U3O8 (US$33.31/lb U3O8) with range of A$45.20/lb to A$49.96/lb when compared to
other ISR operations and restart projects (Figure 3).
Figure 3: Comparison of AISC and C1 Costs for ISR uranium mine development or restart projects (Data sourced from
most recent published economics data by each Company).
5
6
ASX Announcement 13 March 2023; Scoping Study – Samphire Uranium Project, 45mmn6z3xk5r5p.pdf (asx.com.au)
ASX Announcement 14 December 2023; Scoping Study Update– Samphire Uranium Project 02753924.pdf (weblink.com.au)
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 7 of 26
Field Recovery Trial
In August 2023 AGE submitted its RLA to DEM to conduct a pilot ISR field trial. As part of the formal review
and approval process, a public review and consultation period for this application concluded late September
2023 with formal feedback received from the Department for Energy & Mining (DEM) on 20 December 2023
regarding the public consultation and the various SA Government Department’s submissions on the
application. Drafting of AGE’s formal responses to the submissions is currently in progress as the next step
towards approval of the Lease.
Fabrication of the containerised FRT plant by Adelaide Control Engineering (ACE) continued during the quarter
and is nearing completion with the current status as follows:
- Wellhouse module construction completed (Figure 4).
- Ion exchange (IX) columns were delivered on 15 December 2023, pipework fitting is in progress
(Figure 5).
- Control system programming 70% complete.
Preparatory work such as planning for on-site assembly, civil design and ordering of supporting infrastructure
(e.g. tanks, wellfield lines, office, ablutions, generators etc) for the FRT is in progress. Transport of the pilot
plant to AGE’s Whyalla storage facility will occur late February/early March after initial wet commissioning and
acceptance testing has been completed.
Figure 4: Completed wellhouse module.
Figure 5: Progress of ion exchange module fabrication
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 8 of 26
Big Lake Uranium (BLU) Project
Highlights for the quarter include:
•
A Program for Environmental Protection and Rehabilitation (PEPR) for the proposed 2023 field
exploration program was approved by the SA Department for Energy and Mining, subject to re-submittal
/ endorsement of a more comprehensive radiation management plan (RMP). The RMP has now been
separately approved and an updated PEPR will be compiled.
A formal clearance of drill lines with eight members of the Yandruwandha Yawarrawarrka Traditional
Landowners Aboriginal Corporation (YYTLOAC) was carried out in November 2023. Based on initial
feedback, Traditional Owners have no significant cultural issues with the drilling proposals. Now
awaiting formal report from YYTLOAC prior to locking in drilling program for end of March 2024.
•
•
Drilling proposals covering EL 6367 remain mostly unchanged from the previous quarter and are based
around a series of drill lines or ‘fences’ to better understand the target stratigraphy in key areas across
the Basin. In total 5,600 m of air-core drilling is planned over 40 – 45 holes, with average depths of
140m. Holes will be assayed to further assist with fine-tuning the seismic interpretation and data
integration.
First drilling program (principally stratigraphic and concept testing) expected to take four to six weeks,
with plans already underway to organise follow-up, and more targeted, drilling before the end of 2024.
•
Figure 6: Big Lake Project. AGE Big Lake drilling proposals for March/April 2024 as a series of fences. Sites
were inspected and cleared by traditional owners in November 2023 (final report pending).
Alligator Rivers Uranium Province (ARUP)
•
All exploration programs for 2023 were completed by November 2023. This included 15 km 2 of
gradient IP, 3.4 km of dipole-dipole IP, over 320 air-core holes, 100 shallow auger holes and a 1,398
m RC drilling program (see details below).
•
RC drilling comprised 9 holes forming a three-fence program (3 holes per fence). This drilling
provided critical ties with recently completed geophysics, 2022 – 2023 geochemistry sampling and
geological interpretations. As reported in ASX release of 19 December
(https://wcsecure.weblink.com.au/pdf/AGE/02755611.pdf), significant uranium was intercepted in
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 9 of 26
NNRC23-008 returning 3m at 0.12% (1,211ppm) U3O8. This will form the basis of further
investigations to understand the potential continuity of U40 prospect mineralisation into AGE’s
Nabarlek North (NN) project and aid with broader target generation (see Figure 7).
•
Northern Territory DITT, Office of the Supervising Scientist and the Northen Land Council (NLC)
undertook an audit of AGE’s NN exploration activities in early October. Overall, findings were very
positive with only minor recommendations now incorporated into the 2024 MMP planned for
submission early Q1 24.
•
Consultation meeting was held with Nabarlek North Traditional Owners and the NLC in mid-October
to present 2024 work programs with current works well received and consent provided for all 2024
proposed works.
•
Subject to delivery of remaining 2023 assay and geophysical data through January, planning for the
forthcoming field season will commence immediately. This will include a greater emphasis on
highlighted target zones, based primarily on key structures, sub-cover geochemistry and host rock
mapping. Along with potentially more drilling on trend from the U40 prospect, the 2024 program will
extend the current search space into northern portions of AGE’s Nabarlek North project area for the
first time.
Figure 7. AGE Nabarlek North Project and tenure showing locations of 2023 RC drilling (green circles), AC drilling
(yellow circles) and area of coverage with IP geophysics (both gradient and dipole dipole – brown polygon)
Piedmont Nickel Cobalt Project - NW Italy
•
Arrangements were made to renew Piedmont tenure licences stemming from the technical
recommendations of the previous quarter. All required paperwork was submitted prior to the expiry
date for a renewal extension related to the Alpe Laghetto licence.
•
As part of the license renewal, a technical report was submitted to the Italian mining authorities
covering all exploration work undertaken by the AGE and its joint venture partner. The submission
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 10 of 26
included relinquishment of 13.9 km2 of the Alpe Laghetto licence, representing 47% of the original
area (29.48 km2), based on suitability of Ni-Cu-Co target host rock (Figure 8). Recommendations
were also made for future exploration including:
•
o
o
o
o
Regional chemical mapping based on a key suite of metals.
A structural interpretation.
Field mapping in key areas identified from above.
Consideration given for another airborne EM survey but to cover the entire belt
o
A heli-supported drilling program in 2025, should suitable targets be identified from the above
work programs.
JV meeting held on 18 December to discuss and agree on the program going forward. Initial planning,
subject to obtaining the necessary renewals is underway in preparation of reconnaissance work across
the entire district in Q2 2024.
Figure 8. Piedmont project area. While the La Balma and Alpe Laghetto prospects have been the focus of recent
work, the entire district is prospective for Ni-Cu-Co deposits and has seen limited modern systematic exploration.
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 11 of 26
Market Update
The spot uranium price increased from US$73.50 / lb at end September 2023 to reach US$100 / lb by the end
of the quarter. The spot price reached a high of US$106 / lb in mid-January. Long term market price indicators
(based on fixed price escalated contracts) increased from US$62 / lb to US$68 / lb by quarter end.
There was a continued significant resurgence of interest in, and commitment to the ongoing use and growth
of nuclear power to support global efforts to reduce greenhouse gas emissions.
The September World Nuclear Association annual symposium recognised a critical need for expansion of
nuclear power, with many presentations on the consequent pressure on the nuclear fuel cycle – i.e. supply of
uranium, conversion and enrichment.
At COP28, held during the quarter nuclear energy was formally included in the COP agreement. At this event,
22 countries committed to a tripling of nuclear power capacity by 2050, in conjunction with other sustainable
and renewable energy sources, to enable continued emission reduction targets to be met globally.
A “Prohibiting Russian Uranium Imports Act” Bill was passed through the US House of Representatives, and
is awaiting approval in the Senate. This Bill would establish annual caps on the amount of low enriched
uranium that may be imported into the US through to the end of 2027.
The US is also supporting domestic enrichment capability, with the White House recently requesting $2.2 B
from Congress to boost U.S. enrichment capacity. Along with this, the US House of Res recently passed the
RELEIVE Act which includes $2.7 B in funding for the “expenses necessary for at least two competitive awards
for the acquisition and distribution” of LEU and HALEU.
The USA, Canada, France, Japan, and the UK announced plans at COP28 for government-led investments in
uranium enrichment/conversion in the next 3-years.
The UK Government announced an investment of £300 million to support future domestic production of High
Assay Low Enriched Uranium (HALEU) nuclear fuel, which would support the next generation of Small Modular
Reactors.
The USA also announced it was seeking bids from contractors to establish a domestic HALEU production
facility, allocating US$500 million for this.
Uranium volumes contracted in the Term market topped 160 M lbs for 2023, compared with around 120 M lbs
in 2022. This increased volume is still less than the replacement rate for uranium burn-up in the existing
reactor fleet.
During January, Kazatomprom made a brief statement that 2024 and 2025 uranium production would likely be
impacted by ongoing acid supply shortages. This news had a significant impact on spot uranium prices, lifting
this to over US$100 / lb.
Other significant nuclear industry news included:
•
•
•
•
Sweden removes cap which previously limited the number of reactors to 10. Recall Sweden is looking
to have 10 operating rectors (incl. SMRs) by 2045, up from 6 today.
Ontario Power Generation to cooperate with EDF (France) and Westinghouse on potential new
reactors in Canada (currently, all reactors in Canada are CANDU).
Uzbekistan in talks with several parties (incl. Russia) to build its potential first reactor.
Belgium Govt and its utility agree on 10-year extensions for its 2 remaining reactors (PM calls for an
additional 10-years). Belgium was previously to shutdown all its reactors by 2025.
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 7 3839 3904
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | Page 12 of 26
•
•
•
•
Poland’s first reactor gets government approval (targeting operating in 2035).
EDF to build at least 1 reactor (EPR2) per year starting in the 2030s. France has initial plans for 6 new
reactors, plus the potential for another 8.
EDF submits offer to build new reactors in Slovenia (two smaller or one larger reactor).
Two Holtec 300 MW SMRs to be built at Palisades in Michigan by mid 2030s.
Corporate
In October 2023, the Company successfully completed a share purchase plan (SPP) offer raising $3.26M,
before costs, at an issue price of $0.052 per share. The funds raised under the SPP are planned to be used
for:
•
•
•
•
•
Samphire - Feasibility study and mining lease application
Samphire - Ongoing resource drilling and geophysics program
Exploration on targets Nabarlek North (ARUP) and follow up drilling at Big Lake
Business development opportunities and
Corporate costs and general working capital.
In late November 2023, the Company, after obtaining Shareholder approval at the 2023 AGM, issued
273,961,390 premium priced options under the terms of both the Placement completed in September 2023
and the SPP outlined above. The options are exercisable at $0.078 each at any time before 28 November
2025. AGE successfully applied for quotation of the Options with ASX which now trade under the code AGEOC.
In December 2023, the Company completed terms for an initial investment commitment of $900k in
EnviroCopper Ltd (ECL) an unlisted company undertaking early stage ISR test work and trials on two oxide
copper projects in South Australia. The transaction also involves Alligator and ECL entering into a
Shareholder’s Agreement providing Alligator with an exclusive option to sole fund ECL’s activities and increase
its equity ownership in ECL to 50.1% over the next ~4 years. Optional future investment in ECL will be on the
following basis:
•
•
•
Stage 1 Investment: Following the Initial Investment, in mid-2024, Alligator may elect to invest a further
~$1.1 million to increase its interest in ECL to 15.6%. Should Alligator elect not to make the Stage 1
Investment, it will offer a 6-month working capital facility to ECL up to a maximum of A$450,000 to
allow for alternative funding sources to be pursued.
Stage 2A Investment: Following the Stage 1 Investment outcomes and upon receipt of a satisfactory
Stage 2A budget programme from ECL, Alligator may elect to invest a further ~$2.0 million to increase
its interest in ECL to 26.7%.
Stage 2B & 2C Investment: Following the Stage 2A Investment outcomes and upon receipt of
satisfactory Stage 2B & 2C bu