Corporate Presentation - May 2024
Released
Released
Announcement PDF
ASX:AGE
Advancing Samphire into
Trial Production
May 2024
Disclaimer
Forward Looking Statements
This presentation contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can
include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance of the Company.
These risks and uncertainties could cause actual results and the Company’s plans and objectives to differ materially from those expressed in the forward-looking information. Actual
results and future events could differ materially from anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates
and opinions of management on the dates they are made and expressly qualified in their entirety by this notice. The Company assumes no obligation to update forward-looking
information should circumstances or management’s estimates or opinions change.
Competent Person’s Statement – Uranium
Information in this report is based on current and historic Exploration and Resource Drilling Results compiled by Dr Andrea Marsland-Smith, who is a Member of the AusIMM. Dr
Marsland-Smith is employed by Alligator Energy as Chief Operating Officer (COO) and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity she is undertaking (including 15 years working with ISR uranium development and operations) to qualify as a Competent Person as defined in
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr Marsland-Smith consents to the inclusion in this release of
the matters based on her information in the form and context in which it appears.
Competent Person’s Statement – Nickel Cobalt exploration
Information in this report is based on current and historic Exploration Results compiled by Mr Geoffrey Chapman who is a Fellow of the Australasian Institute of Mining and
Metallurgy. Mr Chapman is a Consultant Geologist with Alligator Energy Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves. Mr Chapman consents to the inclusion in this release of the matters based on his information in the form and context in which it
appears.
2
Alligator Corporate Presentation | May 2024 | ASX:AGE
Company Snapshot
Capital Structure (as at 30 April 2024)
Share Price
$0.06
Ordinary Shares
3,862.3 M
Perf Shares, Listed & Unlisted Options
464.4 M
Cash as at 31 March 2024
$ 32.7 M
Market Cap
$231.7 M
Top 50 Shareholders
Brokers &
Banks
22%
Retail
45%
Directors
&
Executives
5%
Institutions
28%
3
Alligator Corporate Presentation | May 2024 | ASX:AGE
Board & Management
4
Paul Dickson | Non-Executive Chairman
Callum McIntyre | Alternate Director
Paul is a finance and corporate advisory professional with more than 30 years’ experience
in the finance services industry. He was a Founding Director at Paradigm Capital, a
boutique corporate advisory firm specialising in junior and mid-tier ASX listed resources
companies, and a Director of Proserpine Capital a private equity firm for circa 4 years.
Paul has been an AGE Board member since inception and Chairman for 3 years.
Callum has extensive experience in the finance and technology industries, both in
Australia and overseas. He is currently Director Business and Investment at Labonne
Enterprises, a private investment company. He is also a Director of ReCircle, a private
Company researching the recovery and reuse of soft plastics. He holds a BSc from the
University of WA, and Graduate Diploma of Applied Finance.
Gregory Hall | CEO & Managing Director
Mike Meintjes | CFO & Company Secretary
Greg is an experienced mining engineer and CEO with 35+ years’ experience in
uranium and other mine management. He previously held roles at WMC Olympic
Dam & nickel mines, LKAB Iron Ore (Sweden), ERA Ranger & Jabiluka Uranium and
international commodities marketing with Rio Tinto (ERA) Uranium, and Bauxite &
Alumina groups. Greg was also founding CEO of Toro Energy Ltd.
Chartered Accountant/CFO/Company Secretary. Over 30 years professional
services principally with a Big Four accounting firm and recently in part-time
contracting and consulting roles. Extensive exposure to mining, oil & gas sectors in
WA, QLD and South Africa. CFO and Co Sec for AGE for 11 years
Peter McIntyre | Non-Executive Director
Dr Andrea Marsland-Smith | COO
Peter is a civil engineer and experienced CEO. He previously held GM roles with
WMC Ltd, including development of major mining projects. Peter was the founding
MD of Extract Resources during the discovery and pre-feasibility of Husab Uranium
mine in Namibia, sold for US$2.2 billion.
Andrea was previously at Heathgate Resources with roles over 15 years covering
technical and field positions in Geology, Head of Geology, Head of Regulatory &
Compliance, Head of Operations and Head of Government Relations and
Indigenous Affairs. She holds a PhD in Economic Geology and was the recipient of
Exceptional Women in Resources in 2016.
Fiona Nicholls | Non-Executive Director
Mike Barlow | Exploration Manager
Fiona has 30 years of experience working across a range of business functions
including strategy, planning, ESG and operations, multi-country project
development and approvals and due diligence processes. Fiona was previously on
the Board of Rössing Uranium and alternate director for ERA uranium.
Mike has over 30 years in mineral exploration leading greenfields and brownfields
programs with BHP, Rio Tinto, Comalco and most recently, with Geoscience
Australia. He has served in management and technical roles for resource
identification and development in copper, lead and silver, along with oil and gas,
and laterite deposits. Mike is also a member of ASEG and AusIMM.
Alligator Corporate Presentation | May 2024 | ASX:AGE
Fundamentals point to stronger spot and term prices
Supply
Spot uranium in a multi-year bull market
• Structural supply deficit forecast through to at least 2028
• Fragile supply picture, with elevated geopolitical risks
• Heightened supply risk from major producers, with Kazatomprom
guiding to restricted production due to acid shortages and delays to
mine construction.
• Kazakhstan produces 44% of world’s uranium, and this is shipped
via Russia.
• US close to imposing sanctions on Russia
• Structural deficit even after prices have tripled
Demand
• At COP28, 22 countries agreed to triple nuclear power by 2050
• 2023 LT uranium contracts of 160 Mlbs highest since 2012
• SPUT purchased >60 Mlbs of uranium and steadily acquiring more
• Amazon’s acquisition of nuclear-powered data centre at Talen
illustrative of the rising demand for reliable 24/7 power for this
industry.
• Potential for SMRs to add to future demand
5
Alligator Corporate Presentation | May 2024 | ASX:AGE
Source: Trading Economics
Prices
• Spot price doubled in ~12 months from US$50 / lb
to recent peak of US$106 / lb.
• Long term price now estimated at
– US$80 / lb (Trade Tech)
– US$75 / lb (UxC)
Uranium and Nuclear Fuel - Commodity Price Drivers
• Primary mine supply, mine re-starts, new mines under
development plus new planned mines still potentially not
adequate for future supply.
• New mines are and will take longer to market due to
approvals, development and design skills needed, financing
and politics.
• Utility fuel buyers running inventories very low to avoid /
delay coming to market while prices high.
• Due to relatively low impact of U prices on nuclear costs,
largely inelastic demand despite rising prices.
• Existing producers will find ways to extend mine life,
however will also take time.
• Faster to build a nuclear plant in China and India than it is to
start a uranium mine in Australia.
6
Alligator Corporate Presentation | May 2024 | ASX:AGE
Samphire Uranium Project,
South Australia
7
Alligator Corporate Presentation | May 2024 | ASX:AGE
Samphire Highlights
8
20kms from
Whyalla, SA
JORC compliant
resource
Regional exploration
opportunities
Excellent regional
infrastructure and
skilled labour-force
17.5 Mlbs uranium resource
with significant scope for
further growth
Exploration Target
estimates additional
14 - 75 Mlbs
Robust Scoping Study1.2 Mlb / annum prod.
Pilot plant
planned
ESG
US$131m capex, 42% IRR,
and 2.45 yr payback
Construction in Q3 subject to
approvals
Alligator Corporate Presentation | May 2024 | ASX:AGE
Strong ESG credentials,
with environmental
commendation awarded by
SA government
Samphire Uranium project: A highly competitive ISR project
• Initial capital cost estimate of US$131 million is low,
despite significant contingencies and inflation totalling 35%.
• AISC at the lower end of cost curve, due to:
➢ In-situ Recovery (ISR) amenable,
➢ nature of the deposit, shallow depth, excellent
formation porosity, and
➢ high leaching dynamics.
• Location near Whyalla affords lower cost of key
infrastructure, locally based workforce (i.e. no FIFO or camp),
experienced mining services and business support.
• Expansion potential - Exploration Target Range (released
Dec 23) estimating an additional 14 - 75 Mlbs. Multi-year
resource extension and step-out drilling to increase mine life
and production rate.
• Field Recovery Trial (derisking underway) on receipt of all
regulatory approvals (approx. early Q3), to de-risk project and
confirm parameters to be used in a full feasibility study during
2025
9
Alligator Corporate Presentation | May 2024 | ASX:AGE
Conceptual Model of ISR
Samphire Uranium Project – Dec 2023 Scoping Study† : Key Metrics
Study metrics* at US$75 / lb uranium price
A$131m
2.45 years
42%
A$257m
US$33.31/lb
US$16.06/lb
CAPEX
Payback
IRR*
NPV8*
AISC
Cash Costs
(post-tax, real,
ungeared)
(post-tax, real,
ungeared)
(A$47.58/lb)
(A$22.94 /lb)
(including contingency)
Study metrics* based on analysts current long-term price projections of US$90 / lb
A$131m
1.93 years
55%
A$371m
US$34.06/lb
US$16.06/lb
CAPEX
Payback
IRR*
NPV8*
AISC
Cash Costs
(post-tax, real,
ungeared)
(post-tax, real,
ungeared)
(A$48.96/lb)
(A$22.94/lb)
(including contingency)
† Ref ASX release 14 December 2023 “Scoping Study Update”: Alligator confirms that all material assumptions underpinning the ‘production target’ or the forecast financial information derived from the
‘production target’ continue to apply and have not materially changed other than the outlook for the long-term uranium price as set out above; *Calculated using 0.70 US/A$ exchange rate inclusion of significant
contingencies and inflation of 35%.
10 Alligator Corporate Presentation | May 2024 | ASX:AGE
Samphire Uranium Project – Blackbush JORC Resource
JORC
Category
Mt
Grade
(U3O8 ppm)
U3O8 Metal
(KTonnes)
U3O8 Metal
(Mlbs)
Indicated
7.8
754
5.9
12.9
Inferred
4.6
447
2.1
4.6
Total
12.4
640
7.9
17.5
Ref: ASX Release 7 December 2023
11 Alligator Corporate Presentation | May 2024 | ASX:AGE
Samphire Uranium Project - Scope to Scale & Optimise
Recent Scoping Study
update increased
production target to
1.2Mlbs pa. Future drilling
will target increased mine
life and/or production rate
Further extension potential
at the Blackbush deposit &
Plumbush prospect,
including regional
exploration on known
mineralised channels
Alligator Corporate Presentation | May 2024 | ASX:AGE
Modular plant for scalable
production capacity
Scope for processing
efficiencies, to reduce
costs for the Reverse
Osmosis (RO) plant and
also increasing recovery
rates
12
Samphire Uranium Project – Resource Growth Potential
Regional ground gravity showing potential palaeochannel extensions
Blackbush resource growth potential
• Coherent multi-level medium to high-grade zones with
current >2,700m cumulative strike, with widths of 300-450m.
Creating value through the drill bit
• Multi-year step-out drilling program planned
• Blackbush extension drilling underway for all of 2024
District-scale resource growth potential
• Balckbush resource growth
• Plumbush Prospect and extensions not adequately tested
• High-resolution ground gravity shows significant
palaeochannel extensions north and south of Blackbush.
64kms of known palaeochannels, with 58% unexplored.
• Potential for additional satellite deposits based on historical
mineralised intersections.
13 Alligator Corporate Presentation | May 2024 | ASX:AGE
Samphire Uranium Project – Exploration Target Range - up to 75 Mlb
Estimated
Tonnage (Mt)
Estimated Grade (ppm U3O8)
Min
Max
Min
Max
Average
Min
Max
Blackbush Extension 1
0.82
1.69
354
922
543
0.64
3.43
Blackbush Extension 2
2.09
4.94
382
697
487
1.76
7.59
North-eastern Channels
3.18
7.20
353
795
500
2.47
12.62
Eastern Channels
6.77
12.62
332
426
363
4.95
11.85
Plumbush
3.11
10.63
530
1676
912
3.63
39.28
14
75
Target Area
Blackbush North
Not included in Target Range
Central Channels
Not included in Target Range
Western Channels
Not included in Target Range
Plumbush Extended
Not included in Target Range
Far North
Not included in Target Range
Far South
Not included in Target Range
Estimated Exploration
Target Range (Mlb)
TOTAL
Next Steps:
• Current exploration drilling within Blackbush Extension 1 & 2 areas.
• Multi-year plan to explore palaeochannels surrounding Blackbush and commence
greenfield exploration between the Blackbush & Plumbush target areas.
• Identify channel extensions within the Far North and South target areas from ground
gravity data recently acquired in these areas.
14 Alligator Corporate Presentation | May 2024 | ASX:AGE
Further Extensions outside the Exploration Target Range Envelope
• Recent acquisition of additional ground gravity
identifying further exploration targets outside of
known palaeochannel system.
• Data being evaluated and checked - to be
released shortly.
• Additional palaeochannel extensions likely to the
south for up to 5 to 7 kms
15 Alligator Corporate Presentation | May 2024 | ASX:AGE
Samphire Uranium Project – Field Recovery Trial (FRT)
• Field Recovery Trial (FRT) construction targeted for Q3, pending
regulatory approvals.
• In operation for 3-4 months and consists of three producing well
patterns and a containerised pilot plant.
• FRT is designed to confirm key parameters and marks an important
step toward development.
• Parameters to be assessed include in-situ chemistry, hydrogeology,
uranium recovery, reagent usage, and other environmental and
economic factors.
• Data and learnings further de-risk the Project and provides the
necessary inputs to a full feasibility study and Mining Lease
Application during 2025.
Wellhouse (Pipe room) Module
16 Alligator Corporate Presentation | May 2024 | ASX:AGE
Samphire Uranium Project – Field Recovery Trial Plant
• Fabrication of the containerised FRT processing
Pilot plant layout
plant in Adelaide essentially complete and
undergoing Factory Acceptance Testing.
• Post completion the plant will be transported to
Whyalla ahead of securing the necessary
approvals to conduct the trial.
• Scope of work for on-site assembly being prepared
for quotation from Whyalla-based construction
contractors/businesses.
• Commissioning and operating plans are under
development for initiation.
• Post-FRT and subject to further testing, well
infrastructure and plant removed, and area
rehabilitated – pilot plant available for future
satellite field testing.
17 Alligator Corporate Presentation | May 2024 | ASX:AGE
Ion Exchange Module
Wellhouse Module (pipe room)
Exploration projects
NT, AUSTRALIA
ITALY
Piedmont NW
Alligator Rivers
(ARUP)
High Grade U
Ni-Co-Cu-Au-PGEs
SA, AUSTRALIA
Big Lake
(Cooper Basin)
ISR style U
18 Alligator Corporate Presentation | May 2024 | ASX:AGE
Alligator Rivers Uranium Province, NT
• Province is host to multiple high-grade deposits including
Ranger mine and Jabiluka deposit (358 Mlbs @ 0.53% U308).
• Alligator has the second largest granted licence area,
comprising three substantial projects in Australia’s premier
high-grade uranium province;
– Nabarlek North (493 km2). Immediately north east of
historic Nabarlek Mine (produced 24 Mlbs @ 1.84%
U308) within thin 2 – 20 m cover. Extensive exploration
program underway – including potential U40 Prospect*
extensions;
– Tin Camp Creek (291 km2). Multiple uranium targets in
well-defined regional uranium-bearing zone, including the
Caramal Resource of 6.5 Mlbs @ 0.31% U308;
– Beatrice (357 km2). Exploration by Cameco & QML
identified several mineralisation leads, including the
Beatrice Prospect with an early intercept of 19 m @ 0.36%
U308.
* Includes 6.3m at 7.23% U3O8 and 8.3m @ 2.12% Cu (Uranium Equities Ltd now DevEx Resources Ltd
release – 4 October 2017).
19 Alligator Corporate Presentation | May 2024 | ASX:AGE
Alligator Rivers Uranium Province, NT – Nabarlek North
2023 Outcomes at Nabarlek North
• Strategic testing along strike from the U40 Prospect intercepted
3m @ 0.12% U3O8*.
- AGE Tenure
- Target Areas
• Field season completed with 1,398m of RC drilling, over 320
aircore holes, 100 auger holes,15km2 gradient-array induced
polarisation (IP) and 2 Pole-Dipole IP lines at 25m dipoles for
3.4km.
• 2022 – 2023 programs set the stage for better understanding of
the nature and extent of cover, intrusives and host rock.
2024 Work Program at Nabarlek North
• 2024 program will be more targeted across the entire tenure,
with focus on RC drill-targeting at 10 – 20 specific geology +
geophysics + geochemistry features, including additional drillfences along trend from U40.
~ 10 km
2024 Work Program at Tin Camp Creek and Beatrice
• Approvals underway for on-ground activity focused on high priority targets
*See AGE announcement of 19 Dec 23: https://wcsecure.weblink.com.au/pdf/AGE/02755611.pdf
20 Alligator Corporate Presentation | May 2024 | ASX:AGE
Nabarlek North – 2024 Target Areas, including north
extensions to U40 Prospect (‘U40N’)
Big Lake Uranium Project, SA
• Overlies Cooper Basin in NW South
Australia – overlying sediments unexplored
for uranium despite geological analogies to
existing world-class ISR fields in
hydrocarbon basins in Kazakhstan,
Wyoming and Texas.
• Several potential uranium sources including
weathering / leaching of underlying ‘hot’
granite suite or distal migration of uranium
bearing fluids toward basin depo-centres.
• EM results and analysis of publicly available
2D and 3D seismic data indicate potential
presence of paleochannel systems.
• Initial drill program May 2024 for first
stratigraphic testing and confirmation
Depth to basement map across Big Lake
tenure (blue – green shows deepening
towards centre of Cooper Basin in the NE)
21 Alligator Corporate Presentation | May 2024 | ASX:AGE
Big Lake Uranium Project, SA: Status of Testing Conceptual Exploration Model
Requirements
AGE interpretation
Source
rock
Granite Suite present on
edge of Cooper Basin
Permeable
sedimentary
sequences
Targeting Eyre and
Namba Formations
Hydrocarbon
reductants
Cooper Basin known oil and gas field
Status
(Kaza, Wyoming, Texas)
Migration
of uranium
bearing fluids
Seismic interpretation
of paleochannels
To be drill-tested May 2024
Presence
of uranium
observed
TC Development /
Oil and Gas Operators
U occurrences 'sniffs' noted to date
22 Alligator Corporate Presentation | May 2024 | ASX:AGE
Big Lake Uranium Project, SA
2023 Outcomes
• Interpretation of seismic and other datasets completed,
continuing work towards a full 3D basin model.
• Selection of ~20 stratigraphic drill sites to test stratigraphy,
paleochannel model and qualities of U-trap rocks.
Channel pathways interpreted from EM data
Possible areas targeted for drilling
• Exploration access agreement in place with the Traditional
Owners. Clearances for planned 2024 drilling completed.
• Evaluation of potential across holding to host battery
metals such as Li in condensates.
2024 Work Program
• Maiden drilling stratigraphic program kicks off in May/June
with fences of aircore holes with average depth of 150m.
10km
• Based on the results of the above, 2nd round of
clearances in August.
• Proposal for up to 40 holes to start testing specific
features and uranium traps in either late H2 of 2024 or
early 2025.
23 Alligator Corporate Presentation | May 2024 | ASX:AGE
One of the target concepts for second round of drilling once
key components of the U model confirmed, H1 2024.
Investment into EnviroCopper Ltd ISR copper, SA
• Alligator expanded energy minerals interests with $0.9M strategic investment
in private group, Envirocopper (ECL), with option up to 50.1%.
• This investment and resultant collaboration is extremely complimentary to
our existing and substantial in-house ISR expertise.
• Provides exposure to In-Situ Recovery (‘ISR’) copper project portfolio (over
200kt Cu resource) and experienced ISR and research team.
• Advancing ISR trials at Kapunda copper project - similar plans for Alford
West copper project. BHP funding field trials at Kapunda for IP access.
• ISR successfully used to extract copper in projects in Australia and the US offers distinct advantages and environmental benefits.
• ECL has undertaken significant exploration, R&D and approvals for test work
into ISR of shallow fractured rock aquifer hosted oxide copper deposits.
24 Alligator Corporate Presentation | May 2024 | ASX:AGE
2024 News flow
Recent / Imminent Releases
• First round extension drilling at Blackbush (Samphire)
• Ground Gravity Program – extending current
paleochannel system
Second Quarter
• Inaugural Big Lake (BLU) Drilling Program
• Samphire Retention Lease Approval
• Second round extension drilling at Blackbush
Third Quarter
• Commence FRT construction (subject to approvals)
• Results of the BLU drilling program and next steps
• Initiation of Nabarlek North 2024 Field Program
2025
Fourth Quarter
• Commencement of FRT field circulation trial
• Nabarlek North drilling results
• Blackbush JORC resource estimate update
• Feasibility scope and early work packages
• Award, commencement and undertaking of Feasibility Study
• Mining lease approval documentation and submission late year
• Uranium marketing plan and potential initial conditional sales offtake agreements
25 Alligator Corporate Presentation | May 2024 | ASX:AGE
ESG in practice: Working with Stakeholders
• We aim to add value in all of our decision-making for shareholders.
Shareholders
• We wish to provide an engaging, challenging, enjoyable and
respectful workplace for our employees.
• We respect the rights of landowners and communities and seek to
Team
Communities
collaborate for our mutual benefit.
Stakeholder
Perspective
• We respect the cultural heritage and connection to country of
Traditional Owners and wish to create mutually beneficial
opportunities.
• We aim for a low impact on the environment, through innovation, use
of latest technology, and responsible land management techniques.
Focus on
Environment
Landowners
Traditional
Owners
Our aim is to discover, source and economically extract these needed commodities with an innovative approach,
with either zero or minimal impact, and with positive value and experience for our stakeholders and communities.
26 Alligator Corporate Presentation | May 2024 | ASX:AGE
ESG in Practice
Samphire Project
• Completed remaining historical rehabilitation during project acquisition
• Ongoing drill hole rehab – targeting lifting of bush density to double the existing
• Early and ongoing engagement with pastoralists, Indigenous group, Whyalla community
• Working with pastoralists for weed and pest control, and with rangeland improvement
initiatives
• Early initiatives for low impact site facilities, sustainable energy opportunity
Alligator Rivers
• Over 40 indigenous employees on drilling and exploration programs over 10 years
• On country work and support for indigenous ranger groups – even when not exploring
• Nabarlek North agreement – potential for TO groups to become 25% partner
• Drilling at Nabarlek North in 2022/23– Indigenous owned and operated drilling company
• Exploration rehabilitation after each program
Big Lake Uranium
• Full draft agreement with YYTLOAC indigenous group
• Engagement and cultural clearance programs
• Direct indigenous employment from first program in 2024
Alligator Corporate Presentation | May 2024 | ASX:AGE
Samphire Uranium Project: Opportunity for a near carbon-free energy project
• Lower power consumption as ISR method has no rock / material
movement, nor crushing / grinding of rock. Renewable power with
backup may be adequate?
• Distance to Whyalla may allow all electric vehicles, light trucks,
cranes etc to be used?
• Advances in battery on-highway prime movers may support the level
of logistics and product transport needed?
• This potential opportunity aligns with SA Government Hydrogen Hub
for Whyalla region and extensive potential renewable projects.
• We will be scoping this opportunity in parallel with our feasibility and
economic studies.
28 Alligator Corporate Presentation | May 2024 | ASX:AGE
ASX:AGE
Greg Hall CEO
+61 (0) 7 3839 3904
gh@alligatorenergy.com.au
www.alligatorenergy.com.au
Share your feedback