Unveiling the Samphire Growth Strategy
InvestorPresentation
August2026
2
Investor Presentation | ASX:AGE | alligatorenergy.com.au
Disclaimers
This presentation contains summary information about Alligator Energy Limited (Alligator, AGE, or the Company) and its subsidiaries (the Group), and their activities current only at the date of this
presentation. This presentation is for information purposes only. The information in the presentation is of a general nature only and does not purport to be complete. This presentation should be
read in conjunction with Alligator’s most recent financial report and other periodic and continuous disclosure announcements lodged with the Australian Securities Exchange (ASX) which are
available at www.asx.com.au and available on Alligator’s website at www.alligatorenergy.com.au.
No investment or financial product advice
The information contained in this presentation does not constitute investment advice or financial product advice (nor taxation or legal advice) and is not intended to be used as the basis for making
an investment decision or as a recommendation to acquire securities in Alligator. The information contained in this presentation should not be relied upon as a recommendation or forecast by
Alligator (including as to the performance of Alligator or its share price). Readers should obtain their own professional advice and carry out their own independent investigations and assessment
of the information in this presentation (including any assumptions) before acting.
This presentation has been prepared without taking into account any particular person’s objectives, financial situation or needs; does not purport to identify the nature of specific market or other
associated risks with any investment in the Company and does not constitute any legal, taxation, investment or accounting advice. An investment in Alligator's securities is subject to investment
and other risks, known and unknown, some of which are beyond the control of Alligator, including loss of income and principal invested. The Company does not guarantee any particular rate of
return or the performance of the Company, nor does it guarantee any particular tax treatment. Any investment decision should be based only on a person's own due diligence, inquiry, assessment
and professional advice.
Not an offer
This presentation is for information purposes and is not, and does not purport to be, a prospectus, product disclosure statement or any other offering document under Australian law or the law of
any other jurisdiction. The information does not and will not constitute or form part of an offer, invitation, solicitation or recommendation in relation to the subscription, purchase or sale of securities
in any jurisdiction. The distribution of this presentation in jurisdictions outside Australia may be restricted by law and you should observe any such restrictions.
No warranty
While care has been taken in preparing the information in this presentation, no representation or warranty, express or implied, is made as to the currency, accuracy, reliability, completeness or
fairness of the information, opinions and conclusions contained in this presentation. The information in this presentation has been obtained from or based on sources believed by Alligator to be
reliable. This includes references to test results and reports completed by external parties.
Information in this presentation which is attributed to, or derived from, a third-party source has not been independently checked or verified by Alligator . No representation or warranty is made as
to the accuracy, completeness or reliability of such information.
To the maximum extent permitted by law, neither Alligator nor its related corporations, Directors, officers, employees, advisers or agents, nor any other person, accepts any liability, including,
without limitation, any liability arising from the use of this presentation or its contents or otherwise arising in connection with them, nor guarantees or makes any representations or warranties,
express or implied, as to or takes responsibility for, the currency, accuracy, reliability, completeness or fairness of this presentation nor the information, opinions and conclusions contained in this
presentation.
3
Investor Presentation | ASX:AGE | alligatorenergy.com.au
Disclaimers
Forward Looking Statements
This presentation contains or may contain certain forward-looking statements and comments about future events, that are based on Alligator’s beliefs, assumptions and expectations and on
information currently available to management as at the date of this presentation.
Often, but not always, forward-looking statements can generally be identified by the use of forward-looking words such as "may", "will", "expect", "plan", "believes", "estimate", "anticipate",
"outlook", and "guidance", or similar expressions, and may include, without limitation, statements regarding plans, strategies and objectives of management, anticipated production and production
potential, financial forecasts, product quality estimates of future Mineral Resources and Ore Reserves.
Such statements are only expectations or beliefs and are subject to inherent risks and uncertainties which could cause actual values, results or performance achievements to differ materially from
those expressed or implied in this presentation. Where Alligator expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith
and on a reasonable basis. No representation or warranty, express or implied, is made by Alligator that the matters stated in this presentation will in fact be achieved or prove to be correct. Except
as required by law, Alligator undertakes no obligation to provide any additional or updated information or update any forward-looking statements, whether as a result of new information, future
events, results or otherwise.
Readers are cautioned against placing undue reliance on forward-looking statements. These forward-looking statements are not guarantees of future performance and involve known and
unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the control of Alligator, the directors, and management of Alligator. These factors include, but are
not limited to difficulties in forecasting expected production quantities, the potential that any of Alligator's projects may experience technical, geological, metallurgical and mechanical problems,
changes in market prices and other risks not anticipated by Alligator, changes in exchange rate assumptions, changes in product pricing assumptions, major changes in mine plans and/or
resources, changes in equipment life or capability, emergence of previously underestimated technical challenges, increased costs, and demand for production inputs. Further risk factors are set
out in Appendix 5.
4
Investor Presentation | ASX:AGE | alligatorenergy.com.au
Corporate Overview
4.44B
Ordinary Shares
A$235.2M
Market Cap
(@ 3 Aug 2026)
358.7M A$12.9M
A$0.053
Share Price
(@ 3 Aug 2026)
Listed and
Unlisted Options
Cash
(@ 30 Jun 26)
Institutions
29%
Directors &
Executives
1%
Retail & HNW
70%
Shareholders1
ADELAIDE
SYDNEY
SA, AUSTRALIA
Samphire U
(near Whyalla)
30Mlbs U3O8
2
SA, AUSTRALIA
Big Lake
(Cooper Basin)
ISR Style Uranium
(1) As at 30 Jun 26
(2) Both indicated and inferred - AGE ASX Release 19 Jun 26 - Samphire Resource Increases By 67%
SOUTH
AUSTRALIA
(SA)
5
Investor Presentation | ASX:AGE | alligatorenergy.com.au
Board of Directors
Alligator’s directors have deep uranium and natural resources development expertise
Paul Dickson
Non-Executive Chairman
Finance and corporate advisory
professional with 30+ years in
financial services. Founding Director
of Paradigm Capital, advising junior
and mid-tier ASX-listed companies.
Gregory Hall
Non-Executive Director
Mining engineer with 40+ years across
uranium, copper and nickel. Including
17 years as CEO/ED of three ASX
listed companies. Has 33 years of
uranium experience across
WMC/Olympic Dam, Rio Tinto/ERA.
Fiona Nicholls
Non-Executive Director
Sustainability specialist with more
than 30 years of resources industry
experience. 19 years at Rio Tinto in
senior sustainability and external
relations roles principally in Rio Tinto
Energy, which included Rio Tinto’s
uranium assets.
Daniel Lougher
Non-Executive Director
Resources executive with 40+ years
across exploration, feasibility, project
development, operations and
corporate leadership, including a long
tenure as a Managing Director.
Dr Andrea Marsland-Smith
CEO & Managing Director
PhD-qualified Economic Geologist
with 30+ years experience with
uranium. Close to 20 years with
Heathgate Resources, including
discovery to production of the Four
Mile uranium mine.
6
Investor Presentation | ASX:AGE | alligatorenergy.com.au
Leadership Team
A leadership team with 65 years of uranium exploration, evaluation, development and production experience
Dr Andrea Marsland-Smith
CEO & Managing Director
Appointed CEO after serving as COO.
Further details on previous slide.
Blayney Morgan
Interim Chief Financial Officer
Energy and Resources specialist with
experience auditing the accounting of
uranium companies going from
evaluation to production. 17 years of
experience as a statutory financial
auditor with BDO, Deloitte and SW.
David Brink
General Manager – Operations
David has 30+ years of international
leadership in upstream oil & gas
including Maersk and Total with
expertise in technology, safety and
operations.
Christian Knott
General Manager – Approvals &
Sustainability
Christian has 15+ years in
environmental compliance,
sustainability leadership and regulatory
approvals. Was Senior Environmental
advisor at Heathgate Resources.
Jeffrey Sterlson
General Manager – Govt Relations,
Comms & Public Affairs
Senior leader in stakeholder
engagement, strategic communications
and government relations across
complex regulatory and community
environments.
Nick Jervis-Bardy
Geoscience Lead
Geoscience professional with broad
experience across geophysics,
subsurface data analysis and resource
characterisation in ISR mining and
energy. Was at Heathgate Resources
as Project Geophysicist.
7
Investor Presentation | ASX:AGE | alligatorenergy.com.au
Delivering Australia’s Next Uranium Mine and Beyond
Pathway to production and growing the business
• Dec 23: Scoping study highlights robust
economics
• Aug 25: Approval to conduct a Field
Recovery Trial (FRT)
• Mar 26: Pilot plant constructed on time
and under budget and operational
• Jun 26:
─ FRT completed; results met or exceeded
expectations. Technical and economic project
derisking
─ Resource upgrade by 67% from 18 Mlbs to 30
Mlbs with inclusion of Plumbush
─ Secured option to purchase Crown Lease
containing future project extensions
• Results from FRT - inputs for the
Feasibility Study (FS) and Mining
Lease Application now underway
• Jul-Nov 26: Accelerated drilling
program:
─ Increase Mineral Resource Estimate
(MRE) for FS
─ Delineate southern extensions of
Blackbush
─ Convert portions of Plumbush Inferred
MRE to Indicated
• Post 2026: ongoing exploration of
region outside of Blackbush-
Plumbush corridor
• Targeting production in 2030/2031
• Continue drilling to grow the MRE
• Mid 2027: FS Delivery
• End 2027/early 2028: Offtake and
Project Financing milestones
• Construction 2029/30: subject to
approval of Mining Lease, and Final
Investment Decision (FID)
• Continue to explore and assess
potential large basin play at Big
Lake
• Utilise highly experienced In-Situ
Recovery (ISR) team to assess
logical opportunities to grow
Recent Key Milestones Next Steps Production & Growth
8
Investor Presentation | ASX:AGE | alligatorenergy.com.au
Samphire Uranium Project: Whyalla, South Australia
Excellent Location Decreases Risks
Samphire is in an excellent location in South Australia
• Samphire is located 20 km from Whyalla, South Australia, population c.
21,000.
• State and local Government have expressed strong support for the project
given the region’s economic challenges following the steelworks
receivership and sale process.
• Whyalla has excellent regional infrastructure including local engineering
and service providers.
• Reagents, such as sulphuric acid and other supplies are locally sourced
means lower risks to supply.
South Australia is a supportive jurisdiction for uranium
• Four uranium ISR mines permitted/operating in South Australia.
• More than 50% of worldwide uranium production is from ISR.
• Including the hard rock Olympic Dam mine, South Australia is host to 28%
of worldwide uranium production.
9
Investor Presentation | ASX:AGE | alligatorenergy.com.au
Samphire: Field Recovery Trial (FRT) – Completed 30 June 2026
Excellent results from the FRT – key derisking event toward commercial ISR production
FRT Well Pattern
FRT Pilot Plant
Pattern 1:
• Representative of the orebody targeted for initial development
• Met or exceeded all industry benchmarks and AGE’s scoping study & forecast
• Revenue:
─ Industry benchmark of 70% uranium recovery over 70 pore volumes achieved
─ Grade (115 ppm U3O8) and flow (up to 5 litres per second) above peer average
• Cost:
─ Reagent consumption aligns with the favourable category of the international ISR
standard and is supplied locally
─ Higher flow rate - optimisation opportunity (fewer wells, lower cost, same annual
production rate)
Pattern 2:
• Orebody margin (lower grade/flow) not included in Scoping or FS MRE
• Performed in line with forecasts and confirmed commerciality to mine lower
grade/flow if pricing supports mining these ore bodies
10
Investor Presentation | ASX:AGE | alligatorenergy.com.au
10
• The wellfield is the value driver of an ISR project.
• Drill spacing is critical:
─ Indicated Resources delineated on 25m drill hole spacing
─ This is closer spacing than the planned wellfield spacing of ~30-35m
─ Allows detailed understanding of orebody continuity to ensure reliable recoveries
Samphire: Focus on Continual Derisking
Integrating a total 65 years of ISR operating experience into the planning phase
• Permeability including flowrate variances tested through FRT.
• Experienced ISR project delivery team – FRT results reflect the team’s
prior ISR trial experience.
• Management sets deliverable expectations based on tested parameters.
11
Investor Presentation | ASX:AGE | alligatorenergy.com.au
Samphire: Resource Growth to Increase Mining Inventory
Significant upside to increase mining inventory from multiple areas
Current Indicated and Inferred Resources
Blackbush Mineral Resource Estimate of 18 Mlbs U3O8 supports startup mining operation with
staged expansion, additional Plumbush Mineral Resource Estimate of 12 Mlbs U3O8
(1)
(1) Refer Appendix 1 for details on Indicated and Inferred Resources and underlying ASX announcement
(2) AGE ASX Release 7 Dec 2023 – Significant Exploration Target Range established, Samphire Uranium Project, South Australia,
https://alligatorenergy.com.au/announcements/5456269
(3) AGE ASX Release 28 July 2026 – Drilling Extends Uranium Mineralisation South of Blackbush.https://alligatorenergy.com.au/announcements/7653188
Project Total = 30 Mlbs U3O8 (Indicated and Inferred)
• Lower end of Exploration Target Range(2) (14-75 Mlbs U3O8 @ 390-903 ppm eU3O8) realised
from only a small portion of the known mineralised area
Security of tenure allows increased drilling to grow resource base
• Binding call option over the Mullaquana Crown Lease (MCL) secures tenure and access
across the Exploration Areas
• MCL transaction unlocks the potential to increase the MRE further by targeting:
- Southern strike extensions of Blackbush
- Infill drilling at Plumbush Inferred→Indicated conversion, and
- Test the underexplored Blackbush-Plumbush corridor
• Plans to drill c. 300 drill holes in these areas by end November 2027.
• Recently announced(3) drilling has extended uranium mineralisation 600m south of
Blackbush in the early stages of this program. Grades are similar to Blackbush.
Mullaquana Crown
Lease
Moonabie
Crown Lease
Alligator advises that the potential quantity and grade is conceptual in nature, there has been insufficient exploration to estimate a
Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource
12
Investor Presentation | ASX:AGE | alligatorenergy.com.au
12
Study metrics* at US$75/lb long-term price (now c. US$94/lb)
Production 1.2Mlbs per annum for an MRE of 18Mlbs U3O8 (MRE recently upgraded to 30Mlbs U3O8
(2))
There is scope to grow the resource base
Samphire: Project Economics - Scoping Study (Dec 2023)
Strong economics as outlined in the updated scoping study(1) underpin current valuations
A$131M
CAPEX
(including contingency)
AISC
(A$47.58/lb)
US$33.31/lb
IRR*
(post-tax, real,
ungeared)
42%
Payback
2.45 years
Cash Costs
(A$22.94/lb)
US$16.06/lb
A$257M
NPV8*
(post-tax, real,
ungeared)
(1) ASX release 14 Dec 2023 - Scoping Study Update, https://alligatorenergy.com.au/announcements/5470423, Alligator confirms that all material assumptions underpinning the ‘production target’ or the forecast financial
information derived from the production target’ continue to apply and have not materially changed other than the outlook for the long-term uranium price as set out above.
(2) Refer Appendix 1 for details on Indicated and Inferred Resources and underlying ASX announcement
* Calculated using 0.70 US/A$ exchange rate inclusion of significant contingencies and inflation of 3.5%.
12
Investor Presentation | ASX:AGE | alligatorenergy.com.au
13
13
• Geologically analogous to large ISR fields associated with hydrocarbon
basins such as Kazakhstan, Wyoming, and Texas. These basins host
50-200+Mlbs U3O8 target deposit size.
• Same host sands as Beverley-Four Mile and Honeymoon
• AGE's maiden drilling program successfully validated its exploration
model, delivering thick uranium intersections and demonstrating the
potential for a significant new uranium district in a previously untested
province, intercepts include (1) :
- AC24-021 20m @ 110 ppm U from 106m
- AC24-022 35m @ 117 ppm U from 93m
- AC24-023 5m @ 47 ppm U from 104m
- AC24-025 10m @ 138 ppm U from 108m
• Awarded Australian Mining Prospect Discovery of the Year in 2025
• Drilling program commenced and ongoing(2)
Refer ASX Announcements: 23 Oct 24 – BLU Uranium Discovery, and 27 Feb 25 – Follow Up drilling at BLU
Big Lake Project
Potential to unlock a new uranium province
(1) AGE ASX Release 13 Aug 2024 – Significant New Uranium Discovery – Big Lake Uranium Project, https://alligatorenergy.com.au/announcements/6478394
(2) AGE ASX Release 11 Jun 2026 – Drilling Program Commences at Big Lake, https://alligatorenergy.com.au/announcements/7578774
14
Investor Presentation | ASX:AGE | alligatorenergy.com.au
Upcoming Plans and Targets
Numerous upcoming news flow and milestones
FRT
Q3 Q4 Q1 Q2 Q3
CY 2026 CY 2027
Updated MRE
Samphire FS
Mining Lease
Approvals
Q4 Q1 Q2 Q3 Q4
CY 2028
Blackbush and
Plumbush Drilling (1)
Big Lake Drilling*
COMPLETED Q2 CY2026
Big Lake Exploration
Target
(1) Subject to drilling conditions Alligator aims to release drill result announcements every 6-10 weeks while the drilling programs are ongoing
15
Investor Presentation | ASX:AGE | alligatorenergy.com.au
Investment Highlights
Significant Tenure Secured
in a Tier 1 Jurisdiction
Binding call option over the
Mullaquana Crown Lease unlocks the
Plumbush deposit and southern
Blackbush extensions for drilling.
Large position in the Cooper Basin
Robust Economics
Scoping study economics
underpinned at US$75/lb long-term,
versus current c. US$94/lb
Resource Base Upside
Resource up 67% to 30 Mlbs
Lower end of ETR realised with
significant potential for further
expansion
Field Recovery Trial De-
Risking deposit recovery
70% uranium recovery over 70 pore
volumes validates the low-cost ISR
development case
Accelerated Drilling
Campaign
Proven Team
A leadership and operational team
with deep uranium and ISR
experience that de-risks project
delivery and execution
Australia’s next uranium producer with multiple near-term share price rerating catalysts
Accelerated drilling campaign
underway to further increase
mining inventory for increased mine
life beyond 12 years, improved free
cash flow and NPV
16
Investor Presentation | ASX:AGE | alligatorenergy.com.au
Appendix 1: Samphire Mineral Resource Estimate1
Tonnage (Mt)
Grade
(U3O8 ppm)
U3O8 metal
(Mlb)
Blackbush(2)
Indicated 8.2 786 14.2
Inferred 3.9 443 3.8
Plumbush(3)
Inferred 14.9 370 12.0
Total 30.0
(1) AGE ASX Release 19 Jun 2026 – Samphire Resource Increases By 67% https://alligatorenergy.com.au/announcements/7591585
(2) Refer Appendix 2 for details on Blackbush Indicated and Inferred Resources
(3) Refer Appendix 3 for details on Plumbush Indicated and Inferred Resources
Refer to Appendix 4 for Competent Persons Statements
17
Investor Presentation | ASX:AGE | alligatorenergy.com.au
Appendix 2: Blackbush Mineral Resource Estimate(1)
JORC Category Mt
Grade
(U3O8 ppm)
U3O8 Metal
(Mlbs)
Indicated 8.2 786 14.2
Inferred 3.9 443 3.8
Total 12.1 676 18.0
The model is reported unconstrained and above a 250 ppm U3O8 lower cut-off grade for all zones in consideration of potential for recovery by in
situ leach processes.
There is no historical depletion by production within the model area.
Estimation of the disequilibrium factored and topcut gamma data (feU3O8c) is by ordinary kriging using dynamic anisotropy for the mineralised
zone.
Density is estimated by nearest neighbour estimation within the Kanaka Beds on the basis of logged geology as either 1.79 t/m3 for lignitic material
or 1.92 t/m3 for other sediments; other paleochannel stratigraphies had a default of 1.90 t/m3 assigned; saprolite capping the basement granite
was assigned a bulk density of 2.16 t/m3 and the primary basement granite was assigned a nominal bulk density of 2.70 t/m3.
The model assumes agglomeration of 12.5mE x 12.5mN x 1mRL parent blocks for definition of well fields for production.
The model does not account for dilution, ore loss, hydrogeology, or recovery issues. These parameters should be considered during the mining
study as being dependent on the ISL treatment process.
Classification is according to JORC Code Mineral Resource categories.
Totals may vary due to rounded figures.
(1) AGE ASX Release 19 Jun 26 – Samphire Resource Increases By 67% https://alligatorenergy.com.au/announcements/7591585
Refer to Appendix 4 for Competent Persons Statements
18
Investor Presentation | ASX:AGE | alligatorenergy.com.au
Appendix 3: Plumbush Mineral Resource Estimate1
(1) AGE ASX Release 19 Jun 26 – Samphire Resource Increases By 67% https://alligatorenergy.com.au/announcements/7591585
Refer to Appendix 4 for Competent Persons’ Statements
JORC category
Volume
(Mm³)
Density
(kg/m³)
Tonnage
(Mt)
Grade
(U3O8 ppm)
U3O8 metal
(Mlb)
Inferred – Total 7.9 1,873 14.9 370 12.0
1. The Mineral Resource is reported in accordance with the JORC Code (2012 Edition).
2. The Competent Person for the MRE is Oliver Willetts (MAusIMM 312940), a full-time employee of SRK Consulting (Australasia) Pty Ltd.
3. Mineral Resources are reported at a grade-thickness (GT) cut-off of GT ≥ 400 ppm.m (applied within each reporting domain group) and a grade cut-
off of eU₃O₈ ≥ 140 ppm.
4. Grades are reported as equivalent uranium oxide (eU₃O₈) derived from calibrated downhole gamma logging. Secular equilibrium between ²³⁸U and its
daughter products is assumed.
5. Bulk density is assigned by sequential indicator simulation (SIS) estimated facies, using values adopted from the Blackbush MRE for sand, lignite and
saprolite (ASX 6 May 2025 - https://wcsecure.weblink.com.au/pdf/AGE/02943740.pdf) - and assumed values for clay/silt and carbonate (see JORC
Table 1 Section 3, Bulk density). No site-specific density measurements are available.
6. The resource is constrained to ISR-amenable facies (sand, silt, lignite) using an acidic lixiviant; clay and carbonate blocks are excluded.
7. The resource is classified entirely as Inferred. No Indicated or Measured Mineral Resources have been defined.
8. Mineral Resources are not Ore Reserves and do not have demonstrated economic viability. There is no certainty that further exploration, feasibility
studies, or development will result in the conversion of Mineral Resources to Ore Reserves.
9. Rounding may cause apparent differences in summation.
10. The effective date of the Mineral Resource estimate is 19 June 2026.
19
Investor Presentation | ASX:AGE | alligatorenergy.com.au
Appendix 4: Competent Persons’Statements
The information in this announcement that relates to the Blackbush Mineral Resource estimate (uranium) is based on and fairly represents information compiled by and generated by Mr Ingvar
Kirchner, AMC Geology Manager (Perth) and a full-time employee of AMC Consultants. Mr Kirchner is a Fellow of the Australasian Institute of Mining and Metallurgy (the AusIMM) and a Member
of the Australian Institute of Geoscientists (the AIG). Mr Kirchner has reviewed this Report and consents to the inclusion, form and context relevant information herein as derived from the AMC
Consultants Samphire Mineral Resource estimate. Mr Kirchner has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which is
being undertaken to qualify as a Competent Person as defined by the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC
Code).
The information in this report that relates to Mineral Resources at Plumbush is based on information compiled by Oliver Willetts, MAusIMM (CP – Geology) 312940, a Competent Person who is a
Member of AusIMM. Mr Willetts is a full-time employee of SRK Consulting (Australasia) Pty Ltd. Mr Willetts has sufficient experience that is relevant to the style of mineralisation and type of
deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the JORC Code. Mr Willetts consents to the inclusion in the report of the matters
based on his information in the form and context in which it appears.
The information in this announcement that relates to Exploration Data, Exploration Results related to the projects is based on and fairly represents information provided by Nick Jervis-Bardy
MAusIMM 3088924. Nick Jervis-Bardy is employed on a full-time basis with Alligator as Geoscience Lead and has sufficient experience which is relevant to the style of mineralisation and type of
deposit under consideration (including 5 years in ISR uranium mining operations and technical work) and to the activity he is undertaking to qualify as a Competent Person as defined in the JORC
Code. Mr Jervis-Bardy consents to the inclusion in this release of the matters based on his information in the form and context in which it appears.
In relation to Exploration Results, Mineral Resource Estimates and Exploration Target in the ASX announcements referenced in the presentation, the Company confirms that it is not aware of any
new information or data that materially affects the information included in the original market announcement and that all material assumptions and technical parameters underpinning the
estimates in the relevant market announcement continue to apply and have not materially changed. In relation to production targets, the Company confirms that all material assumptions
underpinning the production target, and the forecast financial information derived from the production target, in the initial announcement continue to apply and have not materially changed.
20
Investor Presentation | ASX:AGE | alligatorenergy.com.au
Appendix 5: Key Risks
Summary of Key Risks
This risks section describes some of the potential risks associated with an investment in the Company. Any investment in the Company is subject to risk factors specific to the Company and its
business activities and those of a general nature including general risks associated with investing in the Company’s securities. Any or a combination of these risk factors may have a material
adverse effect on the Company’s business, financial condition, development, operating and financial performance, growth, and or the value of its securities. There can be no guarantee that the
Company will achieve its stated objectives.
This summary of key risks does not list every risk faced by the Company or that may be associated with an investment in the Company’s securities, now or in the future. Additional risks, including
those that the Company, the Directors and Management are currently unaware of, have the potential to have a material adverse effect upon the Company’s business, financial condition,
development, operating and financial performance, growth, and or the value of its securities. This summary of key risks should be considered in the context of previous disclosures made by the
Company in accordance with its periodic and continuous disclosure obligations.
While some of the identified risks can be mitigated by the use of safeguards and appropriate systems and actions, many of these are outside the control of the Company, its Directors and its
management.
Before deciding whether to invest in the Company, you should read the entire document carefully in conjunction with the Company's other periodic reports and continuous disclosure
announcements to ASX available at www.asx.com.au or www.alligatorenergy.com.au and satisfy yourself that you have a sufficient understanding of the actual and potential risks associated with
an investment in the Company. You should consider whether securities in the Company are a suitable investment for you having regard to your own investment objectives, financial circumstances
and particular needs (including financial and taxation issues). If you do not understand any part of the
Share your feedback
Discover