Successful upgrade of Indicated Mineral Resource for the
Blackbush Deposit, Samphire Uranium Project, South Australia
Highlights
•
•
The Samphire Project 2023 resource infill drilling has been successful in conversion from
Inferred to Indicated JORC Category for the Blackbush Mineral Resource:
-
The Indicated Mineral Resource has further increased by 21% to 12.9Mlbs at an average
grade of 754ppm U3O8 – a 115% increase since commencement of AGE’s resource
drilling at Blackbush in 2022.
-
2.2Mlbs U3O8 were converted to Indicated Resource, with a corresponding drop in Inferred
resource of 2.9Mlbs.
-
74% of the metal in the total MRE is now classified as Indicated.
-
As anticipated, with no significant resource extension drilling the total MRE has reduced
slightly due to additional data and revised interpretation.
The increased confidence in the Indicated Mineral Resource Estimate supports targeting
improved project economics in an updated Scoping Study.
-
•
Allows the Scoping Study update to draw on additional Indicated Resource for the proposed
ISR mining schedule targeting an increased annual production rate.
Finalisation of an updated Samphire Project Scoping Study, including this final key input
assumption, is now on track for release in the coming days.
Walk-up targets identified for resource extension drilling commencing late January 2024 to
advance toward extending the life of mine.
-
Drilling rig secured for year-round drilling in 2024, with all land access and approvals in place
for this work.
•
AGE has identified a pipeline of targets outside the Blackbush MRE envelope which has
been incorporated into an Exploration Target Range, the backbone for its sustained multi year exploration program.
•
In summary, at 250ppm cut-off grade the Blackbush Mineral Resource Estimate now stands at a
Indicated Mineral Resource of 12.9Mlbs at 754ppm and an Inferred Mineral Resource of 4.6Mlbs
at 447ppm, Totalling 17.5Mlbs at 640ppm U3O8 – Refer table page 4.
Greg Hall, Alligator CEO, said: “The detailed work to establish a high quality and larger Indicated
Resource for Samphire allows us to increase the annual uranium production rate in an updated Scoping
Study being finalised now, with ASX release imminent. In conjunction to this, as outlined in our
Exploration Target Range release (ASX: dated 7 Dec 2023) everything is now in place to commence
drilling in January 24 to target enlarging and extending the overall Total Resource base for the Samphire
Project further.”
Alligator Energy (ASX: AGE, ‘Alligator’ or ‘the Company’) is pleased to announce an updated
Mineral Resource Estimate (MRE) resulting from AGE’s 2023 resource infill drilling campaign at the
Blackbush Deposit (Figure 1) within Alligator’s Samphire Project, South Australia.
Background
The March 2023 Samphire Scoping Study1 confirmed the potential to develop Blackbush as a globally
competitive low-cost uranium operation using the in-situ recovery (ISR) process and identified an
increase in the Indicated Mineral Resource would provide a solid opportunity to study an increased
Production Target and potential project economics.
Figure 1: Samphire Project Location Map
On 8 June2 and 25 October3 this year AGE announced 2023 infill resource drilling results which were
focussed on converting additional ISR amenable Inferred Mineral Resource to Indicated category at the
palaeochannel hosted Blackbush Deposit. A total of 117 holes for 10,062m were drilled which
successfully converted an additional 2.2MLbs into an Indicated Mineral Resource category, which
increased from 10.7MLbs to 12.9Mlbs at an average grade of 754ppm U3O8. This is a 21% increase
from the previous Indicated MRE4 with no change in cut-off grade which has remained at 250ppm U3O8.
1 AGE ASX Release 14 March 2023 https://wcsecure.weblink.com.au/pdf/AGE/02643151.pdf
2 AGE ASX Release 8 June 2023 02674241.pdf (weblink.com.au)
3 AGE ASX Release 25 October 2023 02729807.pdf (weblink.com.au).
4 AGE ASX Release 2 March 2023; 02639068.pdf (weblink.com.au)
Overall, 74% of the Blackbush Mineral Resource is now classified as Indicated; a notable improvement
from 40% in AGEs initial MRE targeting In-Situ Recovery announced September 20225. In summary at
250ppm cut-off grade the Blackbush resource now stands at Indicated Mineral Resource of 12.9Mlbs
at 754ppm and an Inferred Mineral Resource of 4.6Mlbs at 447ppm, totalling 17.5Mlbs at 640ppm U3O8.
As the 2023 infill drilling was focussed within the previous Blackbush MRE, the Inferred Mineral
Resource, as expected, reduced by 2.9Mlbs (39%).
Targeting mineral resource extension from the limits of the Inferred Mineral Resource envelope is the
first focus for AGE’s 2024 exploration drilling program (Figure 2) among other targets identified in the
recently released Exploration Target Range6 for the Project. Currently 64km of strike length of host
palaeochannel has been mapped with only 10% densely drilled (Blackbush Deposit and small portions
of Plumbush Prospect). A drilling rig has been secured for year-round drilling from late January 2024
with exception of planned breaks around the pastoralists lambing season in May and June.
Figure 2: Updated Inferred resource area outline (blue) and Indicated Resource area outline (red) showing historical and AGE
drillholes focussed within the Inferred Resource envelope. Further resource extension potential shown in arrows and pink
circles.
Blackbush Mineral Resource Estimate Update Summary
This MRE was prepared by AMC Consultants (Perth) using historical UraniumSA Ltd (UraniumSA)
drilling data and AGE rotary-mud/sonic drilling data7 acquired in 2021-2023 within the Blackbush
Deposit. Uranium grades have been determined by a combination of chemical assay, downhole prompt
fission neutron (PFN) and downhole gamma geophysical sonde measurements.
5 AGE ASX Release 1 September 2022 https://wcsecure.weblink.com.au/pdf/AGE/02562683.pdf
6 AGE ASX Release 7 December 2023
7 ASX Releases 31 Jan 2022 02480654.pdf (weblink.com.au) 29 March 2022 02503799.pdf (weblink.com.au); 10 May 2022 02520049.pdf
(weblink.com.au); 6 July 2022 https://wcsecure.weblink.com.au/pdf/AGE/02539224.pdf; 23 November 2022 02601769.pdf (weblink.com.au);
8 June 2023 02674241.pdf (weblink.com.au); 25 October 2023 02729807.pdf (weblink.com.au).
The updated MRE (Table 1) has been reported in accordance with the Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) and reports only that portion
which has been assessed by AGE as amenable to ISR within the Kanaka Beds of the Samphire
Palaeochannel at Blackbush.
Prior to the addition of the 2023 drilling data, total Indicated Resources were 10.7Mlb with the remaining
estimate comprising an Inferred Resources of 7.4Mlb8.
An 11% decrease in average grade of the previously reported global MRE from 720ppm U3O8 to
640ppm U3O8 arose due to a range of factors including the influence of peripheral lower-grade
mineralisation occurring at the reduced margins of the Inferred Mineral Resource envelope, changes to
interpretations resulting from new data and changes to disequilibrium factors applied to some of the
gamma data used.
Table 1: Blackbush Mineral Resource Estimate reported above a 250ppm U3O8 cut-off.
JORC Category
Mt
Grade
(U3O8 ppm)
U3O8 Metal
(Mlbs)
Indicated
7.8
754
12.9
Inferred
4.6
447
4.6
Total
12.4
640
17.5
The model is reported unconstrained and above a 250 ppm U3O8 lower cut-off grade for all zones in
consideration of potential for recovery by in situ leach processes.
Estimation is by ordinary kriging for all mineralised zones.
Density is assigned as 2.05 t/m3 based on limited test work.
The model assumes agglomeration of 12.5mE x 12.5mN x [variable]mRL panels for definition of well fields
for production.
The model does not account for dilution, ore loss or recovery issues. These parameters should be considered
during the mining study as being dependent on the treatment process.
Classification is according to JORC Code Mineral Resource categories.
Totals may vary due to rounded figures
8 ASX Release 2 March 2023. https://wcsecure.weblink.com.au/pdf/AGE/02639068.pdf . Note information was sourced in this
announcement from the “Samphire Mineral Resource Estimate 2 March 2023, AMC Consultants. Competent Persons for the MRE was Mt
Ingvar Kirchner (AMC) and Dr Andrea Marsland-Smith (AGE) for QAQC and geology aspects related to the project.
ASX Additional Technical Information
The following is a summary of the material information used to estimate the Mineral Resources as
required by Listing Rule 5.8.1 and JORC 2012 Reporting Guidelines.
Geology and Mineralisation
The Blackbush Deposit (Blackbush) is located within Exploration License (EL) 5926 (Figure 1). The
geological setting for mineralisation has been interpreted by AGE and AMC based on the historical
UraniumSA drilling and the infill rotary-mud and sonic core drilling programs completed by AGE through
to Q4 2023.
The uranium mineralisation at Blackbush occurs in horizontal tabular lenses (60-85m depth) in sanddominated basal sediments (Eocene Kanaka Beds) within a Tertiary paleochannel system. The
paleochannel is incised into a Proterozoic granite (Samphire Granite) which has a variably weathered
saprolite surface at its contact with the Kanaka Beds. The Kanaka Beds comprise cyclic fluvial quartz
dominated sands and gravels intercalated with silts and clays with fine grained carbonaceous material
towards the top of the sequence. The Kanaka Beds are overlain by the laterally continuous Miocene
Melton Limestone (marl and limestone), the clay dominated Pliocene Gibbon Beds and a cover of
Quaternary sediments (Figure 3).
Figure 3: Cross section 6324300 mN through the Blackbush Deposit (15x vertical exaggeration, depth in RL metres) showing
multi-level zones on simplified geology. Cross section constructed from pU3O8 intersections from AGE sonic core hole
BBRM22-0349 and historic drilling eU3O8 intersections10. Detailed stratigraphic section (modified after USA Internal Report,
2012).
The Blackbush mineralisation is consistent with sandstone-hosted roll-front style uranium mineralisation
occurring in up to 4 sub-horizontal zones11 which are constrained within the upper, middle, and lower
9 Drilling details including JORC Table 1 previously reported by Alligator Energy Ltd (ASX:AGE) in ASX release “Exceptional High-grade
uranium results from Samphire Uranium Project, SA” 29 March 2022. 02503799.pdf (weblink.com.au)
Historic drilling details including JORC Table 1 previously reported by Uranium SA (ASX:USA) in ASX release “Samphire Project Update”
27 September 2013, https://www.asx.com.au/asxpdf/20130927/pdf/42jnqgsn2cqcgg.pdf
10
11 Note: An additional zone below the Kanaka Beds within the saprolite is present but not considered to have “reasonable prospects for
eventual economic extraction”.
lithologies of the Kanaka Beds. The common uranium minerals at Blackbush are uraninite and coffinite,
common for this class of uranium deposit. The cumulative strike length of the deposit is approximately
2.7 km. Width of mineralisation across strike averages ~300m, with widths of up to 450m in some areas
(Figure 4).
The Mineral Resource for Blackbush has been classified as a combination of Indicated and Inferred
material (Table 1) in accordance with JORC Code guidelines and assumes potential extraction by ISR.
It is based on confidence levels of key criteria such as confidence in the geology, interpretations, data
quality, data types (including disequilibrium factored gamma data), drilling density, apparent grade and
spatial continuity of the mineralisation, estimation quality, and stratigraphic position.
Figure 4: Plan view of Blackbush uranium mineralisation extents (coloured area) relative to palaeochannels (dark grey);
image courtesy AMC Consultants.
Drilling Techniques
This MRE was calculated from an updated drillhole database containing UraniumSA drill data acquired
between 2007 to 2012 and data from AGE’s drilling undertaken Q4 2021-Q4 2023 (Figure 5). All
drillholes used in the MRE were vertical and comprise a combination of rotary-mud (640), sonic core
holes (14) and diamond core (6) for a total of 660 holes (53,687m).
Drill spacings are variable throughout the MRE area reflecting the different generations of drilling but
generally conform to drill spacing ranging from 25m, 50m, 100m and 200m. The data set for the
mineralised zones consists of intervals analysed by gamma data (98%), PFN data (32%) and chemical
assay data (2%) with some overlap of both gamma data and PFN data where the PFN data exists. A
similar overlap exists between the PFN data and some of the chemical assay data. Thirty-three (33)
historical Uranium SA holes were twinned in the AGE drilling since 2021 for the purposes of QAQC. All
holes were wireline logged for lithological interpretation and estimation of uranium (U3O8) grade
downhole. Location of hole types is shown in Figure 6.
Figure 5: Plan view of drillhole locations by year drilled relative to Blackbush mineralisation (image courtesy AMC
Consultants).
Figure 6: Plan view of drillhole locations by hole type relative to Blackbush mineralisation (image courtesy AMC
Consultants)
Sampling and Sample Analysis
The principal sampling method to estimate uranium grade in all rotary-mud drillholes was downhole
geophysical logging using standard industry procedures to estimate eU3O8 from gamma sondes12 and
pU3O8 from the Prompt Fission Neutron (PFN) sondes13. Gamma data was collected at variable sample
intervals between 10mm and 100mm, whereas PFN logging data was collected at 10mm sample
intervals. All sondes were calibrated using industry standard procedures at the Australian Mineral
Development Laboratories (AMDEL) calibration facility (Adelaide). There is some overlap of both
gamma data and PFN data where the PFN data exists.
Uranium grade data from both sources was composited to 20 cm intervals to aid in the geological
interpretation and assignment of mineralisation to the respective zones. All sonic drillholes were
sampled by geological boundaries with a maximum sample length of 0.5 m and a minimum interval of
0.1 m. Samples were assayed for a total suite of 61 elements14. A nominal dry bulk density of 2.05 t/m3
was assumed for the Blackbush mineralised zones in line with the previous published MRE15.
Resource Estimation and Methodology
The MRE was based on Ordinary Kriging with restricted search neighbourhood and limited vertical
smoothing. Dynamic anisotropy was used during estimation to consider the variable and complex strike
orientations of the palaeochannel and uranium distribution.
Wireframes of the mineralisation were based on the upper and lower contacts of each individual
mineralisation lens using a nominal lower cut-off value of 250 ppm eU3O8, pU3O8 or cU3O8 (chemical
assay). Four sub-horizontal mineralised zones (labelled Zone Code 100, 200, 300 and 400) were
defined as shown in Figure 7. Note that some uranium metal accumulation occurs below the Kanaka
Beds (i.e., in the saprolite/granitic basement) and is considered not to have “reasonable prospects for
eventual economic extraction” at this stage. It is therefore not reported as part of this MRE and is
categorised as unclassified in the model.
Validated PFN data against chemical assays showed that PFN data is comparable. This allowed
disequilibrium factors (DEF16) in mineralisation to be estimated using 88,012 raw intervals from portions
of 294 drillholes which contained pairs of both natural gamma and PFN grades. Criteria for pair selection
was where PFN data indicated grades greater than 250ppm17 and gamma data indicated grades greater
than 50ppm to avoid potentially spurious low-level readings from the sondes. The data pairs were
modelled using an inverse distance interpolation method and power of 1 into 12.5 mE by 12.5 mN by
12
Downhole gamma sondes measure the daughter isotopes in the radioactive decay series, thus is not a direct reading of uranium in the host
formation if the gamma-emitting daughter isotopes are not in secular equilibrium with the parent 238Uranium. If the parent 238Uranium is in
secular equilibrium with the daughter isotopes the response of the natural gamma is directly proportional to the amount of uranium in the host
formation. Note: Typically for this style of uranium mineralisation, secular disequilibrium is the common situation where the uranium and
various decay daughter products move around significantly and variably over time with changes in water table, oxidation states and water
chemistry.
13 PFN sondes emit pulsed epithermal neutron into the host formation via a neutron generator which interact directly with the uranium isotope
235
U (a small and relatively stable fraction of 238U) via a fission reaction which generate thermal neutrons which is proportional to the amount
of uranium present. Uranium grade is thus derived from the ratio of epithermal and thermal neutrons and borehole size.
14 Assays by XRF - Bureau Veritas Laboratories, Adelaide.
15 AGE ASX Release 2 March 2023 “Mineral Resource Upgrade at Blackbush Deposit”; 02639068.pdf (weblink.com.au)
16 DEF = pU O /eU O
238
Uranium is enriched relative to decay chain daughter isotopes, DEF <1 parent 238Uranium is
3 8
3 8 if DEF>1 parent
depleted relative to decay chain daughter isotopes. The basis for this process is that the gamma sonde measures gamma ray intensity from
the decay chain daughter isotopes, whereas the PFN sonde directly measures the 235U with a pulsed neutron source where the 235U
represents a small but relatively stable proportion of the 238U mineralisation.
17
PFN data (pU3O8) was restricted to pU3O8 values greater than 250 ppm reflecting the lower detection limit of the tool, some uncertainty
about values below 200 ppm, and intervals that defined mineralisation.
2 mRL blocks for each of the individual mineralised zones, with a block disequilibrium factors (DEF)
calculated following estimation.
Estimated DEF’s were assigned to the raw data intervals for the mineralised zone data sets occurring
within the block area and applied only to the gamma data (eU3O8). The disequilibrium model highlighted
some lateral consistency with factors showing variability with mineralised zones consistent with typical
roll front disequilibrium distribution i.e., disequilibrium >1 in the “roll” and disequilibrium <1 in the “tails”
of the front. The combined data types including the factored gamma data are prioritized and combined.
PFN data is prioritized above other data types. The factored gamma data is only used where valid PFN
data does not exist within the Kanaka Beds. Assay data from sonic core is used where no valid PFN
data exists.
Figure 7: Mineral Resource classification, Blackbush west to east section 6,324,300mN (view looking north) showing four
levels18 of sub-horizontal uranium mineralisation. Note: the orientation of the cross-section cuts through generally
perpendicular to the orientation of uranium mineralisation at Blackbush West and parallel (longitudinally) to orientation of
uranium mineralisation at Blackbush East. Vertical exaggeration x10, depth in RL metres (image courtesy of AMC
Consultants).
The prioritized and combined raw data was composited to 1m downhole intervals within the mineralised
zones. High-grade caps of 15,000ppm U3O8 were applied to the data from the mineralised zones. A
three-dimensional directional experimental variogram was generated for the combined mineralised
zones hosted within the Kanaka Beds in well-informed areas of Blackbush West. This general
variogram model was tested and used as representative of the mineralisation through the rest of the
deposit. Relative nugget variance was 45% and anisotropic model ranges up to 100m for the major
axis.
18
Note the lower zone (blue) in Figure 6 is below the Kanaka Beds (below the base of the palaeochannel) and considered not to have
“reasonable prospects for eventual economic extraction” at this stage.
Uranium (U3O8) grade estimation was completed using ordinary kriging into the parent blocks for the
mineralised zones. Sample search parameters for the MRE considered the block size estimation
method, variography and data spacing. It also considers a nominal ISR production wellfield drillhole
spacing approaching 25m by 25m and vertical variability at the scale of the interpreted mineralised
zones. A 12.5mE by 12.5mN by 2mRL search ellipse was used in conjunction with dynamic anisotropy
and a two-pass search strategy with hard boundaries used for all zones. The dynamic anisotropy
process was also used to reorient the variogram models. The constant dry bulk density value of 2.05t/m3
was applied to all mineralisation in the block model.
Relative Changes in Mineral Resource Estimates (March 2023 vs December 2023)
Relative changes in tonnage, grade and metal between this Mineral Resource estimate and the
previous March 2023 Mineral Resource Estimate (AMC, 2023) relate to:
•
Ongoing rotary mud infill drilling by AGE in 2H of 2023 logged with both gamma and PFN tools
has resulted in modified interpretations for mineralised zones and stratigraphy.
•
The PFN data added significant confidence to some areas previously reliant on gamma data.
PFN coverage remains incomplete through the areas within Kanaka Bed mineralisation.
•
Slightly lower grade areas previously classified as Inferred Mineral Resource have been
upgraded to Indicated Mineral Resource.
•
The disequilibrium model improved by using an increased amount of data pairs where
pU3O8>250 and eU3O8>50ppm. This contributed to more detailed changes (both positive and
negative) dependent on lateral location and stratigraphic positions within the paleochannel.
•
Increased drilling in the Blackbush West and East areas improved the classification from
Inferred to Indicated in peripheral areas and the western channel area.
•
A change in classification of drilled areas due to the additional drilling:
- Improved classification of some previously Inferred Mineral Resource to Indicated Mineral
Resource based on improved data, interpretations, and
- There was minor expansion of the lateral limits of the Inferred material in some areas. The
Inferred Mineral Resource was reduced as material was converted to Indicated.
This announcement has been authorised for release by the Alligator Energy Board.
Contacts
For more information, please contact:
Mr Greg Hall
Mr Mike Meintjes
CEO & Managing Director
Company Secretary
gh@alligatorenergy.com.au
mm@alligatorenergy.com.au
For media enquiries, please contact:
Alex Cowie
Media & Investor Relations
alexc@nwrcommunications.com.au
This announcement contains projections and forward-looking information that involve various risks and uncertainties regarding
future events. Such forward-looking information can include without limitation statements based on current expectations
involving a number of risks and uncertainties and are not guarantees of future performance of the Company. These risks and
uncertainties could cause actual results and the Company’s plans and objectives to differ materially from those expressed in
the forward-looking information. Actual results and future events could differ materially from anticipated in such information.
These and all subsequent written and oral forward-looking information are based on estimates and opinions of management
on the dates they are made and expressly qualified in their entirety by this notice. The Company assumes no obligation to
update forward-looking information should circumstances or management’s estimates or opinions change.
Competent Person’s Statement
The information in this announcement that relates to the Blackbush Mineral Resource estimate (uranium) is based on and
fairly represents information compiled by and generated by Mr Ingvar Kirchner, AMC Geology Manager (Perth) and a full-time
employee of AMC Consultants. Mr Kirchner is a Fellow of the Australasian Institute of Mining and Metallurgy (the AusIMM)
and a Member of the Australian Institute of Geoscientists (the AIG). Mr Kirchner has reviewed this Report and consents to the
inclusion, form and context relevant information herein as derived from the AMC Consultants Samphire Mineral Resource
estimate. Mr Kirchner has sufficient experience relevant to the style of mineralisation and type of deposit under consideration
and to the activity which is being undertaken to qualify as a Competent Person as defined by the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code).
The information in this announcement that relates drillhole data, QAQC and geology aspects related to the project is based
on and fairly represents information provided by Dr Andrea Marsland-Smith who is a Member of the AusIMM. Dr MarslandSmith is employed on a full-time basis with Alligator Energy as Chief Operating Officer, and has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration (including 21 years in ISR uranium mining
operations and technical work) and to the activity she is undertaking to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr MarslandSmith consents to the inclusion in this release of the matters based on her information in the form and context in which it
appears.
About Alligator Energy
Alligator Energy Ltd is an Australian, ASX-listed, exploration company focused on uranium and energy related
minerals, principally cobalt-nickel. Alligator’s Directors have significant experience in the exploration, development
and operations of both uranium and nickel projects (both laterites and sulphides).
Projects
JORC Code, 2012 Edition – Table 1 Sections 1, 2 & 3
Section1 – Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
•
AGE Sampling Techniques
•
•
•
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
Aspects of the determination of
mineralisation that are Material to the Public
Report.
In cases where ‘industry standard’ work has
been done this would be relatively simple
(eg ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed
information.
Rotary Mud Drilling
Rotary mud drilling was used to obtain 2m
samples in the non-target area and 1m mud
/chip samples within the target area.
Downhole wireline logging using a Prompt
Fission Neutron (PFN) tool was used to
calculate pU3O8 from the ratio of epithermal and
thermal neutrons. Rotary mud samples are not
suitable for assay for the determination of grade.
The PFN used in this program was calibrated
using industry standard procedures at the
Australian Mineral Development Laboratories
(AMDEL) calibration facility (Adelaide).
Sonic Core Drilling
Drill core was extracted direct from the drill rod
and placed into a 1-metre-long plastic sleave to
contain the core. The sleaved core was then
sealed and placed in 1 metre intervals in core
trays.
Due to the nature of the sonic drilling technique
some redistribution of unconsolidated material
can take place. Adjustment of core downhole
depths and sampling intervals was undertaken
by reconciliation with downhole geophysical
data.
Following collection and prior to sampling trays
of core were transported to a coldroom for
storage at 1.5 oC.
UraniumSA Data Sampling Techniques
Drilling
techniques
•
Drill type (eg core, reverse circulation, openhole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
The work is based on rotary mud drilling and all
grade determinations are from down hole
geophysical logging. Sondes were
appropriately calibrated.
AGE Drilling Techniques
Rotary Mud Drilling
All holes were drilled by Watson Drilling with
typical hole diameter being 6” (152.4mm). All
holes were vertical.
Sonic Core Drilling
All holes were drilled by Star Drilling using sonic
drilling. Hole diameter was 100cm within 150cm
steel cased.
Core was not oriented (vertical).
UraniumSA Drilling Techniques
Holes used were drilled using the rotary mud
drilling technique. Mud was based on saline
formation waters and very successfully
facilitated hole stability and minimised collapse
and wash out – all vertical
Criteria
JORC Code explanation
Commentary
Drill sample
recovery
•
Method of recording and assessing core and
chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Rotary Mud Drilling
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
For AGE holes:
• Caliper data show that borehole size
increases in zones of unconsolidated sands,
hence all pU3O8 grades were calculated and
corrected for borehole size from caliper data
taken every 5cm downhole using the
equation {2.737*({EP