Quarterly Report and Appendix 5B for 30 June 2026
Released
Released
Announcement PDF
QUARTERLY REPORT
FOR THE PERIOD ENDING
31 December 2021
ASX: AGE
30 June 2026
2
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 8 7092 6230
ABN 79 140 575 604 | Level 1, 5-7 King William Road, Unley SA, 5061 | Page 2 of 15
Samphire delivers successful first Field Recovery Trial well pattern and 67% Mineral
Resource growth to 30 Mlbs U₃O₈
Highlights for the Quarter:
• The first of two well patterns (Pattern 1) of the Samphire Field Recovery Trial (FRT) completed, producing
outstanding results1 that compare favourably to industry ISR benchmarks and the assumptions in
Alligator Energy Limited’s (Alligator, ASX: AGE or the Company) Scoping Study2.
o Pattern 1 is representative of the geological and hydrogeological conditions expected across the
areas of the Blackbush deposit targeted for future wellfield development.
o Key technical outcomes included average solution grades of 115 mg/L U₃O₈, peak well flow rates
up to 5 L/s, 98% ion exchange uranium capture and reagent consumption within highly favourable
international benchmarks.
• Maiden 12 Mlbs U₃O₈ Inferred Mineral Resource Estimate (MRE) 3 defined at the Plumbush deposit,
increasing the combined Samphire MRE by 67% from 18 Mlbs to 30 Mlbs U₃O₈.
• Binding call option secured over the Mullaquana Crown Lease, providing access to Plumbush, the southern
extension of Blackbush and the prospective corridor between the deposits.
• Drilling commenced at the Big Lake Uranium Project (Big Lake) in the Lake Eyre Basin, South Australia
after a hiatus due to persistent rain following the initial discovery success in 2024.
• All conditions precedent satisfied under the Asset Sale Agreement for the $7.5 million divestment of
Alligator’s Northern Territory uranium assets to DevEx Resources Limited on 22 June 2026.
MD & CEO Statement
Commenting on the June 2026 quarter, Alligator’s MD and CEO Andrea Marsland-Smith said:
The June quarter marked a period of significant technical and strategic progress for Alligator. Completion of
the first Samphire FRT well pattern achieved the targeted uranium recovery of approximately 70%, while other
key ISR performance metrics were also in line with forecasts. These strong results provide increased
confidence in the Project’s technical assumptions and materially reduce uncertainty around future wellfield
design, production planning and processing requirements.
The maiden 12 Mlbs U₃O₈ Plumbush Mineral Resource has increased Samphire’s combined Mineral Resource
to 30 Mlbs U₃O₈, significantly strengthening the Project’s scale and growth profile. The option over the
strategically important Mullaquana Crown Lease has also unlocked access to drill Plumbush, test the southern
extension of Blackbush and evaluate the highly prospective corridor between the two deposits, providing
multiple opportunities to further expand the Samphire resource base.
We are excited to have resumed drilling at Big Lake for our 2026 drill program. The team has returned to the
Site 10 discovery and will advance a broader pipeline of high-priority exploration targets. The progress
achieved during the quarter reflects the depth of experience and commitment across our team and positions
the Company for a highly active second half of 2026.
1 AGE ASX Release 5 May 2026; Outstanding Results from First Well Test Pattern.
https://alligatorenergy.com.au/announcements/7521138
2 AGE ASX Release 14 December 2023; Scoping Study Update-Samphire uranium Project.
https://alligatorenergy.com.au/announcements/5470423
3 AGE ASX Release, 19 June 2026; Samphire Mineral Resource Grows 67% to
30 Mlbs U₃O₈ Following Addition of Plumbush Inferred Mineral Resource. https://alligatorenergy.com.au/announcements/7591585
3
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 8 7092 6230
ABN 79 140 575 604 | Level 1, 5-7 King William Road, Unley SA, 5061 | Page 3 of 15
Samphire Uranium Project Development
The June 2026 quarter was a significant period for the Samphire Uranium Project, with the first well pattern of
the Field Recovery Trial (FRT) completing its planned recovery cycle and delivering results consistent with,
and in several areas exceeding, the operating assumptions used in Alligator’s December 2023 Updated
Scoping Study.
Uranium recovery from the first test pattern achieved approximately 70% within approximately 70 pore volume
exchanges, meeting the Company’s recovery target within the time allocated for the test. The recovery profile
demonstrated effective lixiviant contact with the mineralised zone and uranium mobilisation under field
conditions.
Pregnant Lixiviant Solution (PLS) from the wellfield achieved a peak concentration of approximately 250 mg/L
U₃O₈ and a sustained average grade of 115 mg/L U₃O₈, marginally above the 110 mg/L assumption used in
the Updated Scoping Study. The extractor well was operated at approximately 2.8 L/s due to the capacity of
the pilot plant; however hydrogeological pump testing pre-operations confirmed the well could sustain flow
rates above 5 L/s.
The chloride-tolerant Ion exchange (IX) resin selected for the FRT performed strongly. For acid ISR uranium
operations, a typical ion-exchange uranium capture efficiency is approximately 95–99%, with the first pattern
achieving 98%. Sulphuric acid consumption was approximately 20 kg per tonne of ore which is within the
"highly favourable" category used in international acid ISR benchmarking4.
Calcium in the PLS exceeded saturation and precipitated as gypsum, resulting in minor scaling within some of
the filters. This was mitigated through periodic filter cleaning and standard process control measures. Ongoing
management of this will be assessed through the Feasibility Study process, including considering strategies
used elsewhere in other operations.
Following completion of the first pattern, the FRT program transitioned to a second well pattern located in the
non-representative (lower flow and grade) margin of the deposit to test the lower end of the operating envelope
and provide data on how a future wellfield may perform under these conditions when economic to do so.
Figure 1: Samphire Field Recovery Trial Plant in full operation (view looking north)
4 IAEA-Tecdoc-1239, Manual of acid in-situ leach uranium mining technology, 2001
4
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 8 7092 6230
ABN 79 140 575 604 | Level 1, 5-7 King William Road, Unley SA, 5061 | Page 4 of 15
Feasibility Study
The Feasibility Study (FS) continued during the quarter, with the FRT data being incorporated into wellfield
design and spacing, recovery modelling, mine scheduling, processing plant design and reagent management.
Using site-specific operating data is expected to improve confidence in the technical and economic
assumptions applied to the proposed development. Completion of the FS is targeted for mid-2027.
Samphire Mineral Resource Growth and Mullaquana Access
During the quarter, Alligator announced a maiden Inferred MRE of 12 Mlbs U₃O₈ at the Plumbush deposit,
located approximately 5 km south of Blackbush. The addition of Plumbush increased the combined Samphire
MRE by 67%, from 18 Mlbs to 30 Mlbs U₃O₈ (Table 1) all of which has been assessed as amenable to in-situ
recovery.
Table 1: Combined Mineral Resource of the Samphire Project
Tonnage
(Mt)
Grade
(U3O8 ppm)
U3O8 metal
(Mlb)
Blackbush5
Indicated 8.2 786 14.2
Inferred 3.9 443 3.8
Plumbush
Inferred 14.9 370 12.0
Total 30.0
The Plumbush MRE now comprises 14.9 Mt at an average grade of 370 ppm U₃O₈ for 12.0 Mlbs U₃O₈. It was
prepared by SRK Consulting (Australasia) Pty Ltd using historical drilling completed between 2009 and 2011
and has been classified entirely as Inferred under the JORC Code (2012 Edition). The estimate provides further
support for the previously reported 14 to 75 Mlbs U₃O₈ Samphire Exploration Target Range6.
Alligator executed a binding call option to acquire the Mullaquana Crown Lease, which hosts the Plumbush
deposit, covers the interpreted southern extension of Blackbush, and holds further greenfield exploration
potential. The staged structure provides immediate access rights for exploration and technical assessment for
18 months following the option payment, while deferring the larger acquisition commitment. The initial
$500,000 option payment was paid on 3 July 2026, with a further $6.75 million payable only if the option is
exercised.
An intensive multi-rig drilling program is planned for the remainder of 2026 marking the first exploration
activities on the Mullaquana area since 2011. The drilling program of c. 300 drill holes represents the next
phase of resource growth at the Samphire Project following the recent inclusion of the Plumbush deposit MRE.
This initial program is designed to drill the southern extensions of Blackbush, infill drill at Plumbush to
commence upgrading the Inferred MRE this year to Indicated and test the continuity of mineralisation in the
Blackbush and Plumbush corridor (Figure 2).
5 Refer ASX announcement of 6 May 2025; Increased Mineral Resource Estimate - Blackbush Deposit;
https://alligatorenergy.com.au/announcements/6942606
6 Refer ASX announcement 7 December 2023; Significant Exploration Target Range-Samphire;
https://alligatorenergy.com.au/announcements/5456269
5
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 8 7092 6230
ABN 79 140 575 604 | Level 1, 5-7 King William Road, Unley SA, 5061 | Page 5 of 15
Figure 2: Mullaquana Crown Lease (Station) location showing relative positions of
Blackbush and Plumbush deposits
Other Projects
Big Lake Uranium Project
Follow-up drilling commenced at the Big Lake Uranium Project during the quarter after persistent wet weather
had restricted access following the 2024 discovery. Big Lake covers the northern extensions of the proven
uranium-bearing geological formations that hosts the Beverley, Four Mile and Honeymoon ISR operations and
shares characteristics with large hydrocarbon-related ISR uranium districts in other areas of the world such as
Kazakhstan. The program is designed to assess the scale and continuity of the Site 10 discovery, where the
2024 campaign intersected substantial thicknesses of anomalous uranium mineralisation within interbedded
sands of the Namba Formation. Aircore drilling is testing a pipeline of additional targets across EL 6367 to
further evaluate the potential for a new sedimentary uranium district within the Lake Eyre Basin.
6
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 8 7092 6230
ABN 79 140 575 604 | Level 1, 5-7 King William Road, Unley SA, 5061 | Page 6 of 15
EnviroCopper Limited (15.61% interest)
Alligator maintained its 15.61% interest in EnviroCopper Limited during the quarter. EnviroCopper (ECR)
continued the trials at its Kapunda project with copper, cobalt and nickel concentrations continuing to
increase. ECR are now considering a second site to test following completion of geophysics and
hyperspectral core analysis.
Core drilling at the Alford project commenced with samples collected to be used to carry out preliminary
lixiviant trials via laboratory column leach tests.
Corporate
There were a number of corporate matters that occurred during the quarter, including:
• Completion of the divestment of the Company’s Northern Territory uranium assets to DevEx
Resources Limited occurred on 29 June 2026 following satisfaction of all conditions precedent,
simplifying the Company’s portfolio and directing its focus towards its South Australian assets. Cash
consideration of $5.480 million was received on completion, comprising $4.832 million from the
disposal of entities and $0.648 million from the disposal of tenements;
• The retirement of Mr Peter McIntyre as a Non-Executive Director after ten years of service;
• The appointment of Mr Blayney Morgan as interim Chief Financial Officer and Mr Jake van der Hoek
as Company Secretary following the resignation of Mr Joe Sutanto, as announced on 25 June 2026;
and
• Relocation of Registered Office and Principal Place of Business to Level 1, 5-7 King William Road,
Unley, South Australia 5061.
During the quarter, Alligator:
• Invested $4.229 million in exploration and evaluation activities; and
• Made payments of $169,758 to related parties, comprising director fees as disclosed in item 6.1 of the
Appendix 5B.
The Company recorded a net operating cash outflow of $1.735 million and ended the quarter with cash and
cash equivalents of $12.933 million.
As at 30 June 2026
Cash Balance A$12.9M
Ordinary Fully Paid Ordinary Shares (AGE) 4,437.0M
Listed Options 4.7c (Exp 08/09/27) (AGEOD) 278.2M
Unlisted Director & Employee Incentive Performance Options 80.5M
7
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 8 7092 6230
ABN 79 140 575 604 | Level 1, 5-7 King William Road, Unley SA, 5061 | Page 7 of 15
This announcement was authorised for release by the Board of Alligator Energy Ltd. Engage with this
announcement at the Alligator Energy InvestorHub.
Contacts:
For more information, please contact:
Dr Andrea Marsland-Smith
CEO & Managing Director
Blayney Morgan
Interim Chief Financial Officer
Jeffrey Sterlson
GM - Government Relations,
Communications and Public Affairs
js@alligatorenergy.com.au
Uranium
The information in this announcement that relates to Exploration Target Range, Exploration Data and
Exploration Results related to the projects and is based on and fairly represents information provided by Mr
Nick Jervis-Bardy. Mr Jervis-Bardy is a Member of the Australasian Institute of Mining and Metallurgy (the
AusIMM), his member number is 3088924. Nick Jervis-Bardy is employed on a full-time basis with Alligator as
Geoscience Lead and has sufficient experience which is relevant to the style of mineralisation and type of
deposit under consideration (including 5 years in ISR uranium mining operations and technical work) and to
the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC
Code). Mr Jarvis Bardy consents to the inclusion in the report of the matters based on his information in the
form and context in which it appears.
The information in this announcement that relates to the Blackbush Mineral Resource estimate (uranium) is
based on and fairly represents information compiled by and generated by Mr Ingvar Kirchner, AMC Geology
Manager (Perth) and a full-time employee of AMC Consultants. Mr Kirchner is a Fellow of the AusIMM and a
Member of the Australian Institute of Geoscientists (the AIG). Mr Kirchner has reviewed this Report and
consents to the inclusion, form and context relevant information herein as derived from the AMC Consultants
Samphire Mineral Resource estimate. Mr Kirchner has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration and to the activity which is being undertaken to qualify
as a Competent Person as defined by the JORC Code.
The information in this report that relates to Mineral Resources at Plumbush is based on information compiled
by Oliver Willetts, MAusIMM (CP – Geology) 312940, a Competent Person who is a Member of AusIMM. Mr
Willetts is a full-time employee of SRK Consulting (Australasia) Pty Ltd. Mr Willetts has sufficient experience
that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being
undertaken to qualify as a Competent Person as defined by the JORC Code. Mr Willetts consents to the
inclusion in the report of the matters based on his information in the form and context in which it appears.
Alligator Energy confirms that it is not aware of any new information or data that materially affects the
information included in this announcement and all material assumptions and technical parameters
underpinning the estimates in AGE ASX announcements 6 May 2025, Increased Mineral Resource Estimate
- Blackbush Deposit and 19 June 2026, Samphire Resource Increases By 67% continue to apply and have
not materially changed.
Competent Person’s Statements
Forward Looking Statements
8
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 8 7092 6230
ABN 79 140 575 604 | Level 1, 5-7 King William Road, Unley SA, 5061 | Page 8 of 15
This announcement contains or may contain certain forward-looking statements and comments about future
events, that are based on Alligator’s beliefs, assumptions and expectations and on information currently
available to management as at the date of this announcement.
Often, but not always, forward-looking statements can generally be identified by the use of forward-looking
words such as "may", "will", "expect", "plan", "believes", "estimate", "anticipate", "outlook", and "guidance", or
similar expressions, and may include, without limitation, statements regarding plans, strategies and objectives
of management, anticipated production and production potential, financial forecasts, product quality estimates
of future Mineral Resources and Ore Reserves.
Such statements are only expectations or beliefs and are subject to inherent risks and uncertainties which
could cause actual values, results or performance achievements to differ materially from those expressed or
implied in this presentation. Where Alligator expresses or implies an expectation or belief as to future events
or results, such expectation or belief is expressed in good faith and on a reasonable basis. No representation
or warranty, express or implied, is made by Alligator that the matters stated in this presentation will in fact be
achieved or prove to be correct. Except as required by law, Alligator undertakes no obligation to provide any
additional or updated information or update any forward-looking statements, whether as a result of new
information, future events, results or otherwise.
Readers are cautioned against placing undue reliance on forward-looking statements. These forward-looking
statements are not guarantees of future performance and involve known and unknown risks, uncertainties,
assumptions and other important factors, many of which are beyond the control of Alligator, the directors, and
management of Alligator. These factors include, but are not limited to difficulties in forecasting expected
production quantities, the potential that any of Alligator's projects may experience technical, geological,
metallurgical and mechanical problems, changes in market prices and other risks not anticipated by Alligator,
changes in exchange rate assumptions, changes in product pricing assumptions, major changes in mine plans
and/or resources, changes in equipment life or capability, emergence of previously underestimated technical
challenges, increased costs, and demand for production inputs.
Alligator Energy is a uranium project development and exploration company with projects that have clear
pathways for approval and development. The Alligator Energy Directors and Leadership Team have significant
uranium experience including uranium ISR operations at Beverley and Four Mile (Heathgate Resources),
achieving approval of WA’s first uranium mine at the Wiluna Uranium Project (Toro Energy), and senior
management roles with WMC Olympic Dam and ERA Ranger Mine.
Projects
About Alligator Energy
9
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 8 7092 6230
ABN 79 140 575 604 | Level 1, 5-7 King William Road, Unley SA, 5061 | Page 9 of 15
Alligator Group Tenure Holdings at Quarter End:
The following information is provided pursuant to Listing Rule 5.3.3.
Blackbush Mineral Resource Estimate reported above a 250ppm U3O8 cut-off.
JORC Category Mt
Grade
(U3O8 ppm)
U3O8 Metal
(Mlbs)
Indicated 8.2 786 14.2
Inferred 3.9 443 3.8
Total 12.1 676 18.0
The model is reported unconstrained and above a 250 ppm U3O8 lower cut-off grade for all zones in consideration of
potential for recovery by in situ leach processes.
There is no historical depletion by production within the model area.
Estimation of the disequilibrium factored and topcut gamma data (feU3O8c) is by ordinary kriging using dynamic anisotropy
for the mineralised zone.
Density is estimated by nearest neighbour estimation within the Kanaka Beds on the basis of logged geology as either 1.79
t/m3 for lignitic material or 1.92 t/m3 for other sediments; other paleochannel stratigraphies had a default of 1.90 t/m3
assigned; saprolite capping the basement granite was assigned a bulk density of 2.16 t/m3 and the primary basement
granite was assigned a nominal bulk density of 2.70 t/m3.
The model assumes agglomeration of 12.5mE x 12.5mN x 1mRL parent blocks for definition of well fields for production.
The model does not account for dilution, ore loss, hydrogeology, or recovery issues. These parameters should be considered
during the mining study as being dependent on the ISL treatment process.
Classification is according to JORC Code Mineral Resource categories.
Totals may vary due to rounded figures.
The mineral resource estimate in this report was reported by the Company in accordance with listing rule 5.8
on 6 May 2025. The Company confirms it is not aware of any new information or data that materially affects
the information included in the previous announcement and that all material assumptions and technical
parameters underpinning the estimates in the previous announcement continue to apply and have not
materially changed.
ARUP (NT) Uranium
Licence Number Tenement
Name
Ownership Interest Area
(km2
)
State Status
EL31452, EL31453,
EL31454
Various Alligator Energy Ltd 100 133 NT Applications
Eyre Peninsula (SA) Uranium
EL5926 Samphire S Uranium Pty Ltd 100 332 SA Granted
EL6350 Samphire S Uranium Pty Ltd 100 38 SA Granted
EL6835 Samphire S Uranium Pty Ltd 100 61 SA Granted
EL6901 Samphire S Uranium Pty Ltd 100 119 SA
Granted
Cooper Basin (SA) Uranium
EL6367 Big Lake
Big Lake Uranium
Pty Ltd
100 818 SA Granted
EL6847 Big Lake
Big Lake Uranium
Pty Ltd
100 841 SA Granted
EL6848 Big Lake
Big Lake Uranium
Pty Ltd
100 877 SA Granted
EL6849 Big Lake
Big Lake Uranium
Pty Ltd
100 978 SA Granted
EL6902 Big Lake
Big Lake Uranium
Pty Ltd
100 939 SA Granted
EL6903 Big Lake
Big Lake Uranium
Pty Ltd
100 994 SA Granted
EL6904 Big Lake
Big Lake Uranium
Pty Ltd
100 975 SA Granted
10
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 8 7092 6230
ABN 79 140 575 604 | Level 1, 5-7 King William Road, Unley SA, 5061 | Page 10 of 15
Plumbush Mineral Resource Estimate reported above a 140 ppm U3O8 cut-off
JORC category
Volume
(Mm³)
Density
(kg/m³)
Tonnage
(Mt)
Grade
(U3O8 ppm)
U3O8 metal
(Mlb)
Inferred – Total 7.9 1,873 14.9 370 12.0
1. The Mineral Resource is reported in accordance with the JORC Code (2012 Edition).
2. The Competent Person for the MRE is Oliver Willetts (MAusIMM 312940), a full-time employee of SRK Consulting
(Australasia) Pty Ltd.
3. Mineral Resources are reported at a grade-thickness (GT) cut-off of GT ≥ 400 ppm.m (applied within each reporting
domain group) and a grade cut-off of eU₃O₈ ≥ 140 ppm.
4. Grades are reported as equivalent uranium oxide (eU₃O₈) derived from calibrated downhole gamma logging. Secular
equilibrium between ²³⁸U and its daughter products is assumed.
5. Bulk density is assigned by sequential indicator simulation (SIS) estimated facies, using values adopted from the
Blackbush MRE for sand, lignite and saprolite (ASX 6 May 2025 - https://wcsecure.weblink.com.au/pdf/AGE/02943740.pdf) -
and assumed values for clay/silt and carbonate (see JORC Table 1 Section 3, Bulk density). No site-specific density
measurements are available.
6. The resource is constrained to ISR-amenable facies (sand, silt, lignite) using an acidic lixiviant; clay and carbonate blocks
are excluded.
7. The resource is classified entirely as Inferred. No Indicated or Measured Mineral Resources have been defined.
8. Mineral Resources are not Ore Reserves and do not have demonstrated economic viability. There is no certainty that
further exploration, feasibility studies, or development will result in the conversion of Mineral Resources to Ore Reserves.
9. Rounding may cause apparent differences in summation.
10. The effective date of the Mineral Resource estimate is 19 June 2026.
The mineral resource estimate in this report was reported by the Company in accordance with listing rule 5.8
on 19 June 2026. The Company confirms it is not aware of any new information or data that materially affects
the information included in the previous announcement and that all material assumptions and technical
parameters underpinning the estimates in the previous announcement continue to apply and have not
materially changed.
11
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 8 7092 6230
ABN 79 140 575 604 | Level 1, 5-7 King William Road, Unley SA, 5061 | Page 11 of 15
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Alligator Energy Limited
ABN Quarter ended (“current quarter”)
140 575 604 30 June 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
- -
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (382) (1,989)
(e) administration and corporate costs (1,477) (4,375)
1.3 Dividends received (see note 3) - -
1.4 Interest received 145 891
1.5 Interest and other costs of finance paid (21) (21)
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - 702
1.8 Other - -
1.9 Net cash from / (used in) operating
activities
(1,735) (4,792)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment (38) (160)
(d) exploration & evaluation (4,229) (15,608)
(e) investments (EnviroCopper) - -
(f) other non-current assets - -
12
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 8 7092 6230
ABN 79 140 575 604 | Level 1, 5-7 King William Road, Unley SA, 5061 | Page 12 of 15
Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
2.2 Proceeds from the disposal of:
4,832 4,932
(a) entities
(b) tenements 648 648
(c) property, plant and equipment 53 53
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (property and tenement bonds) 17 (2,215)
2.6 Net cash from / (used in) investing
activities
1,283 (12,350)
3. Cash flows from financing activities
- -
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
- (88)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (lease payments)/lease incentive
received
67 15
3.10 Net cash from / (used in) financing
activities
67 (73)
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
13,320 30,149
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(1,735) (4,792)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
1,282 (12,350)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
67 (73)
13
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 8 7092 6230
ABN 79 140 575 604 | Level 1, 5-7 King William Road, Unley SA, 5061 | Page 13 of 15
Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
12,934 12,934
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to
the related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 5,934 320
5.2 Call deposits 7,000 13,000
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
12,934 13,320
6. Payments to related parties of the entity and their associates Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
169
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a
description of, and an explanation for, such payments.
The payment amounts disclosed in 6.1 above relate to director fees.
14
info@alligatorenergy.com.au | www.alligatorenergy.com.au | +61 (0) 8 7092 6230
ABN 79 140 575 604 | Level 1, 5-7 King William Road, Unley SA, 5061 | Page 14 of 15
7. Financing facilities
Note: the term “facility’ includes all forms of
financing arrangements available to the
entity.
Add notes as necessary for an
understanding of the sources of finance
available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (
Share your feedback
Discover