Global Uranium Conference Presentation
Released
Released
Announcement PDF
Investor Presentation | ASX:AGE | alligatorenergy.com.au
ASX:AGE
Advancing Samphire Uranium Project
into Trial Production
GlobalUraniumConference
October2025
AndreaMarsland-Smith
2
Investor Presentation | ASX:AGE | alligatorenergy.com.au
Corporate Overview
Capital Structure
2
4,430.1 M
Ordinary Shares
A$119.6 M
Market Cap (@ 17/10/25)
460.2 M $30.1 M
A$0.027
Share Price
(@ 17/10/25)
Listed and
Unlisted Options
Cash (@ 30/6/25)
Retail
35.9%
Brokers & Banks
22.4%
Directors &
Executives
4.1%
Institutions
37.6%
Top 50 Shareholders
3
Global Uranium Conference | ASX:AGE | alligatorenergy.com.au
Samphire Uranium Project: South Australia
Excellent location with positive stakeholder relations
• Acquired in late 2020
• Located in South Australia
• Proven approvals process with 5 mines approved in SA
• 20 kms from Whyalla
• Location brings strong benefits of excellent regional
infrastructure, along with local engineering and service
providers & highly skilled workforce
• AGE has very positive relationships with Whyalla
community, local council & businesses
3
4
GUC Presentation | ASX:AGE | alligatorenergy.com.au
South Australia has proven
process with 5 mines approved
Tier One
Jurisdiction
Simulating commercial production to
derisk the project
Field Recovery
Trial
In situ mining team driving
the project
Additional targets at Samphire and
new discovery at Big Lake
Discovery
Potential
Experienced Team
To Deliver
Highlights
Derisking of project by experienced team that is focussed on delivery and growing the mine life
Global Uranium Conference | ASX:AGE | alligatorenergy.com.au
5
5
Delivering Australia’s Next Uranium Mine and Beyond
Pathway to production and growing the business
CURRENT STATUS
Updated scoping study(1)
highlighting strong project
economics
All approvals received for FRT
FRT site construction
underway
Feasibility study and mining
lease scoping has commenced
FIELD RECOVERY TRIAL PRODUCTION
Derisking of the Samphire
project
Construction of FRT plant
complete end CY25
First results from FRT
operations in Q1 CY26
Key inputs for the DFS
established
Targeting first production
2030/31
Enables time to grow the MRE
as well as the mining inventory
from:
– Strike extensions in
Blackbush
– Plumbush
– Testing the wider
paleochannel system
† Refer ASX release 14 December 2023 “Scoping Study Update”: Alligator confirms that all material assumptions underpinning the ‘production target’ or the forecast financial information derived from the ‘production target’ continue to
apply and have not materially changed other than the outlook for the long-term uranium price as set out above; *Calculated using 0.70 US/A$ exchange rate inclusion of significant contingencies and inflation of 35%.
Global Uranium Conference | ASX:AGE | alligatorenergy.com.au
6
6
Scoping Study
Strong economics
A$131m
CAPEX
(including contingency)
AISC
(A$47.58/lb)
US$33.31/lb
IRR*
(post-tax, real,
ungeared)
42%
Payback
2.45 years
Cash Costs
(A$22.94 /lb)
US$16.06/lb
A$257m
NPV8*
(post-tax, real,
ungeared)
† Refer ASX release 14 December 2023 “Scoping Study Update”: Alligator confirms that all material assumptions underpinning the ‘production target’ or the forecast financial information derived from the
‘production target’ continue to apply and have not materially changed other than the outlook for the long-term uranium price as set out above; *Calculated using 0.70 US/A$ exchange rate inclusion of significant
contingencies and inflation of 35%.
Study metrics* at US$75 / lb long term uranium price
Study metrics* based on analyst's current long-term price projections of US$90 / lb
A$131m
CAPEX
(including contingency)
AISC
(A$48.96/lb)
US$34.06/lb
IRR*
(post-tax, real,
ungeared)
55%
Payback
1.93 years
Cash Costs
(A$22.94/lb)
US$16.06/lb
A$371m
NPV8*
(post-tax, real,
ungeared)
Global Uranium Conference | ASX:AGE | alligatorenergy.com.au
7
7
Field Recovery Trial
Derisking the Samphire project
• Final step in the technical derisking of the project (wellfield recovery, in-situ chemistry, hydrogeology, reagent usage etc)
• Provides necessary inputs for the DFS and an important step towards full Mining Lease Application
• Plant construction underway
• Operations to commence Q1 CY26, with first results expected in the same quarter
Global Uranium Conference | ASX:AGE | alligatorenergy.com.au
8
8
Plumbush
Blackbush
• 18 Mlbs(2) to support startup mining
operation at Blackbush with staged
expansion.
– 14.2Mlbs Indicated, 3.8Mlbs Inferred
– 12yr mine life at 1.2 Mlbs production
rate per annum
– Indicated Resource now of a size and
integrity ready for detailed wellfield
designs for mine plan in DFS
• Exploration Target Range 15-75Mlbs(3)
(excludes Blackbush)
(2) AGE ASX Release 6 May 2025 - Increased Mineral Resource Estimate and Upgrade of
Indicated Resource for the Blackbush Deposit, Samphire U Project.
https://wcsecure.weblink.com.au/pdf/AGE/02943740.pdf
(3) AGE ASX Release 7 December 2023 -Significant Exploration Target Range established,
Samphire Uranium Project, South Australia 02751150.pdf (weblink.com.au)
Resource Growth
Significant upside potential to grow upon existing Mineral Resource Estimate
Global Uranium Conference | ASX:AGE | alligatorenergy.com.au
9
9
Upcoming Plans and Targets
Numerous upcoming news flow and milestones in 2025 and 2026
Global Uranium Conference | ASX:AGE | alligatorenergy.com.au
10
10
• Geologically analogous to world-class ISR fields in hydrocarbon
basins - Kazakhstan, Wyoming, Texas.
• Same host sands as Beverley-Four Mile & Honeymoon.
• Province never-before been drilled exploring for uranium.
• Inaugural drilling program (August 2024) intersected significant
thicknesses of anomalous uranium mineralisation.
- AC24-021 20m (65ft) @ 110 ppm U from 347ft (106m)
- AC24-022 35m (114ft) @ 117 ppm U from 305ft (93m)
- AC24-023 5m (16ft) @ 47 ppm U from 341ft (104m)
- AC24-025 10m (32ft) @ 138 ppm U from 354ft (108m)
• 2025 - Second drilling program commenced but delayed due to QLD
floodwaters.
• Potential to become a new uranium province in South Australia.
• Alligator’s large exploration licence holding secures first mover
advantage.
Refer ASX Announcements: 23 October 2024 – BLU Uranium Discovery, and 27 Feb 2025 – Follow Up drilling at BLU
Big Lake Project
Potential to unlock a new uranium province
Global Uranium Conference | ASX:AGE | alligatorenergy.com.au
11
11
Alligator Energy
Tier 1 jurisdiction
Experienced team to deliver projects on time and on budget
Upside potential from multiple exploration opportunities
Key Milestone Catalysts
Multiple news releases over the coming period as key project
milestones are achieved
Results from FRT operations within the next 6 months
Release of a Definitive Feasibility Study
Results from both extensional and infill exploration drilling
The Alligator Energy Value Proposition
Strong value proposition with multiple near-term share price rerating catalysts
12
Global Uranium Conference | ASX:AGE | alligatorenergy.com.au
Disclaimer
Forward Looking Statements
This presentation contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without
limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance of the Company. These risks and uncertainties
could cause actual results and the Company’s plans and objectives to differ materially from those expressed in the forward-looking information. Actual results and future events could differ
materially from anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates and opinions of management on the dates they are
made and expressly qualified in their entirety by this notice. The Company assumes no obligation to update forward-looking information should circumstances or management’s estimates or
opinions change.
Competent Person’s Statement – Uranium and Previously Reported Information
Information in this report is based on current and historic Exploration and Resource Drilling Results compiled by Dr Andrea Marsland-Smith, who is a Member of the AusIMM. Dr Marsland-Smith is
employed by Alligator Energy as Chief Executive Officer (CEO) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity she is undertaking (including 21 years working with ISR uranium development and operations) to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr Marsland-Smith consents to the inclusion in this release of the matters based on her information in the form and
context in which it appears.
Information in this report that relates to the Exploration Target estimate was compiled by Dr Andrea Marsland-Smith, who is a Member of the AusIMM. Dr Marsland-Smith is employed by Alligator
Energy as Chief Executive Officer (CEO) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity she is undertaking
(including 21 years working with ISR uranium development and operations) to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves. Dr Marsland-Smith consents to the inclusion in this release of the matters based on her information in the form and context in which it appears.
In relation to Exploration Results, Mineral Resource Estimates and Exploration Target in the ASX announcements referenced on slide 8 the Company confirms that it is not aware of any new
information or data that materially affects the information included in the original market announcement and that all material assumptions and technical parameters underpinning the estimates in
the relevant market announcement continue to apply and have not materially changed. In relation to production target referred to on slide 7 & 8, the Company confirms that all material
assumptions underpinning the production target, and the forecast financial information derived from the production target, in the initial announcement continue to apply and have not materially
changed.
Andrea Marsland-Smith
CEO
+61 (0) 7 3839 3904
E: ams@alligatorenergy.com.au
www.alligatorenergy.com.au
Share your feedback
Discover