Full Year Statutory Financial Report - 30 June 2025
Released
Released
Announcement PDF
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
FINANCIAL REPORT FOR THE YEAR ENDED
30 JUNE 2025
Page 1
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
DIRECTORS’ REPORT
Your directors present their report, together with the financial statements of the Group, being Alligator
Energy Limited (“the Company”, “Alligator” or “AGE”) and its controlled entities (“the Group”), for the
financial year ended 30 June 2025.
Directors
The following persons were Directors of the Company during the whole of the financial year and up to the
date of this report, unless otherwise stated:
Paul Dickson (Chairman)
Fiona Nicholls
Peter McIntyre (Callum McIntyre appointed as alternate)
Gregory Hall
Principal activities and significant changes in nature of activities
The principal activities of the Group are uranium and other energy mineral exploration and their potential
future development. There were no significant changes in the nature of the Group’s activities during the year.
Dividends
There were no dividends paid to members during the financial year.
Operating and Financial Review
a) Operating Performance
During the financial year the Group remained focused on its ESG related operating KPIs including:
Operation with four Medical Treatment Injuries (MTI) during the financial year
One minor reportable environmental issue Transition from a paper-based Workplace Health,
Safety and Environment system to a digital system
Open engagement and compliance under two Native Title Mining Agreement for Exploration
(South Australia) and Exploration Agreements (Northern Territory) with the respective Traditional
Owners
Compliance with other applicable agreements, regulations and laws
Stakeholder engagement sessions were held in relation to the Samphire Project status’s Retention
Lease application and the planned operation of the field recovery trial for the Samphire Project.
Multiples one-on-one meetings were also held. Stakeholder meetings and one-on-one
engagements were held in regard to planned work and status of the Big Lake Uranium project in
South Australia, and the Alligator Rovers uranium projects in the Northern Territory.
Open and regular communications continued with the pastoralists in the area surrounding the
Samphire Project where possible, as well as with the Whyalla region community.
Page 2
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
DIRECTORS’ REPORT
(continued)
b) Operations for the year
Overview
It has been another busy year across all of Alligator’s operations during the 2025 financial year involving
the following key achievements:
-
-
-
-
-
Progressing exploration and evaluation of the Samphire Uranium Project in South Australia,
specifically resource extension drilling which lead to a revised JORC Resource Estimate at an
improved confidence level (increased Indicated versus Inferred category).
Securing a Retention Lease to conduct a field recovery trial at the Blackbush Deposit (Samphire
Project) and finalising the operating procedures for this trial in the form of a Program for
Environment Protection and Rehabilitation that required approval by the Department of Energy and
Mines (SA) (approved post year end - 25 August 2025)
Conduct of an inaugural drilling program at the Big Lake Project in the Cooper Basin, South Australia
which identified significant thicknesses of paleochannel sands and elevated uranium values. Four
holes recorded uranium values at over 100 ppm, including two intersections within porous sands of
greater than 20 m thickness,
A follow-up rotary-mud drilling program at Big Lake was commenced, however had to be curtailed
due to the significant rain event in Western Queensland with floodwaters impacting AGE’s drilling
areas.
Conduct of a targeted RC drilling program at the Nabarlek North Project in the Alligator Rivers
Uranium Province in the Northern Territory; and
Pursuing investment interest in the Company’s nickel cobalt joint venture (Piedmont Project) in
northern Italy which was abandoned post year end due to limited investor interest.
In addition, a number of business development opportunities in uranium and energy metals in the Group’s
target regions were evaluated with discussions and investigations ongoing.
Samphire Uranium Project – South Australia (Alligator 100%)
Field Recovery Trial Preparation
In late December 2024, the Group received the draft Retention Lease (RL) tenement documents from
the SA Department for Energy and Mining (DEM) including the proposed Conditions of Operation with
which the Group must comply while operating the Field Recovery Trial (FRT). On accepting the
conditions attached to the RL, the Group received confirmation from the DEM of the grant of a RL for
the conduct of the FRT, on 13 January 2025. The associated Conditions were then factored into the
Program for Environment Protection and Rehabilitation (PEPR) which was approved by the DEM and coregulators post year end. The PEPR approval provides the ’green light’ to commence on-ground
construction and commissioning activities associated with the FRT (Oct to Dec 2025) ahead of operating
the trial which will extend into the first quarter of 2026.
Page 3
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
DIRECTORS’ REPORT
(continued)
b) Operations for the year (continued)
Whyalla-based contractor, Ahrens Group Pty Ltd, was selected for the on-site construction of
the FRT pilot plant and associated civils, along with the pipe works and pumps to connect with
the three trial-production-well patterns. The construction contract was signed after year end
with plans underway to mobilise their team and subcontractors in the Whyalla region
(estimated at up to 25 skilled construction and trades people) for the circa 3-month construction
and commissioning phase.
The objectives of the FRT are to confirm key parameters of a future production operation and
marks an important step toward development. Parameters to be assessed include in-situ
chemistry, hydrogeology, uranium recovery, reagent usage, and other environmental and
economic factors. Data and learnings further de-risk the Project and provide the necessary
inputs to a definitive feasibility study and Mining Lease Application to be commenced during 2H
2025.
The FRT operations will be conducted over a period of three to four months after construction and
commissioning are completed and will involve establishment and operation of three well-field patterns
and circulation of mining fluids through the pilot processing plant (already fabricated). Pending the
outcome of the FRT operations, and any additional test work identified, the pilot plant and wellfields will
be removed, and the area rehabilitated.
Continued Resource Definition and Extension Drilling
Drilling activities continued during the first six months of the financial year at the Blackbush
Deposit. Key outcomes from this activity included:
-
Uranium mineralisation was extended by a cumulative 500m of strike length outside the known
Blackbush West December 2023 Mineral Resource Envelope.
Significant uranium intersections encountered in roll fronts focused on the western and southern
areas of Blackbush West.
A total of 61 holes were drilled for 5,158m with alignment noted to the strategy outlined in Alligator’s
Exploration Target Range released in December 2023.
A continued refinement in the understanding of the Blackbush West uranium roll fronts delivered
further targets outside of the December 2023 Inferred Mineral Resource Envelope.
Page 4
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
DIRECTORS’ REPORT
(continued)
b) Operations for the year (continued)
Blackbush Resource Update
An update of the JORC Mineral Resource Estimate (MRE) for the Blackbush deposit was completed
and released in May 2025 with the following key outcomes:
-
With the addition of the 2024 resource drilling, the Indicated portion of the MRE was further
increased by 10% from the previous MRE to 14.2 Mlbs at an average grade of 786ppm U3O8.
The Total MRE (Inferred and Indicated) increased by 3% to 18.0 Mlbs at an average grade of 676ppm
U3O8.
0.5 Mlbs were added to the Total Resource, and 1.3 Mlbs were converted to the Indicated Resource
Category.
Big Lake Uranium Project- South Australia – (Alligator 100%)
The inaugural drilling program was completed during the first half of the financial year covering 27 holes
for a combined total of 3,413 m. Fences of holes were strategically placed centred on five areas to
calibrate seismic/AEM interpretations and provide confirmation of key elements to demonstrate a fertile
basin uranium roll-front mineralisation model.
As per ASX release 23 October 2024, drilling at Area 10 on EL6367 returned significant thicknesses of
paleochannel sands and elevated uranium values. Four holes recorded uranium values at over 100 ppm,
including two intersections within porous sands of greater than 20 m thickness (refer table below).
Hole ID
From (m)
To (m)
Thickness (m)
Laboratory
Assay
(U ppm)
AC24-021
106
126
20
100
AC24-021
129
130
1
129
AC24-022
93
128
35
117
AC24-023
104
109
5
47
AC24-025
108
118
10
138
A follow-up drilling campaign was initiated in late February 2025 commencing with a rotary mud drill
program. After some equipment commissioning issues, two drill holes were completed in the first 2 weeks
of the program. These initial holes encountered similar oxidised sands observed in last year’s drilling.
Subsequently, flood waters from the significant rain event in Western Queensland impacted AGE’s drilling
areas such that drilling had to be suspended. Floodwater has since begun to recede, however, damage to
Page 5
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
DIRECTORS’ REPORT
(continued)
b) Operations for the year (continued)
local infrastructure and current road closures have prevented access to the region until after the end of
the financial year. Alligator continues to monitor the impact of the flood event and has begun preparing
a revised AC drilling program planned for later in the 2025 calendar year should conditions permit.
Alligator Rivers Uranium Province (ARUP)
Tin Camp Creek Tenements (Alligator 100%), Beatrice Tenements (Alligator 100%) and Nabarlek North
Tenements (Alligator 100%)
During the dry season in the North Territory, Alligator undertook a further drilling program at the Nabarlek
North Project. Five out of seven holes drilled along strike of the U40 prospect on AGE’s tenement (U40
extension) intercepted anomalous uranium with peak results of 3m @ 260ppm U3O8 in NNRC24-031 from
45m (including 1m @ 570ppm U3O8). In addition to the results at U40 extension, a new mineral
occurrence (Bully Prospect) was identified along an interpreted structure approximately 4km to the
northeast. Here, 1m @ 108ppm U3O8 in NNRC24-019 from 83m was intersected with additional lowgrade anomalism at other intervals and in a neighbouring hole associated with vector chlorite/sericite
alteration in the target Cahill Formation.
Opportunistic grab samples during the dry season field program highlighted the potential for high purity
silica (HPS) to occur in the region through massive quartz veining. Two samples were collected over 8km
apart in separate vein systems returning up to 97.84% SiO2 through whole rock XRF analysis by Bureau
Veritas Minerals. HPS has uses in specialist technologies and chips for AI and solar cells in the renewable
sector. While 98% SiO2 and above is preferred in industry, improved sampling procedures and handling
could potentially improve results and understanding of the potential.
The RC drilling comprised 9 holes forming a three-fence program (3 holes per fence). This drilling provided
critical ties with recently completed geophysics, 2022 – 2023 geochemistry sampling and geological
interpretations. As reported in ASX release of 19 December 2023, significant uranium was intercepted in
NNRC23-008 returning 3m at 0.12% (1,211ppm) U3O8. This information will form the basis of further
investigations during the 2024 dry season work program to understand the potential continuity of U40
Prospect mineralisation into the Nabarlek North Project and aid with broader target generation.
During the year the Company acquired the remaining 2% interest in the Tin Camp Creek tenements from
West Arnhem Corporation Limited by granting a one-off buy-back option at the time of lodging a mining
lease application.
Piedmont Project – Northern Italy – 51% Joint Venture
The Piedmont Project was marketed to interested parties during the year after the Company chose to
focus its activities on the uranium projects in Australia. Based on the limited market interest in acquiring
the Project, the Company agreed with its JV partners in mid-July 2025 to relinquish the licences and
discontinue this business operation. The financial impact of this decision was immaterial as the
Company had previously impaired most of the exploration expenditure on the Project.
Page 6
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
DIRECTORS’ REPORT
(continued)
b) Operations for the year (continued)
Investment in EnviroCopper Limited (ECL) – 15.61% shareholding interest
During the year the Group completed a further subscription for fully paid ordinary shares in ECL for
$871k and now holds a 15.61% interest in ECL. Alligator’s further sole funding rights have lapsed and ECL
is in ongoing investment discussions with international investors focused on copper ISR for a significant
equity injection.
In the last quarter of the financial year, ECL received approval from the Department for Energy and
Mining, for a 90 day in-ground Site Environmental Lixiviant Trial (SELT) to confirm economic modelling
for potential copper extraction. The SELT commenced early in the 2026 financial year. If successful, this
trial may lead to feasibility studies and a mining lease application under the Mining Act (SA) for a Copper
ISR mine at Kapunda.
At the Alford West Project, tracer testing is scheduled for mid-October 2025 and the division of the
tenement associated with the Project was completed at the end of July 2025.
Capital raising
In June 2025, the Group received firm commitments to raise $17.25M (before costs) via placement to
institutional and sophisticated investors. The Placement was strongly supported by institutional investors,
both in Australia and overseas and has materially strengthened the Alligator share register. The Placement
involved the issue of 556M new ordinary shares at $0.031 per share and a one for two option issue
(Options) at an exercise price of $0.047 with a two-year life from the date of issue.
The terms of the Placement required the Group to seek Shareholder approval prior to issue and to seek
quotation of the Options, subject to compliance with the relevant ASX Listing Rules and the Corporations
Act. Shareholder approval was obtained at a general meeting of the Company held on 28 August 2025.
The funds raised through the Placement enable the Group to continue progress and expand its work
programs on its key uranium projects and enable evaluation of business development opportunities.
Performance Shares
On 4 December 2024, 30M Performance Shares issued to the vendors of the Big Lake Uranium Project
lapsed and were cancelled as the milestone of defining a JORC Compliant Inferred Resource of 25mlbs
U308 at 1,000ppm or greater was not met.
Executive leadership
Effective 1 July 2025, Greg Hall, the CEO and Managing Director, moved to a part-time role of Executive
Director - Marketing & Investor Relations and Dr Andrea Marsland-Smith, the incumbent COO, assumed
the CEO role.
Page 7
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
DIRECTORS’ REPORT
(continued)
c) Operating Loss
The operating loss before tax was $5,910,721 (2024: $3,451,724). The key variances affecting the
operating result for the financial year included:
Interest income for the year was consistent with the prior year due to the higher interest rate
environment and comparable average cash balances on hand.
An increase in employee benefits expense related to recruitment of a Stakeholder Engagement
Manager at the beginning of 2025, the increase in the superannuation guarantee levy, cost of
living salary adjustments and an increased allocation of senior technical management time to
corporate related activities.
Employee taxes relate to State Payroll Tax and the Federal Fringe Benefit Tax and are lower than
2024 due to catch-up payroll tax payment in that year related to 2023 when the Company first
reached the eligibility threshold.
An increase in share-based payments over the prior year because of a larger employee base and
increased eligibility/participation levels in the Employee Share Option Plan.
Insurance costs increased during the year because of the need to arrange cover for the
construction of the field recovery trial and storing of the processing plant in Whyalla.
Business Development costs for the year include the monthly amortisation of the share-based
payment to Sabasco for uranium and business development marketing expenses ($192k) and a
success fee ($50k) related to the EnviroCopper transaction.
An impairment provision of $2,211,661 (2024: $645,345 - Piedmont Project) was recognised for
the year related to the Alligator Rivers Uranium Province Projects (Nabarlek North, Tin Camp
Creek and Beatrice). The Group is considering the best way to take these Projects forward given
the significant data gathered over three years in Nabarlek North, and the higher exploration cost
profile for the region and increasing compliance related burden. Consequently, a detailed
technical review was commenced in February 2025 and will continue through the 2025 calendar
year, and the Group is not planning or budgeting significant operational expenditures in the
coming twelve months.
The Group expensed tenement holding costs incurred during the financial year at its Tin Camp
Creek and Beatrice Projects (ARUP) and for the second six moth of the financial year for Nabarlek
North. These expenditures related principally to salaries, rentals, royalties and compliance
activities and totalled $720,766 (2024: $262,588).
Other expenses increased in the current financial year due to recruitment agent’s fees and
conference attendance.
d) Financial Position
Net assets of the Group totaled $77,352,943 as at 30 June 2025 (2024: $65,853,127) with the
increase relating principally to the additional equity capital raised in June 2025 and the resultant
expenditure on project related exploration and evaluation, increase in the investment in
EnviroCopper Limited and the capital spend procuring items for the FRT. Cash balances as at 30
June 2025 were $30,149,797 (2024: $28,392,442).
Page 8
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
DIRECTORS’ REPORT
(continued)
e) Business strategies and prospects for future financial years
Strategy and Business Plan
Goals – By 2030:
To be a profitable long term Uranium producer, producing between 1 – 2 Mlb p.a.
To have a second advanced uranium project moving towards development, and a successful advanced
exploration / development project in the energy minerals sector.
Alligator’s strategy to achieve the 2030 goals is to advance its key resource and exploration targets,
through direct and strategic partner investment, while evaluating and if suitable acquiring further
uranium or energy minerals interests in target geographic regions.
The Samphire Project is the most advanced project in the Group’s portfolio with a JORC compliant Mineral
Resource Estimate in place and a positive Scoping Study. Activities are now underway, after receiving the
final approval post financial year end, to construct and operate a field recovery trial into early calendar
year 2026 with the results expected to underpin completion of a definitive feasibility study. This Study will
cover a low cost ISR style development that has a smaller environmental footprint than conventional style
mines.
The Big Lake Uranium Project is focused on uncovering a new ISR amenable uranium province. The
conceptual exploration model for Big Lake is based on analogous hydrocarbon basins with uranium
occurrences in Kazakhstan, Wyoming and Texas in the United States. An inaugural stratigraphic drill
program was conducted during the financial year which intersected significant thicknesses of anomalous
uranium mineralisation within interbedded palaeochannel sand units in the Namba Formation. The
discovery is the first proof of concept that significant uranium is present within the Lake Eyre basin
sediments that lie above the hydrocarbon-rich Cooper Basin and within potentially In-Situ Recovery (ISR)
amenable host and depths.
The Group previously conducted a comprehensive re-evaluation of the regional and local geology for the
ARUP region, which has enhanced the understanding of the stratigraphic and structural relationships that
we believe are the proven key to mineralisation of large uranium deposits within the ARUP. This
highlighted a broad prospective zone running from the western Beatrice Project, through the eastern
portion of the Tin Camp Creek Project and into the Nabarlek North Project area as high priority for further
work. Along this trend, 8 priority areas were highlighted combined with 6 additional target areas within
the Alligator licences. Recent regulatory changes in the Northern Territory which impact the ability to
readily access certain of the high priority targets together with the higher exploration cost profile for this
terrain has led the Company to place exploration activities on hold whilst a strategy for taking these
Projects forward is developed.
Page 9
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
DIRECTORS’ REPORT
(continued)
e) Business strategies and prospects for future financial years (continued)
Strategy and Business Plan (cont.)
Alligator has also expanded its energy minerals interest by making a strategic 15.61% equity investment
in EnviroCopper Ltd (‘ECL’). ECL is currently advancing ISR trials for environmentally sustainable copper
extraction at its flagship Kapunda copper project and has similar plans at its Alford West copper project.
The investment in ECL and resultant collaboration is extremely complimentary to Alligator’s existing and
substantial in house ISR production expertise and expands Alligator’s ISR footprint to include an additional
future in-demand commodity.
Work on evaluating further uranium and energy mineral opportunities in key target regions continues
utilising existing experienced staff and key consultants. Alligator still has one of the few Board,
Management and Advisory teams that have discovered uranium projects, taken uranium projects through
resource definition and into development, and managed and operated uranium mines.
Research & Development
The Group believes that exploration success can be maximized by ensuring multiple high-quality target
areas are tested as efficiently as possible with a strong technical focus supported by Research and
Development Programs. R&D activities in 2012-2017 focused on identifying and targeting covered and
fully preserved unconformity uranium deposits beneath the covering Kombolgie Sandstone in the ARUP.
Along with this, investigation and experimentation were undertaken on innovative applications of
radiogenic isotope geochemical testing and Sub Audio Magnetics (SAM) geophysical techniques.
Application of downhole wireline geophysical tools such as Borehole Magnetic Resonance (BMR) and new
to the market Spectral Gamma tool has been trialled at Samphire to assess improved methods of
determination of key formation characteristics to reduce logging costs compared to industry standard
approaches.
Alligator considers aspects of the field recovery trial at Samphire capable of generating new knowledge
or know-how as part of this program of work. This includes aspects such as trialling membrane
technology to manage chloride levels, alternate uranium extraction methodologies, accelerated natural
attenuation of the field recovery trial aquifer, application of the HydrosmartTM water conditioning
system to reduce mineral precipitation within production and disposal wells and application of Drone/AI
in weed identification and eradication to improve land management practices. A R&D Offset claim was
lodged for FY24 in relation to the supporting activities associated with preparing for the field recovery
trial. Post year end a R&D Offset refund of $702k was received for the FY24 period.
P a g e 10
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
DIRECTORS’ REPORT
(continued)
e) Business strategies and prospects for future financial years (continued)
Material Business Risks
The Group is subject to the inherent risks which apply to some degree to all participants in the exploration
and mining industries. These risks which could impact on the execution of the Group’s strategy include
the following:
(i)
Lack of discovery success
Mineral exploration involves a high degree of risk in relation to the probability of the discovery of a
significant resource which can be commercially developed. Regardless of the application of experience,
technical knowledge and careful evaluation, the discovery of commercial deposits of uranium or other
minerals cannot be assured. Alligator strives to reduce exploration risk by ensuring a high level of
experience and technical skill is applied to planning and execution of exploration programs.
There is also no assurance that if deposits of uranium or other minerals are discovered, commercial
development of these resources will occur. The commercial viability of a particular resource is dependent
on a number of factors including the quality and nature of the resource and future commodity price and
exchange rate fluctuations, factors which are beyond the control of the Company.
(ii)
Capital requirements
Alligator relies on the issue of its equity shares or farm-out/joint venturing or optioning of Alligator's
mineral properties to fund its business strategy. There can be no assurance that Alligator will be able to
raise such capital or establish such agreements on favourable terms. If Alligator is unable to obtain
additional capital, it may be required to reduce the scope of its future exploration programs, which could
adversely affect its business, financial condition and results of operation. The ability to raise capital on
favourable terms is dependent on a range of factors including the strength of equity and capital markets
in Australia and throughout the world, changes in government policies, commodity prices and the
prospectivity of the Group’s tenement holdings and identified prospects.
(iii)
Land Access Issues
Aboriginal land access, Aboriginal heritage related concerns and concerns of stakeholders with
overlapping tenure e.g. pastoralists and other overlapping licence holders such as renewable energy or
hydrogen in South Australia may affect the ability of Alligator to pursue exploration, development and
mining on Alligator's properties. Alligator is committed to working with all stakeholders associated with
land access for exploration and development in a complimentary and effective manner.
(iv)
Environmental and Compliance Issues (Sovereign Risk)
The current or future operations of Alligator, including mineral exploration or development activities and
commencement of production, require permits from governmental authorities and such operations are
and will be governed by laws and regulations governing prospecting, development, mining, environmental
protection, mine safety, land access and other matters. Such laws and regulations may vary in future.
There can be no assurance, however, that all permits which Alligator may require for mineral exploration.
P a g e 11
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
DIRECTORS’ REPORT
(continued)
e) Business strategies and prospects for future financial years (continued)
(iv)
Environmental and Compliance Issues (Sovereign Risk) (continued.)
or construction of mining facilities and conduct of mining operations will be obtainable on reasonable
terms or that such laws and regulations would not have an adverse effect on the ability to ultimately
secure licencing for a mining project.
The Department for Energy and Mining in South Australia are still considering how the new Ministerial
discretionary powers will be structured to allow extensions to the current 18-year tenure limit of mineral
exploration tenements in South Australia introduced in the Mining Regulations of 2020. This uncertainty
could impact certain of the Group’s exploration tenements in the State if not resolved before late 2027.
In relation to current activities, the Group is in compliance with governing laws and regulations and
manages these risks through its existing standard operating procedures, Environmental Management
Plans, internal audits and direct liaison with regulators and stakeholders along with involvement in peak
industry bodies.
(v)
Operational
Certain of the Group’s projects are in remote areas where vehicle and air travel remain a significant risk
that is mitigated where possible through operating procedures. Workplace health, safety and
environment is an inherent industry risk and remains at the forefront of all operational activity through
toolbox sessions, pre-starts, Take 5 Risk Assessments, Incident and Hazard reporting, corrective action
and mitigation identification and reporting on action close out. Retention and recruitment of experienced
personnel also presents challenges particularly given the limited uranium experience and expertise in
Australia, particularly in ISR. The risk of cyber security continues to be considered and addressed with
appropriate systems and training.
(vi)
Technical
The Group is