Resource Extension Drilling Recommences - Samphire Project
Released
Released
Announcement PDF
ASX Announcement
2 February 2024
Resource Extension Drilling Recommences at
Samphire Uranium Project, South Australia
Alligator Energy Limited ASX: AGE (Alligator or the Company) is pleased to advise that both
resource extension and broader exploration drilling has recommenced at the Samphire Uranium
Project south of Whyalla, South Australia for the duration of the 2024 calendar year.
Highlights
• Drilling contractor engaged and on-site for sustained operations at Samphire throughout
2024 to focus on the execution of a multi-year exploration program on targets outlined in
AGE’s recently announced Exploration Target Range1. This includes:
-
Drill testing areas adjacent to the limits of the existing Blackbush resource envelope (Figure
1) targeting a further upgrade to the Samphire Project economics through extending the
life of mine as outlined in AGE’s Scoping Study2.
-
Drill testing areas interpreted to be highly prospective to host uranium mineralisation, based
on the presence of underlying uranium source rocks, overlying or adjacent palaeochannel
sediments like those encountered at Blackbush and historical drillholes that have intersected
mineralisation.
• AGE’s Exploration Target Range identified that only 10% of the prospective uranium system
(Blackbush Deposit and portion of Plumbush Prospect) has been well explored, 32% partly drill
tested and 58% completely untested indicating the significant potential for new discoveries
in the Project area.
• All land access and approvals are in place to execute the 2024 program.
Alligator’s Managing Director and CEO Greg Hall stated: “The Samphire Uranium Project has
been shown through our recent scoping study to represent an economically significant project in the
current and improving uranium market. This study was however limited to a targeted production
profile from the declared Blackbush JORC compliant resource.
As announced previously, the next steps are to enhance this project through adjacent and regional
exploration. We are pleased to advise that, in line with our plans, drilling has recommenced at the
Blackbush deposit to target enlarging and extending the overall total JORC Mineral Resource
Estimate for the Samphire Project. This year-round drilling program, with the exception of planned
breaks around the pastoralists lambing season in May, is an important and positive start to a busy
2024 for Alligator Energy.”
1 AGE ASX Release 7 December 2023. https://wcsecure.weblink.com.au/pdf/AGE/02751150.pdf
2 ASX Announcement 14 December 2023. 02753924.pdf (weblink.com.au)
ASX: AGE
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | +61 (0) 7 3839 3904
info@alligatorenergy.com.au | www.alligatorenergy.com.au | Page 1 of 5
Commencement of Drilling
AGE through its 2021-2023 drill programs at the Blackbush Deposit and extensive data review of
over 1,000 historical drillholes has identified several target areas that remain open and untested.
Drilling is now underway to explore several of these target areas which comprise part of a multi-year
exploration program outlined in AGE’s recently announced Exploration Target Range2. The 2024
program will be initially focussing on:
1) Drill testing areas immediately adjacent to the limits of the existing Blackbush resource
envelope to continue to upgrade potential project economics - being the open channels
indicated with blue arrows in Figure 1, and
2) Drill testing an extension of Blackbush being target areas 1 & 2 (Blackbush Extensions 1 &2)
identified in AGE’s Exploration Target Range (see purple circles marked in Figure 1). These
are prospective to host additional uranium mineralisation based on historical drillholes that
have intersected mineralisation, the presence of underlying uranium source rocks and
overlying palaeochannel sediments.
Figure 1: Updated Inferred resource area outline (blue) and Indicated Resource area outline (red) showing historical and
AGE drillholes focussed within the Inferred Resource envelope. Further resource extension potential shown in arrows
and pink circles.
Work undertaken to derive the Exploration Target Range showed that with 64 kms of interpreted
palaeochannel strike length (Figure 2), only 10% of the prospective system (Blackbush Deposit and
portion of Plumbush Prospect) have been well explored, with a further 30% partly drill tested. To
date, 58% (over 37 kms) of the prospective areas of the palaeochannel system remain completely
untested, indicating the significant potential for new discoveries in the Project area.
ASX: AGE
ASX: AGE
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | +61 (0) 7 3839 3904
info@alligatorenergy.com.au | www.alligatorenergy.com.au | Page 2 of 5
Figure 2: Map highlighting the 11 target area locations within the Samphire Uranium Project Area.
Figure 3: Samphire Project Area highlighting encouraging gamma eU3O8 results intersected from historical drilling in
Kanaka Bed sands within the Samphire Uranium Project Area.
ASX: AGE
ASX: AGE
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | +61 (0) 7 3839 3904
info@alligatorenergy.com.au | www.alligatorenergy.com.au | Page 3 of 5
This announcement has been authorised for release by the Alligator Energy CEO
Contacts
For more information, please contact:
Mr Greg Hall
Mr Mike Meintjes
CEO & Director
CFO & Company Secretary
gh@alligatorenergy.com.au
mm@alligatorenergy.com.au
For media enquiries, please contact:
Alex Cowie
Media & Investor Relations
alexc@nwrcommunications.com.au
ASX: AGE
ASX: AGE
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | +61 (0) 7 3839 3904
info@alligatorenergy.com.au | www.alligatorenergy.com.au | Page 4 of 5
Forward Looking Statement
This announcement contains projections and forward-looking information that involve various risks and uncertainties
regarding future events. Such forward-looking information can include without limitation statements based on current
expectations involving a number of risks and uncertainties and are not guarantees of future performance of the Company.
These risks and uncertainties could cause actual results and the Company’s plans and objectives to differ materially from
those expressed in the forward-looking information. Actual results and future events could differ materially from anticipated
in such information. These and all subsequent written and oral forward-looking information are based on estimates and
opinions of management on the dates they are made and expressly qualified in their entirety by this notice. The Company
assumes no obligation to update forward-looking information should circumstances or management’s estimates or opinions
change.
Competent Person’s Statement
Information in this report is based on current and historic Exploration and Resource Drilling Results compiled by Dr Andrea
Marsland-Smith who is a Member of the AusIMM. Dr Marsland-Smith is employed on a full-time basis with Alligator Energy
as Chief Operating Officer, and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration (including 21 years in ISR uranium mining operations and technical work) and to the activity she is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves. Dr Marsland-Smith consents to the inclusion in this release of
the matters based on her information in the form and context in which it appears.
About Alligator Energy
Alligator Energy Ltd is an Australian, ASX-listed, exploration company focused on uranium and energy related minerals,
principally cobalt-nickel. Alligator’s Directors have significant experience in the exploration, development and operations
of both uranium and nickel projects (both laterites and sulphides).
Projects
ASX: AGE
ASX: AGE
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | +61 (0) 7 3839 3904
info@alligatorenergy.com.au | www.alligatorenergy.com.au | Page 5 of 5
Share your feedback
Discover