Investor Presentation - WNA London - Sept 24 - amended
Released
Released
Announcement PDF
ASX:AGE
Advancing Samphire Uranium
Project into Trial Production
September 2024 – Greg Hall, Andrea Marsland-Smith, Kevin Smith
Disclaimer
Forward Looking Statements
This presentation contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can
include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance of the Company.
These risks and uncertainties could cause actual results and the Company’s plans and objectives to differ materially from those expressed in the forward-looking information. Actual
results and future events could differ materially from anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates
and opinions of management on the dates they are made and expressly qualified in their entirety by this notice. The Company assumes no obligation to update forward-looking
information should circumstances or management’s estimates or opinions change.
Competent Person’s Statement – Uranium and Previously Reported Information
Information in this report is based on current and historic Exploration and Resource Drilling Results compiled by Dr Andrea Marsland-Smith, who is a Member of the AusIMM. Dr
Marsland-Smith is employed by Alligator Energy as Chief Operating Officer (COO) and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity she is undertaking (including 15 years working with ISR uranium development and operations) to qualify as a Competent Person as defined in
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr Marsland-Smith consents to the inclusion in this release of
the matters based on her information in the form and context in which it appears.
In relation to Exploration results and Mineral Resource estimates referred to in the announcements referred to on slides 10,12, 14, 16, 17 and 24 the Company confirms that it is not
aware of any new information or data that materially affects the information included in the original market announcement and that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. In relation to production target referred to on slides 10 and 12,
the Company confirms that all material assumptions underpinning the production target, and the forecast financial information derived from the production target, in the initial
announcement continue to apply and have not materially changed.
Competent Person’s Statement – Nickel Cobalt exploration
Information in this report is based on current and historic Exploration Results compiled by Mr Geoffrey Chapman who is a Fellow of the Australasian Institute of Mining and
Metallurgy. Mr Chapman is a Consultant Geologist with Alligator Energy Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves. Mr Chapman consents to the inclusion in this release of the matters based on his information in the form and context in which it
appears.
2
Alligator Corporate Presentation | September 2024 | ASX:AGE
Greg Hall (CEO), Andrea Marsland-Smith (COO), Kevin Smith
Company Snapshot
(Uranium Market and Investor Relations)
Capital Structure (as at 2 Sept 2024)
Share Price
$0.042
Ordinary Shares
3,869.8 M
Perf Shares, Listed & Unlisted Options
461.6 M
Cash as at 30 June 2024
$ 28.7 M
Market Cap
$163 M
Top 50 Shareholders
Brokers &
Banks
19%
Retail
45%
Directors
&
Executives
5%
Institutions
31%
3
Alligator Corporate Presentation | September 2024 | ASX:AGE
Board & Management
Paul Dickson | Non-Executive Chairman
Paul is a finance and corporate advisory professional with more than 30 years’ experience
in the finance services industry. He was a Founding Director at Paradigm Capital, a
boutique corporate advisory firm specialising in junior and mid-tier ASX listed resources
companies, and a Director of Proserpine Capital a private equity firm for circa 4 years.
Paul has been an AGE Board member since inception and Chairman for 3 years.
4
Callum McIntyre | Alternate Director
Callum has extensive experience in the finance and technology industries, both in
Australia and overseas. He is currently Director Business and Investment at Labonne
Enterprises, a private investment company. He is also Business Operations Manager at
Macallum New Energy, a private Company focused on the exploration and production of
gas in the Perth Basin. He holds a BSc from the University of WA, a Graduate Diploma
of Applied Finance, and is a Graduate Member of the Australian Institute of Company
Directors (GAICD).
Gregory Hall | CEO & Managing Director
Mike Meintjes | CFO & Company Secretary
Greg is an experienced mining engineer and CEO with 35+ years’ experience in
uranium and other mine management. He previously held roles at WMC Olympic
Dam & nickel mines, LKAB Iron Ore (Sweden), ERA Ranger & Jabiluka Uranium and
international commodities marketing with Rio Tinto (ERA) Uranium, and Bauxite &
Alumina groups. Greg was also founding CEO of Toro Energy Ltd.
Chartered Accountant/CFO/Company Secretary. Over 30 years professional
services principally with a Big Four accounting firm and recently in part-time
contracting and consulting roles. Extensive exposure to mining, oil & gas sectors in
WA, QLD and South Africa. CFO and Co Sec for AGE for 11 years
Peter McIntyre | Non-Executive Director
Dr Andrea Marsland-Smith | COO
Peter is a civil engineer and experienced CEO. He previously held GM roles with
WMC Ltd, including development of major mining projects. Peter was the founding
MD of Extract Resources during the discovery and pre-feasibility of Husab Uranium
mine in Namibia, sold for US$2.2 billion.
Andrea was previously at Heathgate Resources with roles over 15 years covering
technical and field positions in Geology, Head of Geology, Head of Regulatory &
Compliance, Head of Operations and Head of Government Relations and
Indigenous Affairs. She holds a PhD in Economic Geology and was the recipient of
Exceptional Women in Resources in 2016.
Fiona Nicholls | Non-Executive Director
Mike Barlow | Exploration Manager
Fiona has 30 years of experience working across a range of business functions
including strategy, planning, ESG and operations, multi-country project
development and approvals and due diligence processes. Fiona was previously on
the Board of Rössing Uranium and alternate director for ERA uranium.
Mike has over 30 years in mineral exploration leading greenfields and brownfields
programs with BHP, Rio Tinto, Comalco and most recently, with Geoscience
Australia. He has served in management and technical roles for resource
identification and development in copper, lead and silver, along with oil and gas,
and laterite deposits. Mike is also a member of ASEG and AusIMM.
Alligator Corporate Presentation | September 2024 | ASX:AGE
Fundamentals point to stronger spot and term prices
Supply
Spot uranium in a multi-year bull market
• Structural supply deficit forecast through to at least 2029/30
• Fragile supply picture, with elevated geopolitical risks
• Heightened supply risk from major producers, with Kazatomprom
guiding to restricted production due to acid shortages and delays to
mine construction.
• Kazakhstan produces 44% of world’s uranium, and this is shipped
via Russia.
• US close to imposing sanctions on Russia
• Structural deficit even after prices have tripled
Demand
• At COP28, 22 countries agreed to triple nuclear power by 2050
• 2023 LT uranium contracts of 160 Mlbs highest since 2012
• SPUT purchased >60 Mlbs of uranium and steadily acquiring more
• Amazon’s acquisition of nuclear-powered data centre at Talen
illustrative of the rising demand for reliable 24/7 power for this
industry.
• Potential for SMRs to add to future demand
5
Alligator Corporate Presentation | September 2024 | ASX:AGE
Source: Trading Economics
Prices
• Spot price doubled in ~12 months from US$50 / lb
to recent peak of US$106 / lb.
• Long term price now estimated at
– US$80 / lb (Trade Tech)
– US$75 / lb (UxC)
Uranium and Nuclear Fuel - Commodity Price Drivers
• Primary mine supply, mine re-starts, new mines under
development plus new planned mines still potentially not
adequate for future supply.
• New mines are and will take longer to market due to
approvals, development and design skills needed, financing
and politics.
• Utility fuel buyers running inventories very low to avoid /
delay coming to market while prices high.
• Due to relatively low impact of U prices on nuclear costs,
largely inelastic demand despite rising prices.
• Existing producers will find ways to extend mine life,
however will also take time.
• Faster to build a nuclear plant in China and India than it is to
start a uranium mine in Australia.
6
Alligator Corporate Presentation | September 2024 | ASX:AGE
Australian Uranium
Projects
7
Alligator Corporate Presentation | September 2024 | ASX:AGE
Samphire Uranium project: South Australia – experience in uranium
8
Alligator Corporate Presentation | September 2024 | ASX:AGE
Samphire Uranium Project,
South Australia
9
Alligator Corporate Presentation | September 2024 | ASX:AGE
Samphire Highlights
20kms from
Whyalla, SA
JORC compliant
resource
Regional exploration
opportunities
Excellent regional
infrastructure and
skilled labour-force
17.5 Mlbs uranium resource
with significant scope for
further growth
Exploration Target
estimates additional
14 - 75 Mlbs
Note: the potential quantity and grade of the Exploration Target is
conceptual in nature as there has been insufficient exploration to date to
estimate a Mineral Resource and it remains uncertain whether further
exploration will result in the estimation of a Mineral Resource
Robust Scoping Study1.2 Mlb / annum prod.
Pilot plant
planned
A$131m capex, 42% IRR,
and 2.45 yr payback
Fabricated and delivered to
site. Construction in Q4
subject to approvals
Refer ASX release 14 December 2023
“Scoping Study Update”
10 Alligator Corporate Presentation | September 2024 | ASX:AGE
ESG
Strong ESG credentials,
with environmental
commendation awarded by
SA government
Samphire Uranium project: A highly competitive ISR project
• Initial capital cost estimate of A$131 million is low,
despite significant contingencies and inflation totalling
35%.
• AISC at the lower end of cost curve, due to:
➢ In-situ Recovery (ISR) amenable,
➢ nature of the deposit, shallow depth, excellent
formation porosity, and
➢ high leaching dynamics.
• Location near Whyalla affords lower cost of key
infrastructure, locally based workforce (i.e. no FIFO or
camp), experienced mining services and business support.
• Expansion potential - Exploration Target Range (Dec 23)
estimating an additional 14 - 75 Mlbs on top of 17.5Mlbs
resource. Multi-year resource extension and step-out
drilling to increase mine life and production rate.
• Field Recovery Trial (derisking underway) on receipt of
regulatory approvals (approx. Q3), to de-risk project and
confirm parameters to be used in a full feasibility study
during 2025
11 Alligator Corporate Presentation | September 2024 | ASX:AGE
Conceptual Model of ISR
Samphire Uranium Project – Dec 2023 Scoping Study† : 1.2 Mlbs pa project
Study metrics* at US$75 / lb uranium price
A$131m
2.45 years
42%
A$257m
US$33.31/lb
US$16.06/lb
CAPEX
Payback
IRR*
NPV8*
AISC
Cash Costs
(post-tax, real,
ungeared)
(post-tax, real,
ungeared)
(A$47.58/lb)
(A$22.94 /lb)
(including contingency)
Study metrics* based on analysts current long-term price projections of US$90 / lb
A$131m
1.93 years
55%
A$371m
US$34.06/lb
US$16.06/lb
CAPEX
Payback
IRR*
NPV8*
AISC
Cash Costs
(post-tax, real,
ungeared)
(post-tax, real,
ungeared)
(A$48.96/lb)
(A$22.94/lb)
(including contingency)
† Ref ASX release 14 December 2023 “Scoping Study Update”: Alligator confirms that all material assumptions underpinning the ‘production target’ or the forecast financial information derived from the
‘production target’ continue to apply and have not materially changed other than the outlook for the long-term uranium price as set out above; *Calculated using 0.70 US/A$ exchange rate inclusion of significant
contingencies and inflation of 35%.
12 Alligator Corporate Presentation | September 2024 | ASX:AGE
Samphire Uranium Project - Scope to Scale & Optimise
Recent Scoping Study
update increased
production target to
1.2Mlbs pa. Future drilling
will target increased mine
life and/or production rate
Further extension potential
at the Blackbush deposit &
Plumbush prospect,
including regional
exploration on known
mineralised channels
Alligator Corporate Presentation | September 2024 | ASX:AGE
Modular plant for scalable
production capacity
Scope for processing
efficiencies, to reduce
costs for the Reverse
Osmosis (RO) plant and
also increasing recovery
rates
13
Samphire Uranium Project – Blackbush JORC Resource
JORC
Category
Mt
Grade
(U3O8 ppm)
U3O8 Metal
(KTonnes)
U3O8 Metal
(Mlbs)
Indicated
7.8
754
5.9
12.9
Inferred
4.6
447
2.1
4.6
Total
12.4
640
7.9
17.5
Ref: ASX Release 7 December 2023
14 Alligator Corporate Presentation | September 2024 | ASX:AGE
Samphire Uranium Project – Resource Growth Potential
Regional ground gravity showing potential palaeochannel extensions
Blackbush resource growth potential
• Coherent multi-level medium to high-grade zones with
current >2,700m cumulative strike, with widths of 300-450m.
Creating value through the drill bit
• Multi-year step-out drilling program planned
• Blackbush extension drilling underway for all of 2024
District-scale resource growth potential
• Balckbush resource growth
• Plumbush Prospect and extensions not adequately tested
• High-resolution ground gravity shows significant
palaeochannel extensions north and south of Blackbush.
64kms of known palaeochannels, with 58% unexplored.
• Potential for additional satellite deposits based on historical
mineralised intersections.
15 Alligator Corporate Presentation | September 2024 | ASX:AGE
Samphire Uranium Project – Exploration Target Range - up to 75 Mlb
Estimated
Tonnage (Mt)
Estimated Grade (ppm U3O8)
Min
Max
Min
Max
Average
Min
Max
Blackbush Extension 1
0.82
1.69
354
922
543
0.64
3.43
Blackbush Extension 2
2.09
4.94
382
697
487
1.76
7.59
North-eastern Channels
3.18
7.20
353
795
500
2.47
12.62
Eastern Channels
6.77
12.62
332
426
363
4.95
11.85
Plumbush
3.11
10.63
530
1676
912
3.63
39.28
14
75
Target Area
Blackbush North
Not included in Target Range
Central Channels
Not included in Target Range
Western Channels
Not included in Target Range
Plumbush Extended
Not included in Target Range
Far North
Not included in Target Range
Far South
Not included in Target Range
Estimated Exploration
Target Range (Mlb)
TOTAL
Refer ASX release 7 December 2023. – see Cautionary Statement on slide 10
Next Steps:
• Current exploration drilling within Blackbush Extension 1 & 2 areas.
• Multi-year plan to explore palaeochannels surrounding Blackbush and commence
greenfield exploration between the Blackbush & Plumbush target areas.
• Identify channel extensions within the Far North and South target areas from ground
gravity data recently acquired in these areas.
16 Alligator Corporate Presentation | September 2024 | ASX:AGE
Further Extensions outside the Exploration Target Range Envelope
Recent Ground Gravity Survey- April 2024
•
Data shows outstanding continuity of the Samphire
palaeochannel system by 34 lineal km’s.
•
50% increase to the existing 64km of palaeochannel strike
length.
•
Historical drillholes confirm that extensions contain the same
thick sequences of Kanaka Bed sands which host the
Blackbush Mineral Resource .
•
Multiple historical drillhole intersections (above 250ppm
eU3O8 cutoff) confirm that uranium is ubiquitous throughout
this system.
•
72% (over 70km) of the prospective areas of the entire
Samphire palaeochannel system remain completely untested
by drilling.
•
Significant potential for new discoveries and resource growth
in the Project area.
Refer ASX Announcement 2 May 2024
17 Alligator Corporate Presentation | September 2024 | ASX:AGE
Samphire Uranium Project – Field Recovery Trial (FRT)
• Field Recovery Trial (FRT) construction targeted for Q4,
pending regulatory approvals. Plant full fabricated and
delivered to site.
• In operation for 3-4 months and consists of three producing
well patterns and a containerised pilot plant.
• FRT is designed to confirm key parameters and marks an
important step toward development.
• Parameters to be assessed include in-situ chemistry,
hydrogeology, uranium recovery, reagent usage, and other
environmental and economic factors.
• Data and learnings further de-risk the Project and provides the
necessary inputs to a full feasibility study and Mining Lease
Application during 2025.
18 Alligator Corporate Presentation | September 2024 | ASX:AGE
Wellhouse (Pipe room) Module
Samphire Uranium Project – Field Recovery Trial Plant
• Fabrication of the containerised FRT processing
Pilot plant layout
plant complete, factory acceptance testing
complete and now delivered to site.
• Post completion the plant will be transported to
Whyalla ahead of securing the necessary
approvals to conduct the trial.
• Scope of work for on-site assembly being
prepared for quotation from Whyalla-based
construction contractors/businesses.
• Commissioning and operating plans are under
development for initiation.
• Post-FRT and subject to further testing, well
infrastructure and plant removed, and area
rehabilitated – pilot plant available for future
satellite field testing.
19 Alligator Corporate Presentation | September 2024 | ASX:AGE
Ion Exchange Module
Wellhouse Module (pipe room)
Delivered to site
Exploration projects
NT, AUSTRALIA
ITALY
Piedmont NW
Alligator Rivers
(ARUP)
High Grade U
Ni-Co-Cu-Au-PGEs
SA, AUSTRALIA
Big Lake
(Cooper Basin)
ISR style U
20 Alligator Corporate Presentation | September 2024 | ASX:AGE
Alligator Rivers Uranium Province, NT
• Three projects: Nabarlek North, Tin Camp Creek and
Beatrice, in Australia’s premier high-grade uranium
province.
• Province is host to existing high-grade deposits
including Jabiluka (358Mlb @ 5,300ppm U3O8).
• Multiple uranium targets in well-defined regional
uranium bearing zone including the Caramal Resource
6.5 Mlbs U3O8 @3,100ppm.
• Nabarlek North is the current focus of exploration
program – including northerly extensions to the U40
Prospect*, based on 2023 results (AGE and 3rd party).
• A small field program will be carried out on the Tin
Camp Creek project in 2024 to revisit preferred targets
for future work.
* Includes 6.3m at 7.23% U3O8 and 8.3m @ 2.12% Cu (Uranium Equities Ltd now DevEx
Resources Ltd release – 4 October 2017).
Alligator Corporate Presentation | September 2024 | ASX:AGE
Alligator Rivers Uranium Province, NT
2024 Work Program at Nabarlek North:
• New high resolution airborne magnetic / radiometric survey to
Focus drilling areas, 2024
better define key structures and host stratigraphy across the
entire tenure (completed July 2024)
• Reconnaissance mapping of outcrop throughout northern half
to ‘truth’ regional stratigraphic knowledge and tie geophysical
data.
• An RC drilling program of ~ 25 holes with an average depth of
150 m focussed on 5 – 6 areas across the tenement
(commenced August 2024).
• Includes further work at U40 North – to follow up last year’s
intercept and ‘chase’ system to the north.
• Another two RC targets picked up from 2022 – 2023
sampling program
• Drilling / geophysics programs co-funded with NT Govt as
part of their 2024 ‘Resourcing the Territory’ Program
Alligator Corporate Presentation | September 2024 | ASX:AGE
U40 Prospect
Big Lake Uranium Project, SA
•
Overlies Cooper Basin in NW SA – unexplored for uranium
despite geological analogies to existing world-class ISR fields
in hydrocarbon basins in Kazakhstan, Wyoming and Texas.
•
Several potential uranium sources including; weathering /
leaching of underlying ‘hot’ granite suite or distal migration of
uranium bearing fluids toward basin depo-centres.
•
EM results and analysis of publicly available 2D seismic data
indicated potential presence of paleochannel systems.
2024 Big Lake Drilling Program:
•
Interpretation of seismic and other datasets towards a full 3D
basin model across the entire basin.
•
Selection of ~20 drill sites to test stratigraphy, paleochannel
model and qualities of U-trap rocks
•
•
•
Traditional Owner clearances for drill lines.
Engagement with other key stakeholders
Remote logistics considerations, including access to fuel,
water, accommodation and emergency support
Alligator Corporate Presentation | September 2024 | ASX:AGE
Big Lake Uranium - Inaugural Drilling Program Discovery Success
•
•
•
Alligator’s drilling program intersected significant thicknesses
of anomalous uranium mineralisation within interbedded
palaeochannel sand units in the Namba Formation.
Discovery is first proof of concept that significant uranium is
present within Lake Eyre basin sediments above the
hydrocarbon-rich Cooper Basin within potentially In-Situ
Recovery (ISR) amenable host and depths.
Initial preliminary estimates of the tenor of uranium grades
include:
•
AC24-021 20m @ 110 ppm U from 106m (inc. 1 m @
241 ppm U from 123m)
•
AC24-022
5 m @ 130 ppm U from 107 m
•
AC24-023
5 m @ 45 ppm U from 104 m
•
AC24-025
10 m @ 120 ppm U from 180 m
•
The indicative grade-thickness of two intersections is at or
near the economic cut off used at the Company’s Samphire
ISR uranium project near Whyalla, SA.
•
Indicative uranium grades found in these
approximately 10 to 50 times background levels.
Alligator Corporate Presentation | September 2024 | ASX:AGE
holes
are
Refer ASX release 13 August 2024
Big Lake Uranium - Next Steps: 2024 - 2025
•
•
•
•
•
•
•
All samples of mineralised horizons have been sent for
detailed elemental analysis. Results expected within 4
– 6 weeks (~ end September / October).
Full analysis of data, including refinement of the
geological model across the basin.
Sample analysis for evidence of oxidation/reduction
front and mineral migration vectors to confirm and
refine trap /paleochannel model.
Detailed review of petroleum wells across the most
prospective sections of the basin looking for equivalent
signs of intercepts based on litho and gamma logs.
Commencement of government approvals and initiate
heritage clearances for follow-up drilling, early 2025.
Considerations for another ~ 5 – 10 target areas
(including follow-up on Area 10) possibly with mudrotary drilling to enable wireline logging (gamma, sonic,
PFN) and better quality of sample return.
Work towards drilling program over 2 months starting
Q1 of 2025
Alligator Corporate Presentation | September 2024 | ASX:AGE
Investment into EnviroCopper Ltd ISR copper, SA
• Alligator expanded energy minerals interests with $0.9M strategic
investment in private group, EnviroCopper (ECL), with option up to
50.1%.
• This investment and resultant collaboration is extremely
complimentary to our existing and substantial in-house ISR expertise.
• Provides exposure to In-Situ Recovery (‘ISR’) copper project portfolio
(over 200kt Cu resource) and experienced ISR and research team.
• Advancing ISR trials at Kapunda copper project - similar plans for
Alford West copper project. BHP funding field trials at Kapunda for IP
access.
• ISR successfully used to extract copper in projects in Australia and the
US - offers distinct advantages and environmental benefits.
• ECL has undertaken significant exploration, R&D and approvals for
test work into ISR of shallow fractured rock aquifer hosted oxide
copper deposits.
26 Alligator Corporate Presentation | September 2024 | ASX:AGE
ESG in practice: Working with Stakeholders
• We aim to add value in all of our decision-making for shareholders.
Shareholders
• We wish to provide an engaging, challenging, enjoyable and
respectful workplace for our employees.
• We respect the rights of landowners and communities and seek to
Team
Communities
collaborate for our mutual benefit.
Stakeholder
Perspective
• We respect the cultural heritage and connection to country of
Traditional Owners and wish to create mutually beneficial
opportunities.
• We aim for a low impact on the environment, through innovation, use
of latest technology, and responsible land management techniques.
Focus on
Environment
Landowners
Traditional
Owners
Our aim is to discover, source and economically extract these needed commodities with an innovative approach,
with either zero or minimal impact, and with positive value and experience for our stakeholders and communities.
27 Alligator Corporate Presentation | September 2024 | ASX:AGE
ESG in Practice
Samphire Project
• Completed remaining historical rehabilitation during project acquisition
• Ongoing drill hole rehab – targeting lifting of bush density to double the existing
• Early and ongoing engagement with pastoralists, Indigenous group, Whyalla community
• Working with pastoralists for weed and pest control, and with rangeland improvement
initiatives
• Early initiatives for low impact site facilities, sustainable energy opportunity
Alligator Rivers
• Over 40 indigenous employees on drilling and exploration programs over 10 years
• On country work and support for indigenous ranger groups – even when not exploring
• Nabarlek North agreement – potential for TO groups to become 25% partner
• Drilling at Nabarlek North in 2022/23– Indigenous owned and operated drilling company
• Exploration rehabilitation after each program
Big Lake Uranium
• Full draft agreement with YYTLOAC indigenous group
• Engagement and cultural clearance programs
• Direct indigenous employment from first program in 2024
Alligator Corporate Presentation | September 2024 | ASX:AGE
Samphire Uranium Project: Opportunity for a near carbon-free energy project
• Lower power consumption as ISR method has no rock /
material movement, nor crushing / grinding of rock.
Renewable power with backup may be adequate?
• Distance to Whyalla may allow all electric vehicles, light
trucks, cranes etc to be used?
• Advances in battery on-highway prime movers may support
the level of logistics and product transport needed?
• This potential opportunity aligns with SA Government
Hydrogen Hub for Whyalla region and extensive potential
renewable projects.
• We will be scoping this opportunity in parallel with our
feasibility and economic studies.
29 Alligator Corporate Presentation | September 2024 | ASX:AGE
2024 / 2025 News Flow
Recent releases
2024 1st Half
2024 2nd Half
2025
• First round extension
• Inaugural Big Lake (BLU) Drilling
• Samphire Retention Lease Approval
• Commencement of field
drilling at Blackbush
(Samphire)
• Ground Gravity
Program – extending
current paleochannel
system
Program commenced
• Samphire Retention Lease Approval
and assessment ongoing
• Ongoing resource extension and
step out drilling at Blackbush
• Initiation of targeted Nabarlek North
2024 Field Program
(subject to SA Govt decision)
• Commence FRT construction
(subject to approvals)
• Results of the BLU uranium
discovery and next steps
• Nabarlek North drilling results
• Updated Blackbush JORC resource
estimate
• Uranium marketing plan
circulation trial (FRT)
• Feasibility scope and
early work packages
• Award and commence
Feasibility Study
• Mining lease approval
documentation and
submission - late year
• Potential initial
conditional sales
offtake agreement(s) to
support project
financing