June Quarterly Activities Report & Appendix 5B Cashflow
Released
Released
Announcement PDF
QUARTERLY ACTIVITIES
REPORT
FOR QUARTER ENDED 30 June 2015
Alligator Energy
HIGHLIGHTS
ABN 79140575604
Suite 3
36 Agnes Street
Fortitude Valley, QLD 4006
EXPLORATION
Field program commences – Phase 1 program defining priority drill targets on Beatrice
JV and Tin camp Creek Projects using advanced geophysical and geochemical
techniques;
•
To date 1027 samples of covering sandstone have been collected for
radiogenic isotope analysis over 5 target areas
•
SAM geophysical surveys have been flown (1300 line km) over 7 target areas
looking for the conductive responses associated with large, concealed
uranium deposits
ASX Code: AGE
Phase 1 exploration results due first week of August.
Detailed ground radiometric survey defines strong radiometric anomaly south of
Beatrice Prospect. Peak of anomaly trends to the south and is coincident with SAM
Radiometric and SAM anomalies indicate high grade mineralisation may extend under
cover to the south and are untested by previous drilling.
Reconnaissance rock sampling located outcropping uranium mineralisation two
kilometres north west of Beatrice the significance of which is still being assessed.
Drilling is planned to commence in early September.
CORPORATE
Mr Greg Hall is welcomed to the Board of Alligator Energy Ltd.
Ph: (07) 3852 4712
Fax: (07) 3852 5684
Number of Shares:
311.5M Ordinary Shares
16.2M Unlisted Options
Board of Directors:
Mr John Main
(Chairman)
Mr Robert Sowerby
(CEO, Director)
Mr Paul Dickson
(Non Exec. Director)
Mr Peter McIntyre
(Non Exec. Director)
Mr Andrew Vigar
(Non Exec. Director)
Mr Greg Hall
(Non Exec. Director)
Company maintains a solid cash position, $2.36m at 30 June 2015.
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 30 June 2015
1
EXPLORATION ACTIVITIES
Exploration programs commenced across the company’s three uranium tenements; Tin Camp Creek,
Beatrice and Mamadawerre, in Arnhem Land, in the Northern Territory (see Figure 1, Project Location Map).
Figure 1: June Quarter survey areas
Beatrice Project
The Beatrice Project is a Joint Venture between Alligator and Cameco Australia Pty Ltd (Cameco) where
Alligator may earn a 51% interest in the Beatrice tenement by expending $250,000 by 2 July 2016.
Work conducted during the June Quarter has consisted of:
•
•
•
Ground radiometric surveys, sampling and mapping over the Beatrice prospect and other known uranium
anomalies
SAM geophysical surveys over the Beatrice prospect, and the BT-1 and BT-3/4 target areas
Radiogenic isotope sampling programs over the same target areas
Results as reported in ASX release 11 June 2015 show:
A detailed ground radiometric survey at the Beatrice prospect was undertaken to define in greater detail a
strong radiometric anomaly associated with the known mineralisation. The survey showed the peak of the
anomaly to be trending north-south coincident with both magnetic and SAM geophysical features giving great
confidence that the outcropping mineralisation may exist under the soil cover several hundred metres to the
north and south. These potential extensions represent excellent drill targets.
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 30 June 2015
2
Figure 2: Beatrice prospect – Current work area showing results from June Quarter radiometric surveys.
Reconnaissance mapping and surface rock sampling undertaken on five known radiometric anomalies to the
north of the Beatrice prospect as part of a systematic survey of radiometric anomalies on the Beatrice Project
area showed two had uranium mineralisation and were worthy of further work. Also uranium mineralisation has
been identified two kilometres NNW of the Beatrice prospect in a N-S trending fault zone that has no
associated airborne radiometric anomaly. Uranium values up to 1,934ppm U3O8 were returned (refer ASX
Announcement 10 June 2015). These occurrences are being covered in the current SAM geophysical surveys.
Inspection of radiometric anomalies in the northern part of the Beatrice Project area identified radiogenic
groundwater emanating from the Beatrice Fault suggesting a source of uranium nearby. This area will be
covered by both SAM geophysical and radiogenic isotope sampling.
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 30 June 2015
3
Tin Camp Creek Project
Work carried out during the quarter included:
•
•
•
SAM geophysical surveys over the TCC-2, TCC-4 and TCC-13 target areas; preliminary results have
been received
Infill Radiogenic isotope sampling programs in the TCC-2 target area; results awaited
Radiogenic isotope analysis of existing core to refine three dimensional models of radiogenic isotope
distribution and decay in the covering sandstone
The TCC-4 and TCC-13 target areas incorporate the Orion South and Mintaka prospects areas respectively.
Extensive radiogenic isotope sampling of the covering sandstone undertaken in 2014 has identified first-order
anomalies to the west of these prospects. High grade mineralisation has previously been intersected at the
South Horn and Mintaka indicating a metal rich environment. The focus of the current detailed SAM surveys is
to identify conductors and structures under the sandstone cover rocks which may reflect high-grade uranium
mineralisation within basement host rocks.
The TCC-2 prospect (also called the Pterodactyl prospect) is located north of the Orion North and NE Myra
prospect areas which were drill tested in 2014 revealing narrow zones of uranium mineralisation. It is a welldefined linear, radiogenic isotope anomaly in surface sandstone samples and drill core stretching over 1200
metres. The objective of the current SAM geophysical survey in this area is to define a basement conductor
reflecting a large uranium source for this anomaly and the radiogenic water emerging in springs at the base of
the sandstone.
Mamadawerre Project
Mapping and surface sampling for radiogenic isotope analysis was undertaken during the June Quarter to
follow up anomalies identified by the 2014 VTEM survey. The focus of work was an area defined by the
intersection of the Goomadeer and Steptoe Fault zones. Further work will be planned once final results have
been received and collated.
Community and Environment
Annual consultation meetings with the Traditional Owners of the land incorporated in Alligator’s Project areas
facilitated by the Northern Land Council (NLC) were held in April and May. Alligator considers the outcomes of
these meetings to have been positive and constructive with valuable input from the Traditional Owners on a
number of issues including access options for the Beatrice Project area.
Alligator has also been involved and supported efforts of the Traditional Owners to manage mission grass
infestations in the Beatrice and Tin Camp Creek areas as part of the protection and management of their
country.
Research and Development (R&D)
Alligator’s R&D program is focused on developing innovative techniques for exploration targeting for
unconformity uranium deposits. Additional radiogenic isotopes of sandstone core samples above known
basement uranium occurrences in the Tin Camp Creek and Mamadawerre Project areas were sent for
analysis. This will permit building of three-dimensional models of radiogenic isotope distribution and decay and
allow smarter interpretation of radiogenic isotope data from all samples collected in the quarter.
Experimentation with both the SAM and FLEM (Fixed Loop Electromagnetics) methods was undertaken to
determine the most effective electrode configurations to maximise response from concealed basement rocks.
Advanced techniques for processing late time signal decay responses from SAM/TFEM (Total Field
Electromagnetic) surveys are also being trialled.
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 30 June 2015
4
CORPORATE
Cash at Bank
The Company has maintained a sound cash position and as at 30 June 2015, had cash reserves of $2.36
million. Further details of the cashflow for the quarter are included in the Appendix 5B.
Director Appointment
Subsequent to the end of the Quarter, the Company announced the appointment of Greg Hall as a nonexecutive director.
Greg joined the Company after more than 27 years’ experience as an executive in the resources sector. His
experience includes employment with large listed companies such as North, WMC and Rio Tinto as well as
listed juniors such as Toro Energy and Hillgrove Resources.
Importantly Greg has a deep understanding of the uranium sector through his role as Marketing Manager for
ERA/Rio Tinto Uranium and the evaluation/approval of WA’s first fully uranium project (as MD and NonExecutive Director) with Toro Energy Ltd.
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 30 June 2015
5
Competent Person’s Statement
Information in this report is based on current and historic Exploration Results compiled by Mr Rob Sowerby who is a
Member of the Australasian Institute of Geoscientists. Mr Sowerby is CEO and Director of Alligator Energy Ltd, and has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Sowerby consents to the inclusion in this
release of the matters based on his information in the form and context in which it appears.
About Alligator Energy
Alligator Energy Ltd is an Australian, ASX listed, exploration company with uranium exploration tenements in the world
class Alligator Rivers Uranium Province in Arnhem Land, Northern Territory. The Alligator Rivers Uranium Province
hosts nearly 1 billion pounds of high grade uranium resources and past production, including the Ranger Mine and
Jabiluka. Since listing in February 2011, the company has completed in excess of 15,000m of drilling, defined a maiden
high grade, JORC compliant resource at Caramal (6.5Mlb U3O8 at 3100ppm U3O8) and discovered new mineralization
at Mintaka and Orion East. High Grade mineralization also occurs at the historic South Horn and Gorrunghar prospect
which remain only partially tested.
The company has in excess of 1000km2 of Exploration Licence applications and is also in Joint Venture with Cameco
Australia Pty Ltd for the Mamadawerre Project and Beatrice Project, also within the Alligator Rivers Uranium Province.
Project Location Diagrams and Exploration Licences
FOR FURTHER INFORMATION, PLEASE CONTACT
Mr Rob Sowerby
Chief Executive Officer
Alligator Energy Ltd
Email: info@alligatorenergy.com.au
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 30 June 2015
6
Appendix 5B
Mining exploration entity quarterly report
Rule 5.3
Appendix 5B
Mining exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10
Name of entity
ALLIGATOR ENERGY LTD
ABN
Quarter ended (“current quarter”)
79 140 575 604
30 June 2015
Consolidated statement of cash flows
Cash flows related to operating activities
1.1
Receipts from product sales and related
debtors
1.2
Payments for (a) exploration & evaluation
(b) development
(c) production
(d) administration
Dividends received
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes (paid)/ received- R&D
Other (provide details if material)Collaborative NTGS Grants
1.3
1.4
1.5
1.6
1.7
Current quarter
$A’000
Year to date
$A’000
-
-
(718)
(170)
25
(3,655)
(894)
79
471
1,029
35
70
(357)
(3,371)
(63)
(63)
(146)
20
(126)
(420)
(3,497)
Net Operating Cash Flows
1.8
1.9
1.10
1.11
1.12
1.13
Cash flows related to investing activities
Payment for purchases of: (a) prospects
(b) equity investments
(c) other fixed assets
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
Loans to other entities
Loans repaid by other entities
Other - Security Deposits
Net investing cash flows
Total operating and investing cash flows
(carried forward)
+ See chapter 19 for defined terms.
17/12/2010 Appendix 5B Page 1
Appendix 5B
Mining exploration entity quarterly report
1.13
(420)
(3,497)
29
29
4,100
(289)
3,811
Net increase (decrease) in cash held
(391)
314
1.20
1.21
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
2,754
2,049
1.22
Cash at end of quarter
2,363
2,363
1.14
1.15
1.16
1.17
1.18
1.19
Total operating and investing cash flows
(brought forward)
Cash flows related to financing activities
Proceeds from issues of shares, options, etc.
Proceeds from sale of forfeited shares
Proceeds from borrowings
Repayment of borrowings
Dividends paid
Other - Capital Raising Costs
Net financing cash flows
Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the
related entities
Current quarter
$A'000
1.23
Aggregate amount of payments to the parties included in item 1.2
90
1.24
Aggregate amount of loans to the parties included in item 1.10
Nil
1.25
Explanation necessary for an understanding of the transactions
Directors’ fees, salaries and superannuation totalled $90k before amounts then used to subscribe for ordinary
shares in the Company under the Directors’ Fee Plan approved at the AGM on 21 November 2014 which
totalled $29.3k.
Non-cash financing and investing activities
2.1
Details of financing and investing transactions which have had a material effect on
consolidated assets and liabilities but did not involve cash flows
Nil
2.2
Details of outlays made by other entities to establish or increase their share in projects in
which the reporting entity has an interest
Nil
+ See chapter 19 for defined terms.
Appendix 5B Page 2
17/12/2010
Appendix 5B
Mining exploration entity quarterly report
Financing facilities available
Add notes as necessary for an understanding of the position.
3.1
Loan facilities
3.2
Credit standby arrangements
Amount available
$A’000
-
Amount used
$A’000
-
-
-
Estimated cash outflows for next quarter
$A’000
1,318
4.1
Exploration and evaluation
4.2
Development
-
4.3
Production
-
4.4
Administration
281
1,599
Total
Reconciliation of cash
Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows)
to the related items in the accounts is as follows.
5.1
Cash on hand and at bank
5.2
Deposits at call
5.3
Bank overdraft
5.4
Other (provide details)
Current quarter
$A’000
Previous quarter
$A’000
314
445
2049
2,309
-
-
-
-
2,363
2,754
Total: cash at end of quarter (item 1.22)
Changes in interests in mining tenements
Tenement
reference
6.1
Interests in mining
tenements relinquished,
reduced or lapsed
NIL
6.2
Interests in mining
tenements acquired or
increased
NIL
+ See chapter 19 for defined terms.
17/12/2010 Appendix 5B Page 3
Nature of interest
(note (2))
Interest at
beginning
of quarter
Interest at
end of
quarter
Appendix 5B
Mining exploration entity quarterly report
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
Total number
7.1
7.2
7.3
7.4
7.5
7.6
7.7
Preference +securities
(description)
Changes during quarter
(a) Increases through
issues
(b) Decreases through
returns of capital, buybacks, redemptions
+Ordinary securities
Changes during quarter
(a) Increases through
issues
(b) Decreases through
returns of capital, buybacks
+Convertible debt
Number
quoted
NIL
NIL
311,200,459
311,200,459
668,500
668,500
-
-
NIL
NIL
securities (description)
Changes during quarter
(a) Increases through
issues
(b) Decreases through
securities matured,
converted
Options (description
and conversion factor)
Amount paid
up per security
(see note 3)
(cents)
4.3 cents
4.3 cents
Exercise price
Expiry date
6,250,000
2,000,000
700,000
1,000,000
2,205,882
2,035,648
2,035,648
-
$0.20
$0.25
$0.15
$0.00
$0.00
$0.00
$0.00
21 Nov 2015
30 Nov 2015
7 Mar 2017
2 May 2017
26 Nov 2017
31 Jan 2016
21 April 2018
2,035,648
2,035,648
-
$0.00
$0.00
31 Jan 2016
21 April 2018
-
-
7.8
Issued during quarter
7.9
7.10
Exercised during quarter
Expired during quarter
-
-
7.11
Debentures
(totals only)
Unsecured notes (totals
only)
NIL
NIL
NIL
NIL
7.12
Issue price per
security (see
note 3) (cents)
+ See chapter 19 for defined terms.
Appendix 5B Page 4
17/12/2010
Appendix 5B
Mining exploration entity quarterly report
Compliance statement
1
This statement has been prepared under accounting policies which comply with
accounting standards as defined in the Corporations Act or other standards
acceptable to ASX (see note 5).
2
This statement does give a true and fair view of the matters disclosed.
Mike Meintjes
Company Secretary
30 July 2015
Notes
1
The quarterly report provides a basis for informing the market how the entity’s
activities have been financed for the past quarter and the effect on its cash
position. An entity wanting to disclose additional information is encouraged to
do so, in a note or notes attached to this report.
2
The “Nature of interest” (items 6.1 and 6.2) includes options in respect of
interests in mining tenements acquired, exercised or lapsed during the
reporting period. If the entity is involved in a joint venture agreement and
there are conditions precedent which will change its percentage interest in a
mining tenement, it should disclose the change of percentage interest and
conditions precedent in the list required for items 6.1 and 6.2.
3
Issued and quoted securities The issue price and amount paid up is not
required in items 7.1 and 7.3 for fully paid securities.
4
The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of
Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.
5
Accounting Standards ASX will accept, for example, the use of International
Financial Reporting Standards for foreign entities. If the standards used do not
address a topic, the Australian standard on that topic (if any) must be complied
with.
== == == == ==
+ See chapter 19 for defined terms.
17/12/2010 Appendix 5B Page 5
Share your feedback
Discover