Alligator Rivers Projects - 2024 Exploration Results
Released
Released
Announcement PDF
ASX Announcement
1 April 2025
Alligator Rivers Projects – 2024 Exploration Results
Alligator Energy (ASX: AGE, ‘Alligator’ or ‘the Company’) is pleased to announce the results of
its 2024 exploration program in the Alligator Rivers Uranium Province (“ARUP”) spanning the
Nabarlek North (NN) and Tin Camp Creek (TCC) Projects.
Highlights
• Completion of 3,526m RC drilling across the Nabarlek North Project spanning 22 holes.
• New mineralisation occurrence identified at Bully (~4 kms east of U40) with 1m @ 108ppm
U3O8 in NNRC24-019 from 83m.
o
While relatively small, its identification marks a new U occurrence completely
masked by Cretaceous cover along interpreted structure
• Surface sampling has identified multiple U anomalies across both the Nabarlek North and
TCC Projects including 4,120ppm U3O8 at the historic Gorrunghar Prospect.
•
U401 extension follow-up drilling has identified further mineralisation extending into the
Company’s tenure with 5 of 7 holes returning anomalous U3O8, with peak results of:
o
3m @ 260ppm U3O8 in NNRC24-031 from 45m (including 1m @ 570ppm)
• Structural and geological interpretation of 2024 airborne Magnetic and Radiometric survey
remains ongoing, with key features being identified for reconnaissance in 2025.
• Notable surface sampling results in other commodities include 3.16% Total Rare Earth
Oxides (TREO) and grab samples for High Purity Silica (HPS) returning 97.84% SiO2.
All results are currently being integrated with historic and AGE data to progress the Alligator Rivers
Projects exploration strategy for 2025 and beyond.
Greg Hall, Alligator CEO, said: “The ARUP team have delivered an excellent generative program
through the field work in 2024 and subsequent assay results received in Q1 2025. The identification of a
new uranium mineral occurrence below cover and 4kms away from known mineralisation is no small
achievement in this challenging Province and potentially opens up a large structural corridor for future
investigation.
The team have also undertaken some solid technical interpretation and database consolidation work
following acquisition of this new data, and the Rare Earths and High Purity Silica results also represent
some interesting insights to critical minerals potential in the province. The recent Boss Energy
announcement brings a fourth significant player into the Region and continues to highlight the interest
and potential of this world class uranium province.”
1 DevEx Resources Ltd ASX Release 6 December 2023, “Deep, High-Grade Uranium Intersected at U40” 61185041.pdf
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | +61 (0) 7 3839 3904
info@alligatorenergy.com.au | www.alligatorenergy.com.au | Page 1 of 17
ASX: AGE
Key Results from the 2024 Nabarlek North RC Drilling Program
As part of the 2024 Nabarlek North exploration program, a 22 hole 3,526m RC drilling program was
completed. Drilling was targeted across three exploration prospects, with 8 holes to the north of
previous exploration and 3 holes at the newly identified Bully prospect all supported by the NTs
Resourcing the Territory co-funding program. A further 11 holes were planned to test continuation
of the U40 prospect and to understand the structural and geological controls on this system. Seven
holes were directly planned along the U40 mineralisation trend, 1 hole adjacent to the west targeting
an AGE 2023 IP anomaly and 3 holes further NW along geological strike. All holes were sampled
and assayed using a 1 m sample every 15 metres at standardised fifteen-meter intervals from
surface to total depth in combination with selected interval samples based on geology and downhole
gamma / scintillometer results.
Of the 7 holes drilled along the U40 mineralisation trend, 5 identified minor anomalism (defined as
greater than 25ppm and less than 100ppm U3O8), above typical background levels of 0-5ppm U3O8.
This has extended the structural strike length over 130m north and has included a peak interval of
570ppm U3O8 in NNRC24-031. Key results from drilling can be seen below in Figure 1 with a table
of all drill holes and results in Table 1 (Appendix 1).
Figure 1. Plan view of AGE’s 2024 RC drilling and surface programs and results at the Nabarlek North Project.
2
Figure 1 above highlights key drilling results at U40 mineralisation trend and the newly identified
Bully mineralisation. The latter is an exciting development, identifying a new mineral occurrence
under cover with no radiometric response above. The mineralisation lies proximal to a complex
structural zone with no prior exploration undertaken in this area and is situated approx. 4km ENE of
U40. The Bully target was interpreted by high resolution magnetics acquired by AGE mid-2024 and
geochemical signatures from previous auger and aircore sampling.
The aim of further work will be to improve the geological interpretation around Bully for future targeted
drilling to include the Lower Cahill formation. Current drilling remains within Cahill formation but not
down to the more structurally ductile and potentially altered (by U-bearing fluids) Lower Cahill.
Regional drilling under the NT’s Resourcing the Territory co-funding was conducted in the north of
EL31480. Drilling in this region was designed to help understand basement geology below cover
with holes in the eastern side highlighting potassic altered granites to depth, while western holes
showed geological variations consistent with gneissic banding and Archean basement. This
indicates the geological setting is below preferred Lower Cahill while being a little high in the profile
to the south. Drilling did not identify any anomalous uranium and was supported by 50% co-funding
through the NT’s Resourcing the Territory program.
Surface 2024 Results and Exploration
In addition to the RC drilling program outlined above, AGE completed regional sampling, mapping
and reconnaissance programs at the Nabarlek North and Tin Camp Creek (TCC) Projects during
2024, focused on geological understanding and target generation. Figure 1 above details the
distribution and key highlights of surface sampling across the Nabarlek North Project. Three notable
uranium anomalies were identified with two on the western side of the tenement and one south of
the Bully mineralisation discovery, broadening future investigations and exploration potential around
this area.
In addition to uranium analysis, samples were also analysed for Rare Earth Elements (REE), with
the NT’s tropical climate and weathering profiles viewed as potential hosts for Ionic Adsorption style
clay hosted resources.
At the company’s TCC project a short surface sampling and reconnaissance program was
undertaken across some priority targets. Highlights of this sampling program are shown in Figure 2
below with peak U3O8 results of 4,120ppm from the Gorrunghar prospect where previous Alligator
drilling recorded 7m @ 2886ppm U3O8 (refer AGE ASX release 16 October 20132). This target combined with neighbouring prospects Gurri Garri and Mordijimuk represent a structurally complex
area with further scope for investigation at depth and along strike.
2 AGE ASX Release 16 October 2013: Phase 1 Drilling Results, Tin Camp Creek Project. 01453731.pdf
3
Figure 2. Plan view of AGE’s 2024 surface sampling program and results at the Tin Camp Creek project.
Another key target at TCC known as the Clowne was reconnoitred for access with several grab
samples collected for Pb isotope analysis infilling historic works. Interpretation of these results has
shown anomalous radiogenic lead from a uranium source within primary mineralisation age ranges
supporting historic target generation.
In addition to uranium exploration, a small sampling program over historic anomalous REE grab
samples at TCC has returned results of up to 3.16% Total Rare Earth Oxides (TREO) in surface
samples which appears to be hosted within a stratigraphic band of metamorphic Arkose. Rare earth
samples were submitted for ICP-MS analysis following a Lithium Borate digest (considered a total
digest method) at Bureau Veritas Adelaide with consideration of REEs occurring in resistive
minerals. No notable REE anomalism was recorded over the Nabarlek North Project during the 2024
work program.
Opportunistic grab samples during reconnaissance also highlight the potential for high purity silica
(HPS) to occur in the region through massive quartz veining. Two samples were collected over 8km
apart in separate vein systems returning up to 97.84% SiO2 through whole rock XRF analysis by
Bureau Veritas Minerals. HPS appears to be gaining some attention with uses in specialist
technologies and chips for AI and solar cells in the renewable sector. While 98% SiO2 is preferred in
industry, better sampling procedures and handling could potentially improve results and
understanding of the potential.
4
Alligator will be seeking specialist consulting expertise to advance understanding of these results,
including reviewing the detailed assays and potential rare earth metal groupings.
The key surface assay results with respect to U, REE and HPS are listed in the tables below.
Key U assay results from surface sampling
(assay reported >15ppm U3O8)
Project
Prospect
Samp ID
Type
U3O8_ppm
TCC
Gorr
TC24-005
SOIL
4209.89
Gorrunghar surface sample from costeen, known U occurrence
TCC
Area 84
TC24-086
ROCK
405.66
Mordijimuk - historic known U occurrence
TCC
Gurrigarri
TC24-088
ROCK
267.69
GurriGarri known U occurrence
TCC
Area 84
TC24-085
ROCK
179.24
Mordijimuk - historic known U occurrence
TCC
Kukalak
TC24-036
ROCK
175.71
Sample on Caramal road. Western edge of Caramal
TCC
Area 84
TC24-076
ROCK
103.54
Mordijimuk - historic known U occurrence
TCC
Kukalak
TC24-065
ROCK
95.05
Ancillary U with REEs and Th
TCC
Kukalak
TC24-079
ROCK
84.2
Ancillary U with REEs and Th
TCC
Kukalak
TC24-028
ROCK
67.57
Ancillary U with REEs and Th
TCC
Kukalak
TC24-050
ROCK
62.62
Ancillary U with REEs and Th
TCC
Kukalak
TC24-078
ROCK
62.5
Ancillary U with REEs and Th
TCC
Kukalak
TC24-061
ROCK
61.79
Ancillary U with REEs and Th
TCC
Kukalak
TC24-069
ROCK
46.93
Ancillary U with REEs and Th
TCC
Kukalak
TC24-058
ROCK
46.11
Ancillary U with REEs and Th
TCC
Kukalak
TC24-080
ROCK
36.67
Ancillary U with REEs and Th
TCC
TC24-038
ROCK
35.14
Ancillary U with REEs and Th
TC24-010
SOIL
35.02
Regional sampling along Caramal fault
TCC
Kukalak
Robbies
Rd
Kukalak
TC24-030
ROCK
31.84
Ancillary U with REEs and Th
TCC
Kukalak
TC24-077
ROCK
31.72
Ancillary U with REEs and Th
TCC
Kukalak
TC24-032
ROCK
30.31
Ancillary U with REEs and Th
TCC
Comments
Key REE assay results from surface sampling
(assay reported >200ppm MREO)
Project
Prospect
Samp ID
Type
TREO_ppm
MREO_ppm
Comments
TCC
Kukalak
TC24-036
ROCK
31551.79
6813.79
REEs adjacent to Caramal = over 3% REEs
TCC
Kukalak
TC24-065
ROCK
29647
6295.72
REEs adjacent to Caramal
TCC
Kukalak
TC24-079
ROCK
19799.35
4460.37
REEs adjacent to Caramal
TCC
Kukalak
TC24-028
ROCK
17315.15
3838.02
REEs adjacent to Caramal
TCC
Kukalak
TC24-078
ROCK
13366.87
2958.22
REEs adjacent to Caramal
TCC
Kukalak
TC24-058
ROCK
13298.6
2942.68
REEs adjacent to Caramal
TCC
Kukalak
TC24-050
ROCK
11301.93
2509.79
REEs adjacent to Caramal
TCC
Kukalak
TC24-061
ROCK
10312.62
2295.12
REEs adjacent to Caramal
TCC
Kukalak
TC24-069
ROCK
9568.07
2123.64
REEs adjacent to Caramal
TCC
Kukalak
TC24-080
ROCK
7799.72
1727.92
REEs adjacent to Caramal
TCC
Kukalak
TC24-030
ROCK
7251.17
1626.01
REEs adjacent to Caramal
TCC
Kukalak
TC24-032
ROCK
4752.62
1066.39
REEs adjacent to Caramal
TCC
Kukalak
TC24-077
ROCK
3039.21
661.9
REEs adjacent to Caramal
TCC
Kukalak
TC24-072
SOIL
3374.45
657.7
REEs adjacent to Caramal
5
TCC
Kukalak
TC24-074
ROCK
2639.19
592.46
REEs adjacent to Caramal
TCC
Kukalak
TC24-075
ROCK
2287.02
511.36
REEs adjacent to Caramal
TCC
Kukalak
TC24-082
SOIL
2284.53
504.85
REEs adjacent to Caramal
TCC
Kukalak
TC24-064
SOIL
2035.58
450.78
REEs adjacent to Caramal
TCC
Kukalak
TC24-081
SOIL
1963.1
431.4
REEs adjacent to Caramal
TCC
Kukalak
TC24-063
SOIL
1592.97
345.55
REEs adjacent to Caramal
NN
RAD4
SR24-013
ROCK
1263.58
344.05
REEs in Cretaceous cemented siltstone
TCC
Kukalak
TC24-083
SOIL
1339.41
293.21
REEs adjacent to Caramal
TCC
Kukalak
TC24-084
SOIL
1260.22
272.69
REEs adjacent to Caramal
NN
HIN1
SR24-231
ROCK
898.13
237.56
NE of Hin1 Far north of NN project
Key HPS assay results from surface sampling
Project
TCC
TCC
Prospect
Robbies
road
Random
Samp ID
Type
SiO2_%
Fe_%
Comments
TC24-011
ROCK
97.84
1.74
Spot grab sample en-route to Robbie’s Prosepct.
TC24-007
ROCK
97.12
2.06
Random Grab Sample from TCC1 valley scouting NW 24921
Background to Nabarlek North Project and Aims
The Nabarlek North Project represents a highly prospective under-explored region within the ARUP
(Figure 3), typified by the presence of an exhumed Proterozoic unconformity and enough cover
sediments to mask bedrock radiometric signatures and discouraged past exploration. Alligator
started in 2022 not knowing if there were fertile geological formations present in the Project area.
Historical data has largely been ambivalent with regards to bedrock geology, and it has been widely
assumed that the Project is underpinned by the barren Nimbuwah Complex granites and gneisses,
rather than the fertile Cahill Formation that host most of the economic orebodies in the ARUP.
The Project is located less than 7km north of the historic Nabarlek uranium mine which produced
24Mlb of U3O8 at an average grade of 1.84%(1). The U40 Prospect, located 200m south of Alligator’s
southern tenement boundary, has historically reported grades of up to 6 m @ 7.6% U3O8(1)
demonstrating high-grade occurrences proximal to the Nabarlek North Project.
The work carried out in 2022 through to 2023 was the Company’s first foray into this Project and was
designed to establish in an inexpensive manner testing for fertile geological formations and
structures under the thin cover. This work showed that previous interpretations are incorrect and that
the fertile Cahill Formation is likely to be widely present but segmented by regional scale structures
capable of ‘plumbing’ a uranium mineralising system.
6
Figure 3: Location of the Nabarlek North work area and Alligators ARUP Project tenure in the NT
Alligator believes that armed with the right datasets and a predictive geological model, we will be
able to take advantage of simple and inexpensive exploration techniques to make a discovery
through thin cover. While sandstone cover and the associated unconformity have previously been
seen as essential ingredients to the mineralisation model in Arnhem Land, the identification of
mineral resources and occurrences at depth below the unconformity such as Ranger 3-Deeps,
demonstrate it is not essential. Alligator will not only be exploring the possibility of extensions of the
U40 Prospect mineralised system into the Nabarlek North tenement package but also be pursuing
identification of new uranium systems further north where Cahill Formation is now interpreted
beneath unexplored cover.
This announcement has been authorised for release by the Alligator Energy CEO.
7
Contacts
For more information, please contact:
Mr Greg Hall
Mr Mike Meintjes
CEO & Director
CFO & Company Secretary
gh@alligatorenergy.com.au
mm@alligatorenergy.com.au
For media enquiries, please contact:
Alex Cowie
Media & Investor Relations
alex@nwrcommunications.com.au
This announcement contains projections and forward-looking information that involve various risks and uncertainties
regarding future events. Such forward-looking information can include without limitation statements based on current
expectations involving a number of risks and uncertainties and are not guarantees of future performance of the Company.
These risks and uncertainties could cause actual results and the Company’s plans and objectives to differ materially from
those expressed in the forward-looking information. Actual results and future events could differ materially from anticipated
in such information. These and all subsequent written and oral forward-looking information are based on estimates and
opinions of management on the dates they are made and expressly qualified in their entirety by this notice. The Company
assumes no obligation to update forward-looking information should circumstances or management’s estimates or opinions
change.
Competent Person’s Statement
Information in this report is based on current and historic Exploration Drilling Results compiled by Dr Andrea MarslandSmith who is a Member of the AusIMM. Dr Marsland-Smith is employed on a full-time basis with Alligator Energy as Chief
Operating Officer, and has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration (including 22 years in ISR uranium mining operations and technical work) and to the activity she is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves. Dr Marsland-Smith consents to the inclusion in this release of
the matters based on her information in the form and context in which it appears.
8
About Alligator Energy
Alligator Energy Ltd is an Australian, ASX-listed, exploration company focused on uranium and energy related
minerals, principally cobalt-nickel. Alligator’s Directors have significant experience in the exploration,
development and operations of both uranium and nickel projects (both laterites and sulphides).
Projects
9
APPENDIX 1 - In accordance with ASX Listing Rule 5.7.2 the Company provides the following information.
Table 1: Uranium intercepts from AGE Nabarlek North RC drilling program 2024. Uranium concentrations (U3O8) were
determined from assays on 1 m bulk samples. Minimum threshold of 100 ppm U 3O8 used for reporting purposes (minor
anomalism represented by assays between 25 and 100ppm U3O8.
Hole ID
Prospect
Easting
Northing
RL
(m)
Depth
(m)
Dip
Azimuth
Cofund
From
(m)
NNRC24-010
ROF
324647
8656305
65
150
-60
232
Y
No Significant Intercept
NNRC24-011
ROF
324128
8656297
67
150
-70
225
Y
No Significant Intercept
NNRC24-012
ROF
322948
8655443
56
150
-70
225
Y
No Significant Intercept
NNRC24-013
ROF
323086
8655605
58
150
-70
225
Y
No Significant Intercept
NNRC24-014
ROF
326496
8655905
71
150
-90
360
Y
No Significant Intercept
NNRC24-015
ROF
326689
8655894
75
150
-90
360
Y
No Significant Intercept
NNRC24-016
ROF
326294
8655893
68
150
-90
360
Y
No Significant Intercept
NNRC24-017
ROF
326329
8654690
68
150
-70
90
Y
No Significant Intercept
NNRC24-018
Bully
329954
8646702
98
150
-90
360
Y
Minor anomalism
NNRC24-019
Bully
330025
8646701
99
150
-90
360
Y
83
NNRC24-020
Bully
330103
8646666
99
150
-90
360
Y
No Significant Intercept
NNRC24-021
U40 N
326699
8645899
67
150
-90
360
N
No Significant Intercept
NNRC24-022
U40 N
326794
8645895
67
136
-90
360
N
No Significant Intercept
NNRC24-023
U40 N
326894
8645890
67
156
-90
360
N
No Significant Intercept
NNRC24-024
U40 W
326745
8645409
71
150
-90
360
N
No Significant Intercept
NNRC24-025
U40
327135
8645319
68
210
-80
270
N
Minor anomalism
NNRC24-026
U40
327169
8645305
67
150
-70
90
N
No Significant Intercept
NNRC24-027
U40
327156
8645303
68
228
-90
360
N
No Significant Intercept
NNRC24-028
U40
327115
8645460
66
150
-80
90
N
Minor anomalism
NNRC24-029
U40
327111
8645432
66
198
-80
90
N
Minor anomalism
NNRC24-030
U40
327148
8645338
67
150
-65
90
N
Minor anomalism
NNRC24-031
U40
327125
8645327
68
198
-80
90
N
45
Interval
(m)
1
3
U3O8
(ppm)
109
260
Including 1m @ 570ppm
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
•
Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of
sampling.
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that are Material to
the Public Report.
In cases where ‘industry standard’ work has been done this would
be relatively simple (e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to produce a 30
g charge for fire assay’). In other cases more explanation may be
required, such as where there is coarse gold that has inherent
sampling problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of detailed
information.
•
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic, etc) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by what method, etc).
•
techniques
•
•
•
Drilling techniques
•
•
•
•
•
•
Drill sample
•
recovery
•
•
Logging
•
Method of recording and assessing core and chip sample recoveries
and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
•
•
•
•
•
Results reported in this announcement relate to reverse circulation (RC) drilling during the 2024
exploration program at the Nabarlek North Project and surface sampling results from both it and the
company’s Tin Camp Creek project in the Alligator Rivers Uranium Province (“ARUP”), Northern
Territory.
Sampling of the RC drilling program involved the following components:
o
Drilling sample return is taken off the rig at 1 m intervals without any splitting. They are laid out in
numerically ordered labelled bags to avoid any confusion over intervals.
o
Following geological inspection, representative and non-composited 1-3 kg portions are taken from
the 1 m samples (above) where there is: a change in geological horizon, mineralisation, alteration
assemblages or any other zone of interest. Sampling is done on a maximum 10 m interval over the
entire drill hole as part of the geochemical program.
o
All samples are geologically logged, and natural gamma radioactivity level is measured with a RS230 BGO Handheld Gamma-Ray Spectrometer
Surface Sampling was undertaken at both planned and ad-hoc locations identified during sampling and
reconnaissance programs, with a mix of soil and hard rock samples. Locations are recorded by GPS.
o
Soils were collected by shovel from an approximate 20 to 30cm depth, weighing 1-2kg
o
Rocks were collected by hammer, with sample weights typically 1-2kg
Samples for assaying across the entire RC drilling and surface sampling programs were shipped to the
same laboratory under multiple batches. Laboratory sample preparation is described in the ‘quality of
assay data’ section.
Drilling was contracted to Topdrill P.L. of Western Australia. Using a Schramm T685 rig for reverse
circulation (RC), twenty two holes were completed with typical depths of 150m upto 228m. (see Table 1)
Drill hole collar locations were positioned using a dual phase Garmin GPS with an approximate X-Y
tolerance of 3 to 5 m.
Holes were surveyed on completion of drilling with a Reflex SPRINT IQ gyroscopic compass. Survey
interval was typically 10 m and end of hole.
Sample recovery from the RC drilling is monitored during drilling with an assessment made on the
volume and weight of material recovered relative to the drill interval. If RC sample recovery is poor, it is
logged as such. This is systematically recorded in the logging database.
Cross-interval contamination is assessed regularly but it is not possible to eliminate from the RC drilling
process. No significant contamination issues have been encountered in this program.
For this program no apparent relationship was observed between sample recovery and grade. No
sample bias is expected.
Standard sample logging procedures are utilised, including logging codes for lithology, minerals, colour,
weathering etc.
A chip tray for selected sample intervals is completed covering interesting lithologies and mineralisation.
A sub-sample is sieved into chip trays to provide for further detailed logging once the assays have been
Criteria
JORC Code explanation
•
•
Sub-sampling
•
techniques and
•
sample
preparation
•
•
•
•
Quality of assay
•
data and
laboratory tests
•
•
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature, quality, and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the
in-situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
For geophysical tools, spectrometers, handheld XRF instruments,
etc, the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and precision have been
established.
Commentary
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Verification of
•
sampling and
•
•
assaying
•
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
•
•
•
•
received.
All chip trays are photographed for digital archiving
Average natural gamma ray activity is measured for each sample. The instrument is routinely calibrated
from counts to instrument-independent decay rate, taking into crystal volume, sensitivity, and dead-time.
The RC drilling process does not generate core but chips of samples as returns
The chips are recovered at one-meter intervals via the dust supressing cyclone – wet or dry
1-3 kg samples are extracted from the one-meter interval ‘bulk samples’ at 15m intervals, for routine
laboratory submission.
Selective sample intervals for assaying are selected on the basis of a change in geological horizon,
mineralisation, alteration assemblages or any other zone of interest.
Samples are taken by spear of the bulk to provide an unbiased split for analysis.
To ensure laboratory reliability, a quality control (QC) sample was inserted in a maximum 1:40 ratio.
Duplicates and Standards pertinent to the type of mineralisation and grades anticipated, were also
submitted with batches to verify laboratory sensitivity and thresholds
Sample analysis occurs at Bureau Veritas, SA
Samples were pulverized and then split to obtain separate aliquots:
o 0.2g aliquot dissolved in classic four acid mixture and assayed for minor elements (inc REEs) using
ICP-MS and ICP-OES. Resistate minerals may not be dissolved in this method and as such certain
elements can be considered minimum values (e.g., Zr, Ti).
o 1g aliquot that has been fused with lithium metaborate and dissolved in nitric acid and assayed for
major elements using ICP-OES. This is close to a full digestion of resistate minerals.
o 40g aliquot used for classic Firing technique (ICP-OES) to determine Au, Pt and Pd (PGEs).
o Aliquot for gravimetric analysis (Loss on Ignition)
o 0.2g aliquot dissolved in classic four acid mixture and assayed for lead and uranium isotopes using
ICP-MS. Resistate minerals may not be dissolved in this method (e.g., Zircon, Monozite), which is
intentional, as the isotope values being sought are for remobilised materials that can provide
evidence of alteration or pathways for mineralising fluids.
Bureau Veritas employs standard NATA procedures for internal standards and duplicates.
Samples analysed for REEs were submitted for ICP-MS following Lithium Borate fusion, considered a
total digest method in consideration of REE hosting resistate minerals such as Monozite, Xenotime and
Bastnäsite.
HPS samples were submitted for whole rock XRF analysis in consideration of the high silica grades,
samples were fused with 12:22 Lithium Borate flux following standard crushing and pulverising
preparations.
Alligator’s project geologists are supervised by the Project Manager
All field data is entered into excel spreadsheets (supported by look-up tables) at site and subseq
Share your feedback
Discover