Austmine Conference Presentation - Samphire Project
Released
Released
Announcement PDF
ASX: AGE
Samphire Uranium Project
Investigating the potential for near carbon-free energy mine project
Greg Hall – CEO
Austmine Conference 2023 - Adelaide
Disclaimer
Disclaimer
This presentation contains projections and forward looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without
limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance of the Company. These risks and uncertainties could
cause actual results and the Company’s plans and objectives to differ materially from those expressed in the forward-looking information. Actual results and future events could differ materially from
anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates and opinions of management on the dates they are made and expressly
qualified in their entirety by this notice. The Company assumes no obligation to update forward-looking information should circumstances or management’s estimates or opinions change.
Competent Person’s Statement – Uranium
Information in this report is based on current and historic Exploration and Resource Drilling Results compiled by Dr Andrea Marsland-Smith, who is a Member of the AusIMM. Dr Marsland-Smith is
employed by Alligator Energy as Chief Operating Officer (COO) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity
she is undertaking (including 15 years working with ISR uranium development and operations) to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves. Dr Marsland-Smith consents to the inclusion in this release of the matters based on her information in the form and context in which it
appears.
Competent Person’s Statement – Nickel Cobalt exploration
Information in this report is based on current and historic Exploration Results compiled by Mr Geoffrey Chapman who is a member of the Australian Institute of Geoscientists. Mr Chapman is a
Consultant Geologist with Alligator Energy Limited, and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Chapman
consents to the inclusion in this release of the matters based on his information in the form and context in which it appears.
2
Scoping Study Presentation | March 2023 | ASX:AGE
Alligator Energy – Strategy
• Advance Samphire Uranium Project through resource
evaluation, pilot field recovery trial, approvals and predevelopment into production
• Active uranium exploration in Alligator Rivers Uranium
Province (ARUP), Arnhem Land, NT
• Commence uranium exploration in the Cooper Basin, SA
• Nickel-Cobalt (Cu, Au) exploration in Piedmont, Italy
• Evaluating and acquiring further uranium or energy mineral
assets in key target regions
• Strategic relationship with Traxys Energy group for uranium
marketing
* Refer to numbered references on slide at end of presentation
3
Scoping Study Presentation | March 2023 | ASX:AGE
Samphire Uranium Project Scoping Study
Study confirms potential for globally competitive In-Situ
Recovery uranium mine – similar to Beverley, Four Mile
and Honeymoon uranium mines
•
•
10Mlbs drummed uranium oxide production over 12 years
initially
1 Mlbs pa with ramp up/down – Opportunity to increase
•
Capital cost forecast of A$129.3M inclusive 40%
contingency and escalation
•
All In Sustaining Cost A$43.19/lb U3O8 (US$30.23/lb U3O8)
•
Current U3O8 price A$78.4/lb (US$53/lb) long term
•
Ungeared, real post-tax NPV8 of A$152M @ US$65 /lb
•
Post-tax internal rate of return (IRR) of 29%
•
Payback period of 3.5 years from start of production
4
Scoping Study Presentation | March 2023 | ASX:AGE
In-Situ Recovery system advantages
•
In-Situ Recovery circulates existing hypersaline groundwater, dosed with 0.025%
lixiviant.
•
Solution falls under head pressure down
injector wells, dissolving uranium within sand
pore spaces, and pumped up recovery wells
to an IX plant.
•
Samphire low costs due to shallow deposit
(60 to 80m depth), excellent formation
porosity, high leaching dynamics, location
near Whyalla – locally based workforce (no
FIFO and camp), experienced mining
services and business support, lower cost
of key infrastructure.
5
Scoping Study Presentation | March 2023 | ASX:AGE
•
Field Recovery Trial for late 2023 to confirm parameters
to be used in a full feasibility study planned for 2024
Samphire – Investigating potential for Near Carbon-free energy mine
Key outcome of Study: Investigate the opportunity for a
near carbon-free energy project, including:
•
Lower power consumption (as ISR method has no
rock or material movement, no crushing and grinding
of rock) may allow full use of renewable power with
battery backup;
•
20kms distance to Whyalla may allow all electric
vehicles and light trucks to be used; and
•
Recent advances in electric on-highway prime movers
may support the relatively low level of logistics and
product transport needed.
•
This potential opportunity aligns with SA Government
Hydrogen Hub for Whyalla region (EOI’s underway),
extensive potential renewable projects, and Northern
Water Desal plant
6
Scoping Study Presentation | March 2023 | ASX:AGE
Potential uranium-bearing channel extensions at Samphire
Samphire – Investigating potential for Near Carbon-Free energy mine
Power demand and supply:
• Power demand – basically pumps and
tanks only, RO plant – continuous ops
• Estimated at 2.9 to 3.4 MW installed
• Major renewable companies have
exclusivity in region - Alligator under NDA
for ongoing power discussions and
opportunities
• 35km 5MW power line as backup, which
is also dominated by renewable power
• Eyre Peninsula has four wind zones
with speeds > 8 m/s and >38%
capacity factors. Potential to support >
10,000 MW of wind generation.
7
Scoping Study Presentation | March 2023 | ASX:AGE
Source: https://energymining.geohub.sa.gov.au/
Samphire – Investigating potential for Near Carbon-Free energy mine
On-site electric vehicle potential:
• 20kms distance to Whyalla – also power
available onsite
• Electric 4WD’s being tested at SA mines
(Prominent Hill, Olympic Dam) – electric
2WD utility vehicles will also suffice in our
operation
• Electric mobile cranes now a reality
• Light to medium trucks becoming
available
8
Scoping Study Presentation | March 2023 | ASX:AGE
Samphire – Investigating potential for Near Carbon-Free energy mine
On-highway electric prime movers for logistics supply
and product transport:
• Janus Electric (Berkeley Vale, NSW) converting diesel
prime movers to electric, with slide in slide out battery
packs
• OZ (BHP), Qube and Janus Electric trialling 3 trailer
heavy haulage electric trucks later this year from
Adelaide to Carapateena & return
• Battery charging and replacement stations in Adelaide,
Pt Augusta and Carapateena
• Samphire project logistics estimate – 11 double trailer
supply trucks per month, and 1 to 2 product delivery
trucks per month (2 to 3 x 20ft containers)
https://www.januselectric.com.au/
9
Scoping Study Presentation | March 2023 | ASX:AGE
Samphire – Investigating potential for Near Carbon-Free energy mine
Future considerations:
• We say “near” carbon-free as SA grid still relies
on eastern states interconnector and gas backup.
• Also In-Situ Recovery requires ongoing drilling of
wellfields – need to investigate the suitability of
large hole electric drilling rigs for 60 to 85 m drill
depth.
• However, this ignores the fact that we will be
producing 1Mlbs pa of uranium oxide, which
when enriched and used in a modern nuclear
power station overseas will run a 1 GW station for
just over a year producing only ~5 Mt CO2.
• This 1Mlbs pa would offset approx. 5% of
Australia’s 2021 carbon based power
generation footprint.
10 Scoping Study Presentation | March 2023 |
ASX:AGE
Samphire ISR Project – Schematic layout of potential operation for initial
12 years project – plant suitable for extended production
Field Recovery Trial (FRT)
• To confirm bench scale testwork, confirm RO plant operation,
and better understand how well uranium is liberated from
underlying sediments with ISR.
• Short-term (approx. 3-months) pilot FRT proposed for late
2023.
• Approval in process by Department for Energy and Mining.
• Will not produce uranium oxide final product
• Full-scale ISR mining ~40 to 50 producing wells ongoing –
FRT only consists of 3 producing wells and a small,
containerised pilot IX plant.
• Upon completion of planned and any future testing, well
infrastructure and pilot processing plant removed and
rehabilitated.
• If successful, will lead to feasibility study and mining lease
approvals.
11 Scoping Study Presentation | March 2023 |
ASX:AGE
ASX: AGE
Greg Hall CEO
+61 (0) 7 3839 3904
gh@alligatorenergy.com.au
www.alligatorenergy.com.au
Alligator Energy - ESG in practice
Alligator Rivers:
•
~40 indigenous employees on drilling and exploration programs over 10 years
•
On country work and support for indigenous ranger groups – even when not exploring
•
Nabarlek North agreement – potential for TO groups to become 25% partner.
•
Drilling at Nabarlek North in 2022 – Indigenous owned and operated drilling company
•
Exploration rehabilitation after each program
Samphire Project
•
Completed remaining historical rehabilitation during project acquisition
•
Ongoing drill hole rehab – targeting lifting of bush density to double the existing
•
Early and ongoing engagement with pastoralists, Traditional owner group, Whyalla
community reps
•
Working with pastoralists for weed and pest control, and with rangeland improvement
initiatives
•
Early initiatives for low impact site facilities, Northern Water, sustainable energy
Big Lake Uranium
•
Full draft agreement with YYTLOAC indigenous group being finalised
•
Direct indigenous employment from first programs
Scoping Study Presentation | March 2023 | ASX:AGE