Annual Report to shareholders
Released
Released
Announcement PDF
ASX : AGE
Alligator Energy Limited
ACN 140 575 604
AGE 2023 Annual Report
03
Highlights
102
Corporate Governance &
Competent Person Statements
12
Chairman & Chief Executive
Officer’s Letter
103
Annual Mineral Resource
Statement
16
Tenement Register
17
107
Additional Information (ASX
Listing Rules)
Project Locations
18
Corporate Directory
Environmental, Social and
Governance (ESG) in Action
109
25
Financial Report
26
Directors’ Report
50
Consolidated Statement of Profit
& Loss
51
Consolidated Statement of
Financial Position
52
Consolidated Statement of
Changes in Equity
53
Consolidated Statement of Cash
Flows
54
Notes to the Consolidated
Financial Statements
98
Auditor’s Report
2
2023 Annual Report
Alligator Energy is a responsible and progressive uranium and
energy metals explorer and emerging producer
Our aim is to discover, source and economically extract these needed commodities
with an innovative approach, with either zero or minimal impact, and with positive
value and experience for our stakeholders and communities.
We look at our business activities through the eyes of our stakeholders:
•
We aim to add value for shareholders in all our decision-making.
•
We wish to provide an engaging, challenging, enjoyable and respectful workplace for our
employees.
•
We respect the rights of landowners and communities and seek to collaborate for our
mutual benefit.
•
We respect the cultural heritage and connection to country of Traditional Owners and wish
to create mutually beneficial opportunities.
•
We aim for a low impact on the environment through innovation, latest technology, and
responsible land management techniques.
Shareholders
Communities
Team
STAKEHOLDER
PERSPECTIVE
Focus on
Environment
Landowners
Traditional
Owners
2023 Annual Report
3
ALLIGATOR ENERGY’S STRATEGY
Our strategy is focused and straightforward:
•
To advance the Samphire Uranium Project through resource growth, economic evaluation,
field recovery trial and feasibility study, initial offtake contracts, approvals and financing into
in-situ recovery (ISR) production.
•
To identify and test highly prospective exploration targets at the Alligator Rivers and Big
Lake Uranium Projects.
•
To evaluate, acquire or JV with further uranium or energy mineral assets in key target
geographic regions.
•
To value-add to our Ni Co Cu Piedmont Project in northern Italy through exploring strategic
partnership investment.
•
To continue to develop our nuclear utility customer relationships to enable future
establishment of long-term offtake contracts at supportive pricing and economics for our
Samphire Uranium Project.
4
2023 Annual Report
ALLIGATOR’S PROJECT PIPELINE
HIGHLIGHTS 2022-2023
Samphire Project, South Australia
•
Initial and Upgraded Mineral Resource Estimate at Blackbush within twelve months
An initial Mineral Resource Estimate (MRE) of 14.8Mlbs U3O8 at 250ppm cut-off
(combined Inferred and Indicated) from 10Mt @ 666 ppm U3O8 for the Blackbush Deposit
(Blackbush) was confirmed on 1 September 2022. The MRE applies to ISR amenable
lithologies only (i.e., the Kanaka Beds), with a cut-off grade of 250 ppm U3O8 to identify
a potential ISR mineable resource.
An upgrade to the MRE was then achieved in March 2023 with a 23% increase in
uranium metal content (combined Indicated and Inferred) to 18.1Mlbs at a cut-off grade
of 250ppm U3O8 from 11.4Mt @ 720ppm.
2023 Annual Report
5
HIGHLIGHTS (CONTINUED)
•
Improved quality of the MRE at Blackbush achieved through rotary mud drilling
The average grade of the MRE at Blackbush of 666ppm U3O8 has lifted from UraniumSA’s
(previous owner) global mean grade of 230ppm U3O8 and is now on par with several
existing and previously operating ISR projects in Australia and the USA. A further
upgrade of 8% in average grade of the MRE from 666ppm U3O8 to 720ppm U3O8 was
achieved from the drilling in Q4 of 2022.
The infill and extensional drilling in Q4 of 2022 also increased the Indicated portion of
the MRE to enable the Scoping Study to draw from a higher confidence level – see table
below:
Changes for Alligator’s Blackbush Mineral Resource (September 2022
•
March 2023)
Resource Growth Potential Identified at Blackbush
In October 2022 a follow-up drilling program of 120 infill and extensional holes at
Blackbush was initiated and remained ongoing at 30 June 2023 with significant uranium
mineralisation intersections encountered to date including:
Blackbush East:
• 1.78 metres at 0.45% (4,569ppm) pU3O8 from 61.70 metres (GT 8,132)
• 1.94 metres at 0.11% (1,106ppm) pU3O8 from 58.20 metres (GT 2,145)
• 1.26 metres at 0.19% (1,916ppm) pU3O8 from 58.76 metres (GT 2,414)
• 1.30 metres at 0.21% (2,149ppm) pU3O8 from 60.72 metres (GT 2,793)
Blackbush West:
• 1.18 metres at 0.25% (2,557ppm) pU3O8 from 69.68 metres (GT 3,017)
• 1.12 metres at 0.26% (2,696ppm) pU3O8 from 73,95 metres (GT 3,019)
• 1.58 metres at 0.10% (1,097ppm) pU3O8 from 77.44 metres (GT 1,733)
• 1.92 metres at 0.15% (1,539ppm) pU3O8 from 74.51 metres (GT 2,964)
6
Note: GT = grade(ppm) x thickness(m) – divide by 10,000 for m% GT
2023 Annual Report
HIGHLIGHTS (CONTINUED)
•
Highly Successful uranium leach extraction tests conducted with the assistance of
ANSTO
The testwork covered leaching of uranium from core samples through diagnostic, bottle
roll and column leach tests, and ion exchange (IX) uranium extraction using latest Strong
Base Ion salt tolerant resins. The work was undertaken by the Australian Nuclear Science
and Technology Organisation (ANSTO). The leaching performance of the uranium ore
from Samphire in an In Situ Recovery (ISR) scenario was simulated in two horizontal
column leaching tests over 33 days. High uranium extraction into solution was achieved
with extractions between 92.9% and 96.3%.
•
Scoping Study confirmed potential for a low cost ISR uranium operation at the
Samphire Project
Samphire Uranium Project Scoping Study completed in March 2023 confirmed the
potential for development as a globally competitive low-cost uranium operation using
the in-situ recovery (ISR) process at Samphire. A Life-of-Mine (LOM) Production Target
of 10.0 Mlbs U3O8 over 12 years was applied, with annual production target of 1Mlbs pa
for 8 years with ramp up and ramp down. Key economic metrics were as follows:
•
Low initial capital expenditure forecast of A$129.3M (A$123M-A$136M) including
a significant combined contingency and cost escalation allowance of 40%.
•
Average cash operating costs of A$25.59/lb U3O8 (US$17.92 /lb U3O8) with a
range of A$24.31/lb - A$26.87/lb).
•
AISC (including transport, shipping, royalties and sustaining capital) of
A$43.19/lb U3O8 (US$30.23/lb U3O8) with range of A$41.03/lb to A$45.35/lb.
•
Attractive projected economics at a forecast US$65/lb U3O8 realised sales price and
AUS:USD exchange rate of 70 cents:
•
•
•
Ungeared, real post-tax NPV8 of A$152M (A$144M - A$160M)
Post-tax internal rate of return (IRR) of 29% (27.5% - 30.4%)
Payback period of 3.5 years from start of production
2023 Annual Report
7
HIGHLIGHTS (CONTINUED)
•
Retention Lease application to obtain approval to conduct a field recovery trial (FRT) at
Samphire lodged in April 2023
A Retention Lease is required for the purposes of conducting the FRT at Samphire
(Blackbush Deposit) in early 2024. The South Australian Department for Energy and
Mining (DEM) advised that the application was accepted, subject to some formatting
updates plus additional information on baseline descriptions, and data on the groundwater
characteristics and flow dynamics of aquifers in the application area. The full document
was resubmitted on 18 August 2023 and was on release for public consultation between
Wed 23rd August to Wed 20th September 2023. At time of writing Alligator was awaiting
the public submission documents from the DEM.
Alligator Rivers Uranium Projects – TCC, Beatrice and Nabarlek North, Northern Territory,
Australia
8
•
A Falcon Plus airborne gravity survey was successfully completed in July 2022 at the
Nabarlek North Project, the first exploration work for this newly licensed Project.
•
Regional auger and RAB drilling program completed at Nabarlek North Project in the
last quarter of 2022, with over 1,000 samples collected and submitted for geochemical
analysis.
•
Interpretation of the geochemical assays from drill samples acquired in the 2022 field
season was integrated with the Falcon airborne gravity data and was integral to the
planning for the 2023 field season. Twenty-three (23) priority target areas were then
identified for the focus of this field work which commenced in early July 2023.
•
An induced polarisation (IP) geophysical survey over key areas covering a collective
20km2 commenced towards the end of the financial year. Higher resolution follow-up is
then anticipated over the best geophysical targets from this work. A key objective of the
IP survey is to map chargeability and subtle conductive structures in the area north of
DevEx Resources’ (ASX: DEV) high-grade U40 Prospect.
•
Systematic auger and RAB drilling recommenced in July 2023 across the Nabarlek North
project area. The program will largely cover the remaining untested parts of the tenure.
•
Trialling of ultrafine (< 2µm) assaying from samples collected in 2022 was initiated. The
technique has the potential to replicate basement geochemistry sampling without the
need for shallow regolith drilling. The data will also be used to review tenure prospectivity
for rare earth elements.
2023 Annual Report
HIGHLIGHTS (CONTINUED)
Big Lake Uranium Project – Cooper Basin, South Australia
•
6 additional mineral exploration licences were granted adjoining the previously held Big
Lake title significantly enlarging the uranium exploration search space in the Cooper
Basin with a large proportion covering the emerging exploration opportunities related to
the “granite wash” geology of the underlying Cooper Basin.
•
A comprehensive compilation and interpretation of seismic data across the Big Lake
Project area was completed. This has set the groundwork for detailed paleochannel and
other potential host formation mapping, defining potential source-to-trap pathways and
determining prioritised drilling locations.
•
AGE conducted an inspection of core from the Moomba 236 petroleum well to assess
the radiogenic source potential of ‘granite-wash’ plays within the Patchawarra Formation/
Tirrawarra Sandstone at Big Lake.
•
A Native Title Agreement for Mineral Exploration with the Yandruwandha Yawarrawarrka
Traditional Landowner Aboriginal Corporation (YYTLOAC) was executed in May 2023,
allowing for detailed planning of an inaugural investigative drilling program at Big Lake.
•
Post year end, initial site visits to understand cultural heritage requirements were
undertaken, and a formal heritage survey has now been requested. Subject to final
drill area clearance and regulatory approvals, drilling is now anticipated to commence
in early 2024.
Energy Minerals – Piedmont Ni-Co Project, northern Italy
•
An inaugural ground EM geophysics program was completed over five grids on the Alpe
Laghetto license. Highlights included an anomaly identified coincident with observed
mineralisation at historic Alpe Laghetto mine and a new large-scale anomaly east of
historic La Balma Ni-Co prospect.
•
Alligator completed its farm-in obligations and acquired a 51% interest in the underlying
Piedmont licences.
•
A site mapping and sampling visit was conducted in May 2023 across the EM conductors
identified in 2022 at La Balma and Alpe Laghetto prospects. In addition, the Team
assessed logistics for a potential 2024 drilling program, should the combined geology,
geochemistry and EM results provide compelling evidence for untested, mineralised
targets below surface.
•
Geochemical assaying covering 52 elements and compositions was accompanied by
petrology and petrophysical analyses on 9 and 34 samples respectively. When integrated
with 2022 EM survey results, the combined datasets do not provide compelling cases to
proceed to a drilling program at this stage.
2023 Annual Report
9
HIGHLIGHTS (CONTINUED)
Corporate
•
AGE attended the World Nuclear Association (WNA) Symposium and Nuclear Energy
Institute (NEI) Uranium seminars in 2H 2022, and the World Nuclear Fuel Market (WNFM)
conference in 1H 2023. The Company met with a large number of potential European
and US nuclear utility customers to introduce the Samphire Uranium Project for future
uranium term agreements. There was keen interest on future diversified uranium supply
from secure jurisdictions such as Australia, and several of the utilities expressed an
interest in early conditional offtake contracts which would assist to support financing of
a project.
•
Changes to the Board composition occurred in April 2023, with long term NED Andrew
Vigar departing, and new non-executive director Fiona Nicholls being appointed. Fiona
brings 30 years of experience in the global resources industry to the Alligator Board
having worked across a range of business functions including strategy and planning,
exploration and operations, multi-country project development and approvals, due
diligence and assurance processes, crisis management and organisational change.
•
Michael Barlow was appointed as Group Exploration Manager with principal responsibility
for advancing exploration activities at the Nabarlek North (and other interests in the
ARUP), Big Lake and Piedmont Projects. Michael was previously the Director Geophysical Acquisition and Processing at Geoscience Australia. Prior to that he held a
number of senior roles with BHP Exploration.
•
Significant progress was made in the first two years of a strategic relationship with Traxys
North America LLC (Traxys), the U.S. arm of the global commodities trading group Traxys.
Traxys is providing uranium marketing services for future uranium production long-term
offtake contracting, will consider potential support in project development financing, and
is assisting in uranium and energy minerals project acquisition opportunities.
•
Evaluation of a range of additional uranium and energy minerals opportunities continued
during the year.
Uranium Market
•
10
Spot uranium price increased from US$49.50 per lb to over US$56 per lb U3O8 during the
financial year. At time of writing, and with future supply issues dominating the uranium
market news, the spot price had climbed close to US$70 towards the end of September
2023.
2023 Annual Report
HIGHLIGHTS (CONTINUED)
•
As of March 2023, 57 reactors were under construction around the globe, with 22 of
those being in China. During 2022, 6 new reactors were connected to the grid with a total
capacity of 9,054 Mwe, and 5 old reactors were shut down (total capacity 3,271MWe).
Thus far in 2023, 4 new reactors have been connected to the grid in Slovakia, China,
USA and Belarus (total capacity 3,772MWe) and 5 old reactors have been shut down in
Taiwan, Belgium and Germany (total capacity 6,048MWe).
•
Small Modular Reactors (SMR) remained in the headlines, with an MOU signed with
NuScale in Romania, collaboration between France and Belgium on EDF’s NUWARD
SMR design, a Rolls Royce/Sumitomo study showing the potential for a 470 Mwe SMR
design to support the UK’s hydrogen network and Slovakia’s utility signing agreement in
support of SMR development amongst other news on this front.
•
Refer to Chairman and CEO’s letter for further commentary on outlook for nuclear power
as a stable low carbon power generation source.
2023 Annual Report
11
CHAIRMAN & CHIEF EXECUTIVE OFFICER’S LETTER
We are delighted to report on significant progress, strong momentum and positive outcomes
across our project portfolio through FY 2023, and that Alligator Energy has ensured it remains
well-funded to maintain this rapid pace.
At our Samphire Project’s Blackbush Deposit, key results include reporting both an initial and
then an upgraded mineral resource of 18.1Mlbs U3O8 at an increased grade of 720ppm, a
Scoping Study for an In-Situ Recovery (ISR) operation with robust economics, and detailed
planning for a field recovery trial to be conducted in early 2024. We’ve also delivered encouraging
progress at our Nabarlek North project in the NT, with geophysical and geochemical surveys
identifying 23 priority targets which are currently being assessed, along with advancing work on
our Big Lake project in SA and Piedmont project in Italy. In parallel with this progress, Alligator
continues to attract high-calibre, experienced personnel to its Board and growing Team.
At Samphire we initially reported an ISR resource of 14.8Mlbs U3O8 from 10Mt @ 666 ppm
U3O8. Following ongoing infill and extensional drilling, we subsequently upgraded the mineral
resource estimate later in the financial year, in terms of scale, grade and confidence, lifting this
to 18.1 Mlbs U3O8 (from 11.4Mt at 720ppm U3O8), with 10.7 Mlbs in indicated category.
This resource was enough to underpin an industry competitive Scoping Study, with a low capex
of A$129 million which will deliver an ISR processing plant producing 1 million lbs U3O8 per
annum for 12 years (including ramp up - ramp down) for total production of 10 million lbs U3O8.
With an All In Sustaining Cost of US$30.20 /lb (A$43.19/lb) U3O8 and at a forecast price of
US$65/lb U3O8 and AUD/USD 0.70 exchange rate, the project delivers robust economics with
an ungeared, real post-tax NPV8 of A$152M and 3.5 year pay back.
While we believe the Samphire Scoping Study to be compelling, we are confident the resource
will grow further in scale and confidence level, based on the results of additional drilling during
the calendar year with an aim to further update the Mineral Resource in November this year.
An updated Scoping Study based on this updated resource and updated marketing pricing will
be undertaken in parallel. We have also identified considerable regional potential, and Alligator
is now preparing an exploration target range to cover the Plumbush Deposit, further potential
around Blackbush, and other historical uranium intersections not yet followed up. With a near
term objective of growing the global resource at Samphire, there is a clear path to augmenting
the metrics of the Scoping Study.
An important next step in de-risking the project is the Field Recovery Trial at Blackbush. We
have begun fabricating the pilot plant in Adelaide, ordered a range of hardware and reagents,
hired an experienced Process Chemist and engaged ammjohn, a project engineering and
management group. A retention lease application for this trial has been reviewed by the South
Australian Government, and the public consultation for this process was underway at time of
writing.
12
2023 Annual Report
CHAIRMAN & CHIEF EXECUTIVE OFFICER’S LETTER
(CONTINUED)
The Nabarlek North project in the Northern Territory sits within a highly prospective uraniumbearing region. It is adjacent to the U40 Prospect which has previously produced intersections
such as 6.8m @ 6.7% U3O8, and lies to the north of the previous Nabarlek Mine. During
the second half of 2022 we conducted an airborne gravity survey and drilling program which
generated a number of high-priority targets that we are testing further with an IP survey and
follow up geochemical drilling. This is quickly evolving into a very exciting project, and we look
forward to reporting on our further findings.
While most uranium projects globally are testing known occurrences, our Big Lake project in
South Australia’s Cooper basin represents a rare greenfields ISR uranium target and potential
new province if exploration is successful. We are testing an internationally recognised theory
around the coincidence of significant uranium roll front deposits and hydrocarbon deposits.
After close engagement with the traditional landowners, a Native title Agreement was executed
in May, and pending initial surveys and approvals, we plan to be drilling during early 2024.
At Piedmont in northern Italy, a ground EM geophysics program and additional ground-truthing
and sampling was undertaken, and at time of writing determination of next steps was still
underway with our JV partner.
The positive news around the nuclear power industry and uranium market has continued into
the FY 2023. As at end June 2023 the uranium spot price had gained ~13% over the twelve
months to be at US$56.13/lb U3O8. At time of writing, and with future supply issues dominating
the uranium market news, the spot price had climbed close to US$70 towards the end of
September 2023.
One ongoing theme that continued through the year has been Western governments increasing
their support for nuclear energy, often reversing previous policy decisions to do so. Sweden
recently flagged the potential for ten new conventional reactors, after pivoting their energy policy
goal from ‘100% renewable’ to ‘100% fossil-free’. The government will present a roadmap later
this year for the expansion of nuclear power, to help reach net-zero emissions by 2045.
The UK government committed to a programme of new nuclear projects, describing nuclear as
the ‘critical baseload of the future energy system’, with the goal for nuclear to provide a quarter
of Britain’s electricity, and help the UK become a global leader in large scale nuclear and SMR’s
which have been gaining growing support.
The Netherlands government announced plans to build two new nuclear power plants by 2035
as it aims to make its power production carbon neutral by 2040. In a similar vein, the Italian
parliament committed to consider nuclear power among Italy’s clean energy sources, with the
Lower House of Parliament passing two motions geared at countering the country’s historical
anti-nuclear stance. In France, EDF announced it is seeking the necessary authorisations to
construct two EPR2 reactors in Normandy, Northern France.
2023 Annual Report
13
CHAIRMAN & CHIEF EXECUTIVE OFFICER’S LETTER
(CONTINUED)
As of March 2023, 57 reactors were under construction around the globe, and these additional
commitments from major governments will all add further future demand to a market already
forecast to move significantly into deficit.
There has been growing support for Small Modular Reactors (SMR’s) through the year, which
Alligator sees as being an important part of the industry’s future. Leading SMR company, RollsRoyce, signing an MOU to investigate the deployment of its small modular reactor in Finland
and Sweden as well as Ukraine.
Another developer, NuScale Power, placed its first long-lead order to build the SMR modules
for the Carbon Free Power Project LLC’s plant at the Idaho National Laboratory in Idaho. Then
at the G7 leaders’ summit, funding of up to $US 275 million was announced to advance the
deployment of a NuScale’s SMTR in Romania.
The Ontario government announced planning and licensing for three additional GE Hitachi
SMRs, for a total of four, at Darlington.
A key driver in the uranium supply market during the year was potential sanctions on Russian
uranium. Given that a large portion of Western uranium has been converted and enriched in
Russia, there is a dramatic push to increase capacity in the West. One mothballed conversion
facility, Converdyn in the USA, was brought back online, and an existing enrichment facility
operated by Urenco will expand capacity, representing some initial progress for firming nuclear
fuel supply chains. The shortage of western enrichment capacity has resulted in some levels of
‘overfeeding’, where an increased level of uranium is processed to produce the same enriched
material, but allowing faster processing times to improve capacity. This is important as it adds
another increase in demand for uranium.
An important indicator in the uranium supply and purchase market is the level of long-term
uranium contracting – traditionally how ~80% of uranium is sold to nuclear utilities. In the
2022 calendar year, 122 Mlbs of uranium were put under long term contract, nearly 6 times the
previous year. By August 2023, already ~ 120 Mlbs had been contracted under LT arrangements,
with an increase in Requests for Proposals for new LT contract tenders during August and
September 2023 emerging.
Post end of FY 23 a coup in Niger now seems to be increasing uranium supply risk to western
markets from that country, adding further pressure on supply. At time of writing in September
2023, a shortage of spot supply on the market, and aggressive buying by traders and financial
funds, has seen the spot price lift dramatically. This will no doubt transfer to increased pressure
on LT pricing.
14
2023 Annual Report
CHAIRMAN & CHIEF EXECUTIVE OFFICER’S LETTER
(CONTINUED)
During the 2022/23 financial year, Alligator has continued to add to its experienced team as
it increases its Samphire Project development work, and re-starts exploration post the Covid
delays. Some of our key hires during the year including Fiona Nicholls as Non-Executive
Director and Michael Barlow as Group Exploration Manager.
Post the end of FY 23, your Company has successfully undertaken a significant capital raise,
and initiated a Share Purchase Plan. Total funds raised will provide a substantial runway for
Alligator to progress its advancing Samphire project towards ISR uranium production, at a time
of increasing interest in future uranium offtake contracts into an expanding nuclear fuel market.
On behalf of the Board, we thank all our shareholders and stakeholders for continuing to support
and work with Alligator in the 2022-2023 year, and we extend special thanks for the support and
understanding of the Traditional Owners, local pastoralists, and local communities on whose
lands we explore, and to our high performing and dedicated exploration and business teams
for the great work they do.
Paul Dickson
Chairman
28 September 2023
2023 Annual Report
Gregory Hall
CEO and Managing Director
28 September 2023
15
ALLIGATOR GROUP TENURE HOLDINGS AT 30 JUNE 2023:
16
2023 Annual Report
ALLIGATOR ENERGY - PROJECT LOCATIONS
ITALY
Piedmont NW
Ni-Co-Cu-Au-PGEs
NT, AUSTRALIA
Alligator Rivers
(ARUP)
High Grad U
SA, AUSTRALIA
Samphire
ISR style
U resources
2023 Annual Report
SA, AUSTRALIA
Big Lake (Cooper
Basin)
ISR style U
17
ENVIRONMENT, SOCIAL AND GOVERNANCE (ESG) - OUR
PHILOSOPHY AND ESG IN ACTION
Alligator’s ESG philosophy is to understand what our stakeholders value and their key issues
and concerns, which then drive how we operate. To this end Alligator has developed its “Working
with Stakeholders” plan as follows:
•
•
•
•
•
We aim to add value in all of our decision-making for shareholders.
We wish to provide an engaging, challenging, enjoyable and respectful workplace for our
employees.
We respect the rights of landowners and communities and seek to collaborate for our
mutual benefit.
We respect the cultural heritage and connection to country of Traditional Owners and wish
to create mutually beneficial opportunities.
We aim for a low impact on the environment, through innovation, use of latest technology,
and responsible land management techniques.
Shareholders
Communities
Team
STAKEHOLDER
PERSPECTIVE
Focus on
Environment
Landowners
Traditional
Owners
To embed this philosophy long-term in the business, AGE is in the process of developing an
ESG framework that:
• Considers material topics (for example, land and biodiversity management, Aboriginal
heritage, uranium and radiation, and local communities) relevant to an exploration and
development company, while leveraging international guidance such as the Global Reporting
Initiative (GRI);
• Engages with our stakeholders to understand their perspectives, shared values and outcome
expectations, and
• Drives our performance, informs strategy and identifies further actions for implementation.
18
2023 Annual Report
ENVIRONMENT, SOCIAL AND GOVERNANCE (ESG) - OUR
PHILOSOPHY AND ESG IN ACTION (CONTINUED)
Alligator Energy acknowledges and respects that the topic of uranium is a concerning one
for some people. We will always work to better understand any concerns people have and
provide information about the project and the environmental protections that must be followed
as transparently and openly as possible.
As we evolve from an exploration company to a developer through advancing the Samphire
Project to the next stage of feasibility, so are our approaches and commitments to ESG
increasing. We will continue to develop and deliver ESG outcomes which are fit for purpose
and at a level commensurate with community and other stakeholder expectations.
The following sections outline how we are putting our ESG philosophy into practice. Importantly,
our current activities undertaken at Big Lake (South Australia), Nabarlek (Northern Territory)
and Piedmont (Italy) are largely short-term, and campaign based. This is in contrast to the
significant and ongoing activities at the Samphire Project. As a result, the following largely
focusses on delivery of our ESG philosophy and outcomes at Samphire, with commentary on
other portfolio projects, as appropriate.
Environment
Samphire Uranium Project (20km South of Whyalla, South Australia)
At Samphire, we are committed to collaborating with the immediate and surrounding landholders
to improve the quality of the land and local environment to a level close to pre-pastoral use.
Pastoral activity has occurred for more than 100 years at this location, and our aim is to
demonstrate that mineral exploration and pastoral activities can successfully co-exist..
During FY23, we were awarded a Commendation in the South Australian Premier’s Awards
for Energy and Mining (Environment category) for the Company’s approaches to improving
biodiversity and pastoral conditions at the Samphire site, aiming to achieve double the current
bush density upon rehabilitation.
Drilling activities are planned and executed with the aim of minimising environmental