Global Uranium Conference Presentation - November 2023
Released
Released
Announcement PDF
ASX: AGE
Global Uranium Conference
November 2023
Disclaimer
Disclaimer
This presentation contains projections and forward-looking information that involve various risks and uncertainties
regarding future events. Such forward-looking information can include without limitation statements based on current
expectations involving a number of risks and uncertainties and are not guarantees of future performance of the Company.
These risks and uncertainties could cause actual results and the Company’s plans and objectives to differ materially from
those expressed in the forward-looking information. Actual results and future events could differ materially from
anticipated in such information. These and all subsequent written and oral forward-looking information are based on
estimates and opinions of management on the dates they are made and expressly qualified in their entirety by this notice.
The Company assumes no obligation to update forward-looking information should circumstances or management’s
estimates or opinions change.
Competent Person’s Statement – Uranium
Information in this report is based on current and historic Exploration and Resource Drilling Results compiled by Dr
Andrea Marsland-Smith, who is a Member of the AusIMM. Dr Marsland-Smith is employed by Alligator Energy as Chief
Operating Officer (COO) and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity she is undertaking (including 21 years working with ISR uranium development and
operations) to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves. Dr Marsland-Smith consents to the inclusion in this release of
the matters based on her information in the form and context in which it appears.
Competent Person’s Statement – Nickel Cobalt exploration
Information in this report is based on current and historic Exploration Results compiled by Mr Geoffrey Chapman who is a
Fellow of the Australasian Institute of Mining and Metallurgy. Mr Chapman is a Consultant Geologist with Alligator Energy
Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Chapman consents to
the inclusion in this release of the matters based on his information in the form and context in which it appears.
2
Corporate Presentation | November 2023 | ASX:AGE
Project Pipeline
EARLY-STAGE
GREENFIELD
PROSPECTIVE
GREENFIELD
DEVELOPMENT
POTENTIAL
NABARLEK
NORTH
TIN CAMP
CREEK
SAMPHIRE
U40 Nearology
Caramal Resource
PIEDMONT
BEATRICE
Rediscovered Ni, Co & Cu
province in Northern Italy
Beatrice Prospect
CONCEPTUAL
BIG LAKE
Analogous to
Hydro-carbon Basins Kazak & Wyoming
STRATEGIC
MINERALS
on Current Titles plus
opportunities
OTHER URANIUM + ENERGY
MINERAL OPPORTUNITIES
3
Corporate Presentation | November 2023 | ASX:AGE
M&A TEAM
IN PLACE
Blackbush
18.1 Mlb ISR
Amenable
Resource
Plumbush
Historical Prospect
Exploration Target
Samphire Uranium Project - Overview
• 20km south of Whyalla
• Previously the focus of work by UraniumSA between 2009 and 2012 – drilled over
500 drillholes. AGE acquired the project in late 2020.
• One uranium deposit (Blackbush,18.1Mlbs U3O8(1)) and historical prospect
(Plumbush) hosted in the Kanaka sand beds in palaeochannels ~ 60-80m depth.
• AGE ‘s work at Blackbush since early 2022
-
Confirmatory and extensional drilling
-
Geophysics
-
Metallurgical test-work (ANSTO)
-
Retention Lease approvals to conduct a field recovery trial
-
Two mineral resource estimations (update in progress)
-
Scoping study for full-scale operation (update in progress)
(1) AGE ASX Release https://wcsecure.weblink.com.au/pdf/AGE/02639068.pdf
4
Corporate Presentation | November 2023 | ASX:AGE
Samphire Uranium Project - Geology
5
Corporate Presentation | November 2023 | ASX:AGE
Samphire Uranium Project: Mineral Resource Estimates
•
Initial ISR Mineral Resource Estimate (August 2022) for the Blackbush Deposit of 14.8 Mlbs (combined Inferred and Indicated)
for a cut-off grade of 250ppm U3O8.
•
Increased to 18.1 Mlbs U3O8 (March 2023) following additional drilling. Using same cut-off grade – resulting in a 78% category
transfer and increase in the Indicated Mineral Resource.
•
Further increase based on drilling underway targeted for Nov 2023.
JORC
Category
Mt
Grade
(U3O8 ppm)
U3O8 Metal
(KTonnes)
U3O8 Metal
(Mlbs)
Indicated
6.1
796
4.8
10.7
Inferred
5.3
633
3.4
7.4
Total
11.4
720
8.2
18.1
ASX Release – 2 March 2023
• Resource suitable for a small start-up ISR operation
6
-
Favourable ANSTO testwork for (33 days test using typical ISR conditions on core show a high level of uranium extraction (92 to 96% range)
-
Favourable permeability of the host formation from previous hydrogeological work undertaken by Uranium SA Ltd
-
Proximity to Whyalla – locally based workforce (no FIFO and camp)
-
Shallow deposit (60 to 80m depth)
-
Local experienced mining services and business support, lower cost of key infrastructure.
Corporate Presentation | November 2023 | ASX:AGE
Samphire Uranium Project – Resource Growth at Blackbush
•
Coherent multi-level high-grade zones with
cumulative strike length of >2,700m and width
between 300-450m.
7
Corporate Presentation | November 2023 | ASX:AGE
Samphire Uranium Project – Field Recovery Trial
Field Recovery Trial for 1H of 2024* to confirm parameters to be used in a full feasibility study during 2024.
* On receipt of all regulatory approvals
•
FRT will finalise in-situ chemistry, hydrogeology, uranium recovery, environmental and economic factors for Feasibility Study.
•
Approval for Retention Lease for FRT – post public consultation now final stage.
•
Will consist of three producing wells and a containerised pilot plant (on for 3-4 months)
•
Confirms data and information needed for Mining Lease approvals from State and Federal Governments.
•
After planned and any future testing, well infrastructure and containerised pilot process plant removed, and area rehabilitated – pilot plant
available for future satellite field testing.
Ion Exchange Module
Pilot plant layout
8
Corporate Presentation | November 2023 | ASX:AGE
Wellhouse (Pipe room) Module
Samphire Uranium Project Scoping Study: Key Metrics
A$129.3 m
3.5 years
29%
A$152.0 m
US$30.20 /lb
US$17.9 /lb
CAPEX
(including contingency)
Payback
IRR*
(post-tax, real, ungeared)
NPV8*
(post-tax, real, ungeared)
AISC
(A$ 43.2 /lb)
Cash Costs
(A$25.6 /lb)
*Calculated using US$65 per lb uranium price and 0.70 US/A$ exchange rate inclusion of significant contingencies and inflation of 40%.
Potential to scale and optimise plant
•
Currently undertaking resource and Scoping Study update – plan for increased production target of 1.2Mlbs pa.
•
Modular plant to enable production capacity scalable.
•
Further exploration potential for additional uranium at Blackbush deposit, then south to Plumbush deposit plus wider
exploration on known channels.
•
Scope for processing efficiencies, in particular to reduce costs around RO plant, and increase recovery rates.
9
Corporate Presentation | November 2023 | ASX:AGE
Samphire Uranium Project – Exploration
Local and district-scale resource growth potential
• Plumbush Deposit not adequately tested nor is its relationship to
Blackbush Deposit known.
• High-resolution ground gravity acquired (Sept 2022) to improve
palaeochannel resolution.
• Regional ground gravity shows significant palaeochannel
extensions.
− Immediate focus for near-future drill programs
− Potential for palaeochannel system to extend north and south of the current
defined area
− Potential for additional satellite deposits
• Developing an ‘exploration target range’ for the Project
Regional filtered ground gravity showing potential palaeochannel extensions and Blackbush palaeochannel (defined by drilling).
10 Corporate Presentation | November 2023 |
ASX:AGE
Samphire Uranium Project: Next steps
Intention to rapidly progress next steps
DECEMBER 2023
FABRICATION OF
CONTAINERISED PILOT
PLANT COMPLETE
NOVEMBER 2023
SCOPING STUDY UPDATE
COMMENCE FIELD
RECOVERY TRIAL (FRT)
(Subject to DEM approvals)
Q4 2024
FURTHER RESOURCE
UPDATE
2023
Q3
Q1 2025
INITIAL CONDITIONAL
OFFTAKE CONTRACTS
2025
2024
Q4
SEPTEMBER 2023
COMPLETE RESOURCE DRILLING
Q1
DECEMBER 2023
FEASIBILITY STUDY
ENGINEERING
NOVEMBER 2023
EOI/TENDERS
UPDATED SAMPHIRE
RESOURCE
NOVEMBER 2023
RELEASE OF
EXPLORATION
TARGET RANGE
Corporate Presentation | November 2023 | ASX:AGE
Q2
Q2 2024
COMMENCE
FEASIBILITY STUDY
Q3
Q4
Q1
Q1 2025
TARGET
COMPLETION
FEASIBILITY STUDY
Q2
ASX: AGE
Dr Andrea Marsland-Smith COO
+61 (0) 7 3839 3904
ams@alligatorenergy.com.au
www.alligatorenergy.com.au