Half Year Financial Report
Released
Released
Announcement PDF
ACN 140 575 604 • Level 1, 103 King William Street, Kent Town, SA 5067 • +61 (0) 8 7092 6230 • info@alligatorenergy.com.au •
www.alligatorenergy.com.au
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
31 December 2025
HALF YEAR FINANCIAL REPORT
ACN 140 575 604 • Level 1, 103 King William Street, Kent Town, SA 5067 • +61 (0) 8 7092 6230 • info@alligatorenergy.com.au •
www.alligatorenergy.com.au
CONTENTS Page
Directors’ Report 1
Auditor’s Independence Declaration 5
Consolidated Statement of Profit or Loss and Other Comprehensive Income 6
Consolidated Statement of Financial Position 8
Consolidated Statement of Changes in Equity 9
Consolidated Statement of Cash Flows 10
Notes to the Financial Statements 11
Directors’ Declaration 18
Independent Auditor’s Review Report to Members 19
Competent Person’s Statement 21
CORPORATE OFFICE
Level 1
103 King William Street
Kent Town
SA 5067
Ph: 08 70926230
Postal Address
Level 1
103 King William Street
Kent Town
SA 5067
The information in this report should be read in conjunction with the Annual Report for the year ended
30 June 2025 which is available from the Alligator Energy Limited website:
www.alligatorenergy.com.au
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
ACN 140 575 604 • Level 1, 103 King William Street, Kent Town, SA 5067 • +61 (0) 8 7092 6230 • info@alligatorenergy.com.au • Page 1
www.alligatorenergy.com.au
DIRECTORS’ REPORT
The Directors of Alligator Energy Limited (the ‘Company’, ‘Alligator’, ‘AGE’) and its controlled entities
(the ‘Group’) present their report, together with the financial statements of the Group, for the half-year
ended 31 December 2025.
Directors
The following persons were Directors of Alligator Energy Limited (‘Alligator’) during the half-year and
up to the date of this report, unless stated otherwise:
Paul Dickson Non-Executive Chairman
Fiona Nicholls Non-Executive Director
Peter McIntyre Non-Executive Director
Daniel Lougher Non-Executive Director (appointed 15 December 2025)
Gregory Hall Executive Director (Non-Executive Director 1 February 2026)
Callum McIntyre Alternate Director for Peter McIntyre
Principal activities
The principal activities of the Group are uranium and energy minerals exploration and development.
There were no significant changes in the nature of the Group’s activities during the half-year.
Dividends
There were no dividends paid to shareholders during the half-year.
Review of operations
(i) Exploration and Evaluation activities
Samphire Project, South Australia
During the half year, the Company made significant progress at its 100% owned Samphire
Uranium Project, transitioning the Project from approvals and planning into active on ground
execution. The key operational focus for the period was the advancement of the Samphire Field
Recovery Trial (FRT), which represents the most important derisking step toward future
development and production.
The FRT is designed to generate critical operational and recovery data to validate the Project’s in-
situ recovery (ISR) parameters, underpin the upcoming feasibility studies, and support the Mining
Lease approval pathway. The Company views this trial as a major milestone in positioning
Samphire as Australia’s most advanced ISR uranium development opportunity.
A major achievement during the period was the securing of final regulatory approval to commence
construction of the FRT. Following extensive engagement with the South Australian Department
for Energy and Mining (DEM), Alligator received final approval of the Program for Environment
Protection and Rehabilitation (PEPR) in August 2025, which enabled on-ground works to
commence. This approval reflected the strength of Alligator’s environmental and technical work
programs, as well as the collaborative relationship developed with regulators and local
stakeholders throughout the assessment process.
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
ACN 140 575 604 • Level 1, 103 King William Street, Kent Town, SA 5067 • +61 (0) 8 7092 6230 • info@alligatorenergy.com.au • Page 2
www.alligatorenergy.com.au
DIRECTORS’ REPORT
(continued)
With approvals in place, Alligator moved rapidly into execution. Contractor mobilisation
commenced on schedule in early October 2025, with Ahrens undertaking civil works in
preparation for plant construction. At the same time, drilling progressed strongly, with 75% of
well patterns drilled ahead of schedule, demonstrating strong momentum early in the execution
phase.
In early November 2025, Alligator achieved another key milestone with the successful delivery of
the ISR pilot plant to site near Whyalla. Following completion of earthworks and bund installation,
mechanical, electrical and pipework installation commenced promptly. During the same period,
the Company confirmed completion of the recovery well patterns for Areas A and B, while civil
works continued to progress in line with schedule.
These milestones demonstrated strong coordination between Alligator and its contractors and
confirmed the robustness of the Company’s execution plan, with multiple workstreams
progressing in parallel across construction, drilling and operational readiness.
The most significant operational achievement of the half year occurred in December 2025, with
Practical Completion achieved for the construction of the Samphire pilot plant. The construction
was completed safely, on schedule and under budget, validating Alligator’s disciplined delivery
approach and strong project management capability. Safety performance across the construction
phase was exemplary, with only one minor first aid incident recorded, reflecting the high safety
standards maintained by Alligator and the contractors throughout the build program.
With construction now complete, the Company is well positioned to commence FRT operations
in February 2026, with initial recovery results expected during the March 2026 quarter. The FRT
represents a key derisking milestone for the Samphire Project, designed to validate the ISR
operating performance by confirming critical operating parameters and recovery characteristics.
Outcomes from the trial will directly support future development decisions and inform ongoing
feasibility and approvals workstreams, which commenced during the reporting period.
Alligator Rivers Province (ARUP) – TCC, Beatrice and Nabarlek North Projects
During the half year, the Company completed a significant portfolio rationalisation through the
divestment of its non-core Northern Territory (NT) uranium assets, strengthening the Company’s
liquidity position and sharpening management focus on its South Australian assets.
The divestment, for total consideration of $7.5 million, represents a full exit from the NT uranium
assets and aligns with Alligator’s disciplined capital allocation strategy. It materially improves
Alligator’s liquidity and funding flexibility, while eliminating future holding costs and exploration
expenditure associated with maintaining a multi-jurisdictional asset base.
In addition to the improved liquidity, the transaction was designed to simplify the business, reduce
complexity and allow management attention and capital to be concentrated on the Company’s
South Australian uranium projects, where the Company sees the greatest potential to unlock near
term and longer term shareholder value.
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
ACN 140 575 604 • Level 1, 103 King William Street, Kent Town, SA 5067 • +61 (0) 8 7092 6230 • info@alligatorenergy.com.au • Page 3
www.alligatorenergy.com.au
DIRECTORS’ REPORT
(continued)
The first tranche proceeds are expected in the March 2026 quarter and were not reflected in the
Company’s half year accounts at 31 December 2025. Proceeds from the divestment are intended
to support accelerated work programs on Alligator’s core South Australian assets, including
drilling to enhance the Samphire Mineral Resource Estimate and concurrent feasibility and
development activities.
Overall, the divestment demonstrates strong portfolio discipline and positions the Company with
improved balance sheet resilience and a clear strategic focus as it progresses toward its
development objectives.
Big Lake Uranium (BLU), South Australia
At the Big Lake Uranium Project, technical review and targeting work continued during the half
year, including ongoing collection of historic gamma information from petroleum wells, re-
logging and lithological/gamma analysis of drill core stored at the Adelaide Drill Core Library,
and redox logging of aircore chips across a number of the Big Lake exploration licences.
Field access was limited during 2025 due to flooding and heavy rainfall in the region. However,
planning is now well advanced for a revised drilling program, with drilling targeted to commence
during the March 2026 quarter, subject to weather and site access conditions.
Investment in EnviroCopper Limited (ECL) – Cu ISR
During the period, ECL secured a $3.5 million contribution from an international partner to
support feasibility and technical advancement of its South Australian ISR copper projects,
including Kapunda and Alford. The funding (received in December 2025) is accompanied by
technical collaboration, with the investor also able to convert the contribution into a 16.8% equity
interest in ECL within a five-year period, further strengthening the value proposition of Alligator’s
investment. Progress at Kapunda also continued, with groundwater conditioning commenced as
part of the Site Environmental Lixiviant Test (SELT) program.
(ii) Financial
The loss for the consolidated group for the half-year was $4,964,381 (Half-year to 31 December
2024: $1,471,177).
The increase in the half-year loss of $3,493,204 was primarily driven by the impairment charge
recognised in relation to discontinued operations. This impairment reflects the write-down of the
ARUP tenements to their fair value less costs to sell following the decision to discontinue activities
associated with this asset group. The loss attributed from the discontinued operations totalled
$3,512,711. Excluding this impact, the underlying loss from continuing operations remained
broadly consistent with the prior period.
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
ACN 140 575 604 • Level 1, 103 King William Street, Kent Town, SA 5067 • +61 (0) 8 7092 6230 • info@alligatorenergy.com.au • Page 4
www.alligatorenergy.com.au
DIRECTORS’ REPORT
(continued)
(iii) Environment, Social and Governance (ESG)
Alligator is committed to sound ESG practices across all facets of its business and is continuing
the process of establishing a framework and goals to support sustainable operating activities across
its portfolio of development and exploration projects. During the period:
• The Company has continued to engage with landholders and relevant stakeholders in
relation to its activities, with stakeholder engagement forming an integral part of
project planning and execution.
• The Company implemented a corporate restructure to strengthen governance and better
align management capability with current and future operational requirements.
• Exploration and operational activities have continued in compliance with applicable
environmental approvals, applying low-disturbance practices, minimising unnecessary
land disturbance and implementing progressive site rehabilitation within FRT
operational boundaries and other exploration leases. Environmental stewardship and
regulatory compliance remain ongoing priorities for the Company.
(iv) Matters subsequent to the end of the half-year
No matter or circumstance has arisen since 31 December 2025 that has significantly affected, or
may significantly affect:
• The Group’s operations in future financial years, or
• The results of those operations in future financial years, or
• The Group’s state of affairs in future financial years.
(v) Auditor’s Independence Declaration
The auditor’s independence declaration as required under section 307C of the Corporations Act
2001 is set out on page 5.
This report is made in accordance with a resolution of the Board of Directors made pursuant to
section 306(3) of the Corporations Act 2001.
Paul Dickson
Chairman
Adelaide, 26 February 2026
PKF Brisbane Pty Ltd is a member of PKF Global, the network of member firms of PKF International Limited, each of which is a separately owned legal entity and does not
accept any responsibility or liability for the actions or inactions of any individual member or correspondent firm(s). Liability limited by a scheme approved under
Professional Standards Legislation.
AUDITOR’S INDEPENDENCE DECLARATION
UNDER SECTION 307C OF THE CORPORATIONS ACT 2001
TO THE DIRECTORS OF
ALLIGATOR ENERGY LIMITED
I declare that, to the best of my knowledge and belief, during the half-year ended 31 December 2025, there
have been:
(a) no contraventions of the auditor independence requirements of the Corporations Act 2001 in
relation to the review; and
(b) no contraventions of any applicable code of professional conduct in relation to the review.
This declaration is in respect of Alligator Energy Limited and the entities it controlled during the half year.
PKF BRISBANE AUDIT
LIAM MURPHY
PARTNER
26 FEBRUARY 2026
BRISBANE
PKF Brisbane Audit
ABN 33 873 151 348
Level 2, 66 Eagle Street
Brisbane, QLD 4000
Australia
+61 7 3839 9733
brisbane@pkf.com.au
pkf.com.au
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
ACN 140 575 604 • Level 1, 103 King William Street, Kent Town, SA 5067 • +61 (0) 8 7092 6230 • info@alligatorenergy.com.au • Page 6
www.alligatorenergy.com.au
CONSOLIDATED STATEMENT OF PROFIT OR LOSS
AND OTHER COMPREHENSIVE INCOME
FOR THE HALF-YEAR ENDED 31 DECEMBER 2025
Note
31 December
2025
31 December
2024
$ $
Revenue
Other income – interest
Other income – sundry
R&D Tax incentive income
474,998
749
702,173
736,556
-
-
Expenses
Accounting and audit fees (24,490) (66,422)
Consultants and professional fees (88,147) (15,043)
Directors’ fees (107,881) (102,415)
Employee benefits expense (incl taxes) (1,054,995) (796,692)
Share-based payments (160,401) (211,301)
Depreciation (47,227) (42,440)
Occupancy expenses (29,498) (39,870)
Stock exchange and share registry fees (167,699) (149,951)
Travel and accommodation expenses (57,216) (76,446)
Insurance (60,476) (61,800)
Investor relations (49,943) (40,481)
Business development (211,154) (184,739)
Foreign exchange (loss)/gain (315) -
IT costs (incl licences) (132,142) (75,554)
Interest expense – ROU asset (4,915) (6,726)
Other expenses (433,091) (186,915)
Loss before income tax (1,451,670) (1,471,177)
Income tax expense - -
Loss from continuing operations (1,451,670) (1,320,267)
Loss from discontinued operations (3,512,711) (150,910)
Loss for the period (4,964,381) (1,471,177)
Other comprehensive income - -
Total comprehensive loss for the period (4,964,381) (1,471,177)
Total loss for the period attributable to members
of the parent entity from:
Continuing operations (1,451,670) (1,320,267)
Discontinued operations (3,512,711) (150,910)
(4,964,381) (1,471,177)
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
ACN 140 575 604 • Level 1, 103 King William Street, Kent Town, SA 5067 • +61 (0) 8 7092 6230 • info@alligatorenergy.com.au • Page 7
www.alligatorenergy.com.au
CONSOLIDATED STATEMENT OF PROFIT OR LOSS
AND OTHER COMPREHENSIVE INCOME
FOR THE HALF-YEAR ENDED 31 DECEMBER 2025
Note
31 December
2025
31 December
2024
$ $
Total comprehensive loss attributable to members
of the parent entity from:
Continuing operations (1,451,670) (1,320,267)
Discontinued operations (3,512,711) (150,910)
(4,964,381) (1,471,177)
Loss per share from continuing operations: Cents Cents
Basic earnings/(loss) per share (0.037) (0.034)
Diluted earnings/(loss) per share (0.037) (0.034)
Loss per share from discontinued operations: Cents Cents
Basic earnings/(loss) per share (0.075) (0.004)
Diluted earnings/(loss) per share (0.075) (0.004)
The accompanying notes form part of these financial statements.
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
ACN 140 575 604 • Level 1, 103 King William Street, Kent Town, SA 5067 • +61 (0) 8 7092 6230 • info@alligatorenergy.com.au • Page 8
www.alligatorenergy.com.au
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
AS AT 31 DECEMBER 2025
Note
31 December 30 June
2025
$
2025
$
ASSETS
Current Assets
Cash and cash equivalents 20,578,255 30,149,797
Trade and other receivables 833,693 626,558
Inventories 6,729 76,568
Assets held for sale 5 7,682,705 -
Total Current Assets 29,155,347 30,852,923
Non-Current Assets
Trade and other receivables 2,936,979 706,191
Plant and equipment 6 8,793,971 4,090,194
Right of use asset 141,411 174,105
Financial assets 2,703,319 2,703,319
Exploration and evaluation expenditure 7 33,973,479 40,960,085
Total Non-Current Assets 48,549,159 48,633,894
Total Assets 77,650,541 79,486,817
LIABILITIES
Current Liabilities
Trade and other payables 4,448,585 1,444,720
Unearned revenue 8 100,000 -
Lease liabilities 68,033 66,114
Liabilities associated with assets held for sale 5 404,310
Total Current Liabilities 5,020,928 1,510,834
Non-Current Liabilities
Lease liabilities 84,444 118,948
Provisions 84,559 504,090
Total Non-Current Liabilities 169,003 623,038
Total Liabilities 5,189,931 2,133,872
Net Assets 72,460,610 77,352,945
EQUITY
Contributed equity 9 116,573,512 116,458,906
Reserves 1,017,271 1,226,117
Accumulated losses (45,130,173) (40,332,078)
Total Equity 72,460,610 77,352,945
The accompanying notes form part of these financial statements.
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
ACN 140 575 604 • Level 1, 103 King William Street, Kent Town, SA 5067 • +61 (0) 8 7092 6230 • info@alligatorenergy.com.au • Page 9
www.alligatorenergy.com.au
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
FOR THE HALF-YEAR ENDED 31 DECEMBER 2025
Contributed
equity
Reserves Accumulated
Losses Total
$ $ $ $
Balance at 1 July 2024 100,123,598 324,882 (34,595,353) 65,853,127
Total comprehensive loss for
the period - (1,471,177) (1,471,177)
Transactions with owners in
their capacity as owners:
Equity contributions (net) - - - -
Share options – value of expense - 211,301 - 211,301
Share options exercised/expired 151,499 (280,109) 128,610 -
Balance at 31 December 2024 100,275,097 256,074 (35,937,917) 64,593,253
Balance at 1 July 2025 116,458,906 1,226,117 (40,332,078) 77,352,945
Total comprehensive loss for the
period - - (4,964,381) (4,964,381)
Transactions with owners in
their capacity as owners:
Share options – value of expense - 160,401 - 160,401
Options exercised/lapsed 202,962 (369,247) 166,286 -
Issue of ordinary shares - - - -
Capital raising costs (88,356) - - (88,356)
Balance at 31 December 2025 116,573,512 1,017,271 (45,130,173) 72,460,610
The accompanying notes form part of these financial statements.
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
ACN 140 575 604 • Level 1, 103 King William Street, Kent Town, SA 5067 • +61 (0) 8 7092 6230 • info@alligatorenergy.com.au • Page 10
www.alligatorenergy.com.au
CONSOLIDATED STATEMENT OF CASH FLOWS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2025
31 December
2025
31 December
2024
$ $
Cash flows from operating activities
Interest received 474,998 736,557
R&D Incentive received 702,173 -
Payments to suppliers and employees (2,781,086) (1,738,141)
Net cash outflow from operating activities (1,603,915) (1,001,584)
Cash flows from investing activities
Deposit received relating to assets held for sale 100,000 -
Payments for exploration expenditure (3,361,483) (6,331,068)
Receipts from Govt Grants for exploration - 72,450
Payments for tenement bonds and security deposits (2,230,788) (185,545)
Payments for purchase of fixed assets (21,559) (133,136)
Payments for capital works in progress (FRT) (2,332,857) (294,421)
Investment in EnviroCopper Ltd - (228,993)
Net cash (outflow) from investing activities (7,846,687) (7,100,623)
Cash flows from financing activities
Payment of capital raising costs (88,356) -
Lease payments (32,584) (37,496)
Net cash inflow from financing activities (120,940) (37,496)
Net (decrease)/increase in cash held (9,571,542) (8,139,703)
Cash and cash equivalents at the beginning of the financial
period
30,149,797 28,392,442
Cash and cash equivalents at the end of financial period 20,578,255 20,252,740
The accompanying notes form part of these financial statements.
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
ACN 140 575 604 • Level 1, 103 King William Street, Kent Town, SA 5067 • +61 (0) 8 7092 6230 • info@alligatorenergy.com.au • Page 11
www.alligatorenergy.com.au
NOTES TO THE FINANCIAL STATEMENTS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2025
Note 1 General information and material accounting policy information
Basis of preparation of half-year financial statements
These consolidated interim financial statements and notes represent those of Alligator Energy Limited
(the Company) and Controlled Entities (the Group or Consolidated Entity). Alligator Energy Limited is a
publicly listed company incorporated and domiciled in Australia.
These general purpose interim financial statements for the half-year reporting period ended 31 December
2025 have been prepared in accordance with requirements of the Corporations Act 2001 and Australian
Accounting Standard AASB 134: Interim Financial Reporting. The Group is a for-profit entity for
financial reporting purposes under Australian Accounting Standards. The financial statements are
presented in Australian dollars.
This interim financial report is intended to provide users with an update on the latest annual financial
statements of the Group. As such, it does not contain information, or all the notes of the type normally
included in the annual financial report. It is therefore recommended that this financial report be read in
conjunction with the annual financial statements of the Group for the year ended 30 June 2025, together
with any public announcements made during the half-year in accordance with the continuous disclosure
requirements of the Corporations Act 2001 and the ASX Listing Rules.
These interim financial statements have been approved and authorised for issue by the Directors on 26
February 2026. The interim financial report has been prepared on the basis of historical cost, except for
the statement of cashflows. Cost is based on the fair values of consideration in exchange for assets.
Material accounting policies
The same accounting policies and methods of computation have been followed in this half-year financial
report as were applied in the most recent annual financial statements, except in relation to the matter
discussed below.
New and revised accounting requirements applicable to the current half-year reporting period
The group has adopted all of the new or amended Accounting Standards and Interpretations issued by the
Australian Accounting Standards Board (‘AASB’) that are mandatory for the current reporting period.
Any new or amended Accounting Standards or Interpretations that are not yet mandatory have not been
early adopted. None of the new standards or amendments to standards that are mandatory for the first time
materially affected any of the amounts recognised in the current period or any prior period.
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
ACN 140 575 604 • Level 1, 103 King William Street, Kent Town, SA 5067 • +61 (0) 8 7092 6230 • info@alligatorenergy.com.au • Page 12
www.alligatorenergy.com.au
NOTES TO THE FINANCIAL STATEMENTS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2025
Note 1 General information and material accounting policy information (continued)
Going Concern
The financial statements have been prepared on a going concern basis that presumes the realisation of
assets and the discharge of liabilities in the normal course of operations for the foreseeable future.
During the six months ended 31 December 2025, the Group made an operating loss before tax of
$4,964,381 (2024: $1,471,177). Cash outflows from operating and investing activities during the same
period were $9,450,602 (2024: $8,102,207). The Group’s ability to continue on a going concern basis
is therefore dependent upon its ability to manage its current cash resources, raise additional capital
through farm-out arrangements with strategic partners or share issues to existing shareholders or new
investors.
The Directors are confident of being able to manage the current cash resources and expenditure
commitments as appropriate and to continue to secure additional funding requirements as necessary.
On this basis they believe the Group is a going concern and will be able to pay its debts as and when
they fall due and payable.
Note 2 Critical accounting estimates and judgements
Estimates and judgements are continually evaluated and are based on historical experience and other
factors, including expectations of future events that may have a financial impact on the entity and that
are believed to be reasonable under the circumstances.
Critical judgements in applying the entity’s accounting policies
The Group has capitalised exploration expenditure of $33,973,479 (30 June 2025: $40,960,085). This
amount includes costs directly associated with exploration and the purchase of interests in exploration
titles. These costs are capitalised as an intangible asset until assessment and/or drilling of the permit is
complete and the results have been evaluated. These direct costs include employee remuneration,
materials, rentals, camp costs and payments to contractors for services such as drilling and geotech
surveys. The expenditure is carried forward until such a time as the area moves into the development
phase, is abandoned or sold. Given exploration activities have not yet reached a stage which permits a
reasonable assessment of the existence or otherwise of recoverable resources and the difficulty in
forecasting cash flows to assess the fair value of exploration expenditure, there is uncertainty as to the
carrying value of exploration expenditure. The ultimate recovery of the carrying value of exploration
expenditure is dependent upon the successful development and commercial exploitation or,
alternatively, sale of the interest in the tenements. The Directors are of the opinion that the exploration
expenditure is recoverable for the amount stated in the financial report.
Provision for site restoration
The Group estimates the cost of rehabilitating disturbances as a result of exploration activity. These
estimates are based on the requirements of current legislation, comprise an estimate of the external costs
to rehabilitate and are consistent with the amounts reported to the Department of Tourism, Industry and
Trade in the Northern Territory and the Department of Energy and Minerals in South Australia.
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
ACN 140 575 604 • Level 1, 103 King William Street, Kent Town, SA 5067 • +61 (0) 8 7092 6230 • info@alligatorenergy.com.au • Page 13
www.alligatorenergy.com.au
NOTES TO THE FINANCIAL STATEMENTS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2025
Note 3 Segment information
Operating segments are identified, and segment information disclosed, on the basis of internal reports
that are regularly provided to, or reviewed by, the Group’s chief operating decision maker which, for
the Group, is the Board of Directors. In this regard, the Board of Directors confirms that the Group
continues to operate in one operating segment, being mining and exploration.
All significant operating assets and activities are located in Australia. The only revenue during the period
related to interest, R&D tax incentives & miscellaneous supply sales and was generated solely within the
Australian jurisdiction.
Note 4 Dividends
No dividend has been paid during the half-year ended 31 December 2025 and none is proposed.
Note 5 Assets held for sale
During the period, the company entered into a binding Sale and Purchase Agreement (“SPA”) with
DevEx Resources Limited for the sale of the Company’s interests in:
• TCC Project Pty Ltd (100% shareholding);
• Northern Prospector Pty Ltd (100% shareholding); and
• Associated exploration tenements.
Under the SPA, DevEx will acquire the above interests for a total consideration of $7.5 million,
comprising:
Cash consideration $3,750,000
Share based consideration (at the election of Purchaser) $2,000,000
Deferred consideration (discounted at present value) $1,633,127
Less:
Estimated costs ($104,732)
Total net consideration $7,278,395
Completion of the transaction is expected to occur within 12 months. The disposal group has therefore
been classified as held for sale, as it is available for immediate sale in its current condition and the sale
is considered highly probable.
ALLIGATOR ENERGY LIMITED
AND CONTROLLED ENTITIES
ACN 140 575 604
ACN 140 575 604 • Level 1, 103 King William Street, Kent Town, SA 5067 • +61 (0) 8 7092 6230 • info@alligatorenergy.com.au • Page 14
www.alligatorenergy.com.au
NOTES TO THE FINANCIAL STATEMENTS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2025
Measurement
In accordance with AASB 5, the disposal group has been measured at the lower of its carrying amount
and its fair value less costs to sell.
The net fair value of the disposal group of $7,278,393 consist of the following assets and liabilities:
Carrying amounts of assets classified as held for sale
Exploration and evaluation assets $7,197,610
Tenement bonds and deposits $458,312
Other assets included in the disposal group $26,783
Total assets classified as held for sale $7,682,705
Liabilities directly association with assets held for sale
The liabilities classified as associated with the disposal group relate to the rehabilitation and restoration
provision attached to the exploration tenements.
Rehabilitation provision $404,310
Total liabilities associated with assets held for sale $404,310
The rehabilitation obligation will transfer
Share your feedback
Discover