AGM - Presentation by CEO
Released
Released
Announcement PDF
Investor Presentation | ASX:AGE | alligatorenergy.com.au
ASX:AGE
Samphire Uranium Project
Advancing Into Trial Production
AGM Presentation
November2025
2
Investor Presentation | ASX:AGE | alligatorenergy.com.au
Disclaimer
Forward Looking Statements
This presentation contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without
limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance of the Company. These risks and uncertainties
could cause actual results and the Company’s plans and objectives to differ materially from those expressed in the forward-looking information. Actual results and future events could differ
materially from anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates and opinions of management on the dates they are
made and expressly qualified in their entirety by this notice. The Company assumes no obligation to update forward-looking information should circumstances or management’s estimates or
opinions change.
Competent Person’s Statement – Uranium and Previously Reported Information
Information in this report is based on current and historic Exploration and Resource Drilling Results compiled by Dr Andrea Marsland-Smith, who is a Member of the AusIMM. Dr Marsland-Smith is
employed by Alligator Energy as Chief Executive Officer (CEO) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity she is undertaking (including 21 years working with ISR uranium development and operations) to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr Marsland-Smith consents to the inclusion in this release of the matters based on her information in the form and
context in which it appears.
Information in this report that relates to the Exploration Target estimate was compiled by Dr Andrea Marsland-Smith, who is a Member of the AusIMM. Dr Marsland-Smith is employed by Alligator
Energy as Chief Executive Officer (CEO) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity she is undertaking
(including 21 years working with ISR uranium development and operations) to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves. Dr Marsland-Smith consents to the inclusion in this release of the matters based on her information in the form and context in which it appears.
In relation to Exploration Results, Mineral Resource Estimates and Exploration Target in the ASX announcements referenced on slides 7, 10 & 14, the Company confirms that it is not aware of
any new information or data that materially affects the information included in the original market announcement and that all material assumptions and technical parameters underpinning the
estimates in the relevant market announcement continue to apply and have not materially changed. In relation to production target referred to on slide 7, the Company confirms that all material
assumptions underpinning the production target, and the forecast financial information derived from the production target, in the initial announcement continue to apply and have not materially
changed.
3
AGM Presentation | ASX:AGE | alligatorenergy.com.au
Corporate Overview
Capital Structure
3
4,430.1 M
Ordinary Shares
A$110.8 M
Market Cap (@ 17/11/25)
460.2 M $25.3 M
A$0.025
Share Price
(@ 17/11/25)
Listed and
Unlisted Options
Cash (@ 30/9/25)
Retail
38.0%
Directors &
Executives
6.0%
Institutions
56.0%
Top 50 Shareholders
4
Investor Presentation | ASX:AGE | alligatorenergy.com.au
Samphire Uranium Project: South Australia
Excellent location with positive stakeholder relations
• Located in South Australia, a premier uranium
jurisdiction globally
• Proven approvals process with 5 mines
approved in the state
• Samphire is just 20 kms from Whyalla, an iron
and steel making centre
• Location brings strong benefits of excellent
regional infrastructure, along with local
engineering and service providers
• Samphire enjoys very positive relations with
Whyalla community, which has a highly skilled
labour force
4
AGM Presentation | ASX:AGE | alligatorenergy.com.au
5
5
Delivering Australia’s Next Uranium Mine and Beyond
Pathway to production and growing the business
CURRENT STATUS
▪ Updated scoping study
highlights strong project
economics
▪ All approvals received to
conduct a Field Recovery Trial
(FRT)
▪ Pilot plant under construction
FIELD RECOVERY TRIAL PRODUCTION
▪ Derisking of the Samphire
project
▪ Construction of FRT plant
complete end CY25
▪ First results from FRT
operations in Q1 CY26
▪ Key inputs for the DFS &
Mining Lease application
▪ Targeting first production in
2030/2031
▪ Enables time to grow the MRE
as well as mining inventory
from:
– Blackbush extensions
– Plumbush MRE
– Testing continuity of the
regional paleochannel
system
STAGE - 1 STAGE - 2 STAGE - 3
AGM Presentation | ASX:AGE | alligatorenergy.com.au
6
6
Stage 1 – Current Status
Strong economics as outlined in the updated scoping study(1) underpin current valuations
A$131m
CAPEX
(including contingency)
AISC
(A$47.58/lb)
US$33.31/lb
IRR*
(post-tax, real,
ungeared)
42%
Payback
2.45 years
Cash Costs
(A$22.94 /lb)
US$16.06/lb
A$257m
NPV8*
(post-tax, real,
ungeared)
† Refer ASX release 14 December 2023 “Scoping Study Update”: Alligator confirms that all material assumptions underpinning the ‘production target’ or the forecast financial information derived from the
‘production target’ continue to apply and have not materially changed *Calculated using 0.70 US/A$ exchange rate
Study metrics* at US$75 / lb long term uranium price
AGM Presentation | ASX:AGE | alligatorenergy.com.au
7
7
CONSTRUCTION ON TIME AND ON BUDGET
✓ Mobilisation of contractors on site
✓ Pilot plant successfully delivered to Samphire
✓ Completion of earthmoving works and bund installation
✓ Mechanical, electrical, and pipework installation works commenced
✓ Drilling of both production and injection wells for two patterns complete
✓ Operations commencing Q1 2026
Stage 2 – Completion of Field Recovery Trial
Significant investment in the design and plan phase to successfully scale up lab scale results
AGM Presentation | ASX:AGE | alligatorenergy.com.au
8
8
INSIGHTS GAINED FROM OTHER DEVELOPERS
• A measured ramp up profile
• Thorough work on permeability and porosity – well spacing
• High level of Resource in the Measured and Indicated
categories – drill spacing critical
• Alignment of resource calculation method with the geometry and
behaviour of ISR amenable mineralisation
• Understanding how far in advance wellfields need to be
delineated to secure sustainable production rates.
Stage 2 – DFS
Proactively derisking Samphire through insights gained from recent ISR developers
Integrating 20 years of ISR technical knowledge
AGM Presentation | ASX:AGE | alligatorenergy.com.au
9
9
Stage 3 – Resource Growth to Increase Mining Inventory
Significant upside to increase mining inventory from multiple areas
Plumbush
Blackbush
• 18 Mlbs(1) to support startup mining operation at Blackbush with staged
expansion.
• Exploration Target of 14 - 75 Mlbs demonstrates significant potential to
increase the existing Resource of 18 Mlbs, by targeting:
• Blackbush strike extensions from the existing MRE
• Plumbush - closer spaced drilling required to convert to potential
MRE
• Paleochannel system shows outstanding continuity with 72% of
the prospective areas untested by modern drilling, and historical
assays encountered in Kanaka sands that host Blackbush
resource.
• Gravity surveys have proven highly effective with findings corroborating
closely with drilling data.
(1) AGE ASX Release 6 May 2025 - Increased Mineral Resource Estimate and Upgrade of Indicated Resource for the Blackbush Deposit, Samphire U Project.
https://wcsecure.weblink.com.au/pdf/AGE/02943740.pdf
(2) AGE ASX Release 7 December 2023 - Significant Exploration Target Range established, Samphire Uranium Project, South Australia
02751150.pdf (weblink.com.au)
AGM Presentation | ASX:AGE | alligatorenergy.com.au
10
10
Upcoming Plans and Targets
Numerous upcoming news flow and milestones in 2025 and 2026
11
AGM Presentation | ASX:AGE | alligatorenergy.com.au
South Australia has proven
process with 5 mines approved
Tier One
Jurisdiction
Simulating commercial production to
derisk the project
Field Recovery
Trial
In situ mining team driving
the project
Additional targets at Samphire and
new discovery at Big Lake
Discovery
Potential
Experienced Team
To Deliver
Investment Highlights
Derisking of project by experienced team that is focussed on delivery and growing the mine life
12
Big Lake Project
AGM Presentation | ASX:AGE | alligatorenergy.com.au
13
13
• Australian Mining Prospect Discovery Of The Year
• Geologically analogous to world-class ISR fields in hydrocarbon
basins - Kazakhstan, Wyoming, Texas.
• Same host sands as Beverley-Four Mile & Honeymoon.
• Province never-before been drilled exploring for uranium.
• Inaugural drilling program intersected significant thicknesses of
anomalous uranium mineralisation(1).
- AC24-021 20m (65ft) @ 110 ppm U from 347ft (106m)
- AC24-022 35m (114ft) @ 117 ppm U from 305ft (93m)
- AC24-023 5m (16ft) @ 47 ppm U from 341ft (104m)
- AC24-025 10m (32ft) @ 138 ppm U from 354ft (108m)
• 2025 - Second drilling program commenced but delayed due to QLD
floodwaters.
• Alligator’s large exploration licence holding secures first mover
advantage.
Refer ASX Announcements: 23 October 2024 – BLU Uranium Discovery, and 27 Feb 2025 – Follow Up drilling at BLU
Big Lake Project
Potential to unlock a new uranium province
(1) AGE ASX Release 13 August 2024
AGM Presentation | ASX:AGE | alligatorenergy.com.au
14
14
Alligator Energy
▪ Tier 1 jurisdiction
▪ Experienced team to deliver projects on time and on budget
▪ Upside potential from multiple exploration opportunities
Key Milestone Catalysts
▪ Multiple news releases over the coming period as key project
milestones are achieved
▪ Results from FRT operations within the next 6 months
▪ Release of a Definitive Feasibility Study
▪ Results from both extensional and infill exploration drilling
The Alligator Energy Value Proposition
Strong value proposition with multiple near-term share price rerating catalysts
Andrea Marsland-Smith
CEO
+61 (0) 7 3839 3904
E: ams@alligatorenergy.com.au
www.alligatorenergy.com.au
Share your feedback
Discover