Corporate Presentation - RIU Explorers Conference - Feb 25
Released
Released
Announcement PDF
ASX:AGE
Advancing Samphire Uranium
Project into Trial Production
RIU Explorers Conference - Greg Hall – CEO – February 2025
Disclaimer
Forward Looking Statements
This presentation contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can
include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance of the Company.
These risks and uncertainties could cause actual results and the Company’s plans and objectives to differ materially from those expressed in the forward-looking information. Actual
results and future events could differ materially from anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates
and opinions of management on the dates they are made and expressly qualified in their entirety by this notice. The Company assumes no obligation to update forward-looking
information should circumstances or management’s estimates or opinions change.
Competent Person’s Statement – Uranium and Previously Reported Information
Information in this report is based on current and historic Exploration and Resource Drilling Results compiled by Dr Andrea Marsland-Smith, who is a Member of the AusIMM. Dr
Marsland-Smith is employed by Alligator Energy as Chief Operating Officer (COO) and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity she is undertaking (including 15 years working with ISR uranium development and operations) to qualify as a Competent Person as defined in
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr Marsland-Smith consents to the inclusion in this release of
the matters based on her information in the form and context in which it appears.
In relation to Exploration results and Mineral Resource estimates referred to in the announcements referred to on slides 7,8,10,11, 18 and 19 the Company confirms that it is not
aware of any new information or data that materially affects the information included in the original market announcement and that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. In relation to production target referred to on slides 7 and 9, the
Company confirms that all material assumptions underpinning the production target, and the forecast financial information derived from the production target, in the initial
announcement continue to apply and have not materially changed.
Competent Person’s Statement – Nickel Cobalt exploration
Information in this report is based on current and historic Exploration Results compiled by Mr Geoffrey Chapman who is a Fellow of the Australasian Institute of Mining and
Metallurgy. Mr Chapman is a Consultant Geologist with Alligator Energy Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves. Mr Chapman consents to the inclusion in this release of the matters based on his information in the form and context in which it
appears.
2
Alligator Corporate Presentation | February 2025 | ASX:AGE
Company Snapshot
Capital Structure (as at 29 Jan 2025)
Share Price
$0.036
Ordinary Shares
3,873.6 M
Perf Shares, Listed & Unlisted Options
462.2 M
Cash as at 31 Dec 2024
$ 20.2 M
Market Cap
$140 M
Top 50 Shareholders
Brokers &
Banks
19%
Retail
45%
Directors
&
Executives
5%
Institutions
31%
3
Alligator Corporate Presentation | February 2025 | ASX:AGE
Uranium and Nuclear Fuel market
• Primary mine supply, mine re-starts, new mines under development
plus new planned mines still potentially not adequate for future supply.
• Re-starts and new mines are experiencing delays mainly due to time to
get technical studies work done, approvals and usual ramp up and
commissioning issues.
• Geopolitics impacting supply – US restrictions on Russian imports, and
now Russia banning EUP sales to the US.
• Reliable nuclear power for AI driven data-centre expansion being
targeted and supported across the globe.
• Many utilities now coming out for long-term U3O8 supply requests from
2028 onwards – term price at US$79 per lb. Spot price below LT price
which is the norm as this is usually a clearing market.
•
European countries moving faster to change previous nuclear phase
out policies and allow new build – multiple MoU’s for SMRs in place
• US policies very supportive of nuclear plant life extensions and new
build.
• All gulf state countries enlarging nuclear growth plans – becoming
future major uranium purchasers.
4
Alligator Corporate Presentation | February 2025 | ASX:AGE
ESG in practice: Operating philosophy
• We aim to add value in all of our decision-making for
shareholders.
Shareholders
• We wish to provide an engaging, challenging, enjoyable and
respectful workplace for our employees.
• We respect the rights of landowners and communities and
Team
Communities
seek to collaborate for our mutual benefit.
Stakeholder
Perspective
• We respect the cultural heritage and connection to country of
Traditional Owners and wish to create mutually beneficial
opportunities.
Focus on
Environment
Landowners
• We aim for a low impact on the environment, through
innovation, use of latest technology, and responsible land
management techniques.
Traditional
Owners
Our aim is to discover, source and economically extract these needed commodities with an innovative approach,
with either zero or minimal impact, and with positive value and experience for our stakeholders and communities.
5
Alligator Corporate Presentation | February 2025 | ASX:AGE
Samphire Uranium project: South Australia – experience in uranium
6
Alligator Corporate Presentation | February 2025 | ASX:AGE
Samphire Highlights
20kms from
Whyalla, SA
JORC compliant
resource
Regional exploration
opportunities
Excellent regional
infrastructure and
skilled labour-force
17.5 Mlbs uranium resource
with significant scope for
further growth
Exploration Target
estimates additional
14 - 75 Mlbs
Note: the potential quantity and grade of the Exploration Target is
conceptual in nature as there has been insufficient exploration to date to
estimate a Mineral Resource and it remains uncertain whether further
exploration will result in the estimation of a Mineral Resource
Robust Scoping Study1.2 Mlb / annum prod.
Pilot plant
planned
A$131m capex, 42% IRR,
and 2.45 yr payback
Fabricated and delivered to
site. Construction in Q4
subject to approvals
Refer ASX release 14 December 2023
“Scoping Study Update”
7
Alligator Corporate Presentation | February 2025 | ASX:AGE
ESG
Strong ESG credentials,
with environmental
commendation awarded by
SA government
Samphire Uranium project: A highly competitive In-Situ Recovery project
• Initial low capital cost estimate of A$131 million,
despite significant contingencies and inflation totalling
35%.
• AISC at the lower end of cost curve, due to:
➢ In-situ Recovery (ISR) amenable,
➢ nature of the deposit, shallow depth, excellent
formation porosity, and
➢ high leaching dynamics.
• Location near Whyalla affords lower cost of key
infrastructure, locally based workforce (i.e. no FIFO or
camp), experienced mining services and business support.
• Expansion potential - Exploration Target Range (Dec 23)
estimating an additional 14 - 75 Mlbs on top of 17.5Mlbs
resource. Multi-year resource extension and step-out
drilling to increase mine life and production rate.
• Field Recovery Trial on receipt of final operating plan
regulatory approval to de-risk project and confirm
parameters to be used in feasibility study during 2H 2025
8
Alligator Corporate Presentation | February 2025 | ASX:AGE
Conceptual Model of ISR
Samphire Uranium Project – Dec 2023 Scoping Study† : 1.2 Mlbs pa project
Study metrics* at US$75 / lb uranium price
A$131m
2.45 years
42%
A$257m
US$33.31/lb
US$16.06/lb
CAPEX
Payback
IRR*
NPV8*
AISC
Cash Costs
(post-tax, real,
ungeared)
(post-tax, real,
ungeared)
(A$47.58/lb)
(A$22.94 /lb)
(including contingency)
Study metrics* based on analysts current long-term price projections of US$90 / lb
A$131m
1.93 years
55%
A$371m
US$34.06/lb
US$16.06/lb
CAPEX
Payback
IRR*
NPV8*
AISC
Cash Costs
(post-tax, real,
ungeared)
(post-tax, real,
ungeared)
(A$48.96/lb)
(A$22.94/lb)
(including contingency)
† Ref ASX release 14 December 2023 “Scoping Study Update”: Alligator confirms that all material assumptions underpinning the ‘production target’ or the forecast financial information derived from the
‘production target’ continue to apply and have not materially changed other than the outlook for the long-term uranium price as set out above; *Calculated using 0.70 US/A$ exchange rate inclusion of significant
contingencies and inflation of 35%.
9
Alligator Corporate Presentation | February 2025 | ASX:AGE
Samphire Uranium Project – Blackbush 2024 Drilling and resource update
Significant uranium mineralisation intersections from Blackbush West uranium
roll fronts has delivered further targets outside of the Inferred mineral resource.
Announced in ASX release dated 21 Nov 2024:
•
•
•
•
•
•
•
•
•
BBRM24-304: 1.3 meters at 1.94% (19,391ppm) pU3O8 from 62.6m (GT 25,208)
BBRM24-278: 1.1 meters at 0.44% (4,392ppm) pU3O8 from 62.94m (GT 4,832)
BBRM24-338: 2.4 meters at 0.20% (1,948ppm) pU3O8 from 56.7m (GT 4,675)
BBRM24-321: 1.1 meters at 0.36% (3,633ppm) pU3O8 from 58.59m (GT 3,996)
BBRM24-282: 1.7 meters at 0.23% (2,314ppm) pU3O8 from 63.1m (GT 3,934)
BBRM24-283: 0.8 meters at 0.45% (4,506ppm) pU3O8 from 65.03m (GT 3,604)
BBRM24-318: 0.7 meters at 0.36% (3,566ppm) pU3O8 from 59.1m (GT 2,497)
BBRM24-330: 0.8 meters at 0.18% (1,791ppm) pU3O8 from 63.1m (GT 1,433)
BBRM24-314: 0.6 meters at 0.17% (1,734ppm) pU3O8 from 59.14m (GT 1,040)
An update of the JORC Resource Estimate inclusive of all 2024 drill results to be
completed in Q1, 2025, targeting both resource expansion and category
conversion from inferred to indicated
Note: pU3O8 denotes that the grade has been determined by Prompt Fission Neutron
downhole logging
GT= grade(ppm) x thickness(m) – divide by 10,000 for m% GT
ASX release 1 May 2024 – Extension of Uranium Mineralisation at Samphire, and ASX
release 21 Nov 2024 – Significant Drilling Results – Samphire Uranium Project Update
10 Alligator Corporate Presentation | February 2025 | ASX:AGE
Further Extensions outside the Exploration Target Range Envelope
Ground Gravity Survey- April 2024
•
Exploration target range – additional 14 to 75 Mlbs
•
Ground gravity data shows outstanding continuity of the
Samphire palaeochannel system by 34 lineal km’s.
•
50% increase to the existing palaeochannel strike length to
~over 90kms.
•
Historical drillholes confirm that extensions contain the same
thick sequences of Kanaka Bed sands which host the
Blackbush Mineral Resource .
•
Multiple historical drillhole intersections (above 250ppm
eU3O8 cutoff) confirm that uranium is ubiquitous throughout
this system.
•
72% (over 70km) of the prospective areas of the entire
Samphire palaeochannel system remain completely untested
by drilling.
•
Significant potential for new discoveries and resource growth
in the Project area.
Refer ASX Announcements 7 December 2023 and 2 May 2024
11 Alligator Corporate Presentation | February 2025 | ASX:AGE
Samphire Uranium Project – Field Recovery Trial (FRT)
• Field Recovery Trial (FRT) construction targeted for and Q2
2025, pending PEPR (operating plan) regulatory approval. Plant
fully fabricated and delivered to AGE’s Whyalla yard.
• FRT operation for 3-4 months and consists of three producing
well patterns and a containerised pilot plant.
• FRT is designed to confirm key operating parameters and marks
an important step toward development.
• Parameters to be assessed include in-situ chemistry,
hydrogeology, uranium recovery, reagent usage, and other
environmental and economic factors.
• Data and learnings further de-risk the Project and provides the
necessary inputs to a full feasibility study and Mining Lease
Application during 2025.
• EoI’s to select engineering firms for feasibility study
Wellhouse (Pipe room) Module
12 Alligator Corporate Presentation | February 2025 | ASX:AGE
Samphire Uranium Project – Field Recovery Trial Plant
• Fabrication of the containerised FRT processing
Pilot plant layout
plant completed - delivered to AGE’s Whyalla
yard in July 2024.
• Expressions of Interest to five Whyalla based
companies for onsite civils and pilot plant
construction evaluated. Preferred company to
be announced in coming weeks.
• Plant control system being set up and tested.
Commissioning and operating plans under
development for initiation.
• Post-FRT and subject to any further testing, well
infrastructure and plant to be removed, and area
rehabilitated – pilot plant available for future
satellite field testing.
• Samples of final clean eluate solution containing
extracted uranium oxide to be further processed
into U3O8 concentrate offsite for Converter
quality samples.
13 Alligator Corporate Presentation | February 2025 | ASX:AGE
Ion Exchange Module
Wellhouse Module (pipe room)
Delivered to site
2025 Plans and Targets
• Jan – Retention Lease approval with assigned conditions for Field Recovery Trial (FRT)
• Feb – Submission of Program for Environment Performance and Rehabilitation (PEPR) – FRT operating plan
• Feb – Start of second exploration program on Big Lake Uranium discovery
• Feb – Alligator Rivers data review and workshop on next steps and targets
• Mar – Updated uranium resource for Blackbush Deposit, Samphire project
• May / Jun – Anticipated approval of PEPR – Commencement of trial production well drilling for FRT
• Jun / Jul – On-site construction of Samphire FRT pilot plant – civils, plant, infrastructure
• 1H – Expression of Interest to engineering groups for Samphire Feasibility to commence Q3
• Jul to Oct – Operation of Field Recovery Trial – incl RO plant operation
• Q3 – Initial regulatory discussion around Scoping for future full mine approvals
• 2H – Commence Plumbush satellite deposit resource drilling (subject to successful pastoral access
agreement and cultural heritage survey)
• Q3 – potential next BLU drilling program subject to results
14 Alligator Corporate Presentation | February 2025 | ASX:AGE
2025 Plans and Targets
15 Alligator Corporate Presentation | February 2025 | ASX:AGE
Exploration projects
NT, AUSTRALIA
ITALY
Piedmont NW
Alligator Rivers
(ARUP)
High Grade U
Ni-Co-Cu-Au-PGEs
SA, AUSTRALIA
Big Lake
(Cooper Basin)
ISR style U
SA, AUSTRALIA
Investment in
EnviroCopper Ltd
Copper ISR
16 Alligator Corporate Presentation | February 2025 | ASX:AGE
Big Lake Uranium Project, SA
•
Overlies Cooper Basin in NW SA – under-explored for
uranium despite geological analogies to world-class ISR
fields in hydrocarbon basins - Kazakhstan, Wyoming, Texas.
•
Several potential uranium sources including; weathering /
leaching of underlying ‘hot’ granite suite or distal migration of
uranium bearing fluids toward basin depo-centres.
•
EM results and analysis of publicly available 2D seismic data
indicated potential presence of paleochannel systems.
2024 Big Lake Drilling Program:
•
Interpretation of seismic and other datasets towards a full 3D
basin model across the entire basin.
•
Selection of ~20 drill sites to test stratigraphy, paleochannel
model and qualities of U-trap rocks
•
•
•
Traditional Owner clearances for drill lines.
Engagement with other key stakeholders
Remote logistics considerations, including access to fuel,
water, accommodation and emergency support
Alligator Corporate Presentation | February 2025 | ASX:AGE
Big Lake Uranium - Inaugural Drilling Program Discovery Success
• Inaugural drilling program intersected significant thicknesses of
anomalous uranium mineralisation within interbedded
palaeochannel sand units in the Namba Formation.
• Discovery is first proof of concept that significant uranium is present
within Lake Eyre basin sediments above the hydrocarbon-rich
Cooper Basin within potentially ISR amenable host and depths.
• Laboratory chemical assay results validate the in-field XRF
measurements for contained uranium. These include:
• AC24-021
• AC24-022
• AC24-023
• AC24-025
20m @ 110 ppm U from 106 m
35 m @ 117 ppm U from 93 m
5 m @ 47 ppm U from 104 m
10 m @ 138 ppm U from 108 m
• The indicative grade-thickness of two intersections is at or near the
economic cut off used at the Company’s Samphire ISR uranium
project near Whyalla, SA.
• Cultural heritage clearance complete for expanded drilling program
in early 2025 – to include rotary mud drilling allowing detailed downhole logging.
Alligator Corporate Presentation | February 2025 | ASX:AGE
Refer ASX releases 13 August 2024 and 23 October 2024
Alligator Rivers Uranium Province, NT
• Three projects: Nabarlek North, Tin Camp Creek and
Beatrice, in Australia’s premier high-grade uranium
province.
• Province is host to existing high-grade deposits including
Jabiluka (358Mlb @ 5,300ppm U3O8).
• Multiple uranium targets in well-defined regional uranium
bearing zone including the Caramal Resource 6.5 Mlbs
U3O8 @3,100ppm.
• Nabarlek North is the current focus of exploration
program – including northerly extensions to the U40
Prospect*, based on 2023 results (AGE and 3rd party).
• A small field program will be carried out on the Tin Camp
Creek project in 2024 to revisit preferred targets for
future work.
* Includes 6.3m at 7.23% U3O8 and 8.3m @ 2.12% Cu (Uranium Equities Ltd now DevEx
Resources Ltd release – 4 October 2017).
Alligator Corporate Presentation | February 2025 | ASX:AGE
Alligator Rivers Uranium Province, NT
2024 Work Program at Nabarlek North:
• New high resolution airborne magnetic / radiometric
Focus drilling areas, 2024
survey to better define key structures and host
stratigraphy across the entire tenure (completed July
2024)
• Reconnaissance mapping of outcrop throughout northern
half to ‘truth’ regional stratigraphic knowledge and tie
geophysical data.
• An RC drilling program of ~ 3,500m focussed on 8 target
areas across the tenement (completed Sept 2024).
• Includes further work at U40 North – to follow up last
year’s intercept and ‘chase’ system to the north.
• Awaiting assays on samples collected
• Drilling / geophysics programs co-funded with NT Govt as
part of their 2024 ‘Resourcing the Territory’ Program
Alligator Corporate Presentation | February 2025 | ASX:AGE
U40 Prospect
Investment into EnviroCopper Ltd ISR copper, SA
• Alligator expanded energy minerals interests with $0.9M strategic
investment in private group, EnviroCopper (ECL).
• This investment and resultant collaboration is extremely
complimentary to our existing and substantial in-house ISR expertise.
• Provides exposure to ISR copper project portfolio (over 200kt Cu
resource) and experienced ISR and research team.
• Advancing ISR trials at Kapunda copper project - similar plans for
Alford West copper project. BHP funding field trials at Kapunda for IP
access.
• ISR successfully used to extract copper in projects in Australia and the
US - offers distinct advantages and environmental benefits.
• ECL has now undertaken successful push-pull lixiviant trial at
Kapunda to extract copper – awaiting approval for SELT trial within
ring of holes circulating lixiviant for copper extraction.
• Significant in-house Cu ISR modelling expertise for shallow fractured
rock aquifer hosted oxide copper deposits.
21 Alligator Corporate Presentation | February 2025 |
ASX:AGE
Samphire Uranium Project - Community Engagement
Active Membership and Sponsorship
Member of TACTIC
Platinum sponsor of the Whyalla Business and Tourism
Gold sponsor of South Whyalla Demons Football Club
Community Activities snapshot
•Appointment of a Stakeholder Engagement Manager.
•Partnered with Landscape South Australia and Simec to tackle invasive species like the
Hudson Pear.
•Participated in the Community Picnic in Whyalla – Engaged in over 40 conversations with local
community members.
•Presented and briefed local emergency services (SAPOL, SAAS, MFS, SA Health, and
others).
•Held community engagement session at Mount Laura Homestead over 2 days
•Currently have project material on display in the Whyalla Public Library.
•We have recently introduced a free 1800 number, which is staffed 24/7 for community
inquiries.
Additionally, while the FRT remains operational, we are planning a series of pop-up information
sessions and other activities to further engage with the Whyalla and surrounding community.
22 Alligator Corporate Presentation | February 2025 | ASX:AGE
Samphire Uranium Project: Opportunity for a near carbon-free energy project
• Lower power consumption as ISR method has no rock /
material movement, nor crushing / grinding of rock.
Renewable power with backup may be adequate?
• Distance to Whyalla may allow all electric vehicles, light
trucks, cranes etc to be used?
• Advances in battery on-highway prime movers may support
the level of logistics and product transport needed?
• This potential opportunity aligns with SA Government
Hydrogen Hub for Whyalla region and extensive potential
renewable projects.
• We will be scoping this opportunity in parallel with our
feasibility and economic studies.
23 Alligator Corporate Presentation | February 2025 |
ASX:AGE
ASX:AGE
Greg Hall CEO
+61 (0) 7 3839 3904
gh@alligatorenergy.com.au
www.alligatorenergy.com.au
Share your feedback
Discover