Alligator Energy (ASX: AGE, ‘Alligator’ or ‘the Company’) is pleased to advise that additional
resource drilling flagged in our 8 June 2023 ASX release has been completed at the Blackbush
deposit (Blackbush), Samphire Uranium Project south of Whyalla, South Australia.
Highlights:
• Exceptional high grade uranium results obtained within Blackbush JORC Mineral
Resource envelope supports confidence of further conversion of Mineral
Resource Estimate from Inferred to Indicated status.
• Resource drilling is now complete for 2023. A total of 118 holes (for 10,149 m) were
drilled in the calendar year with 82 holes (7,033 m) drilled in Blackbush West since
the previous announcement on drill results1. AMC Consultants are currently
updating the Mineral Resource Estimate (MRE) due in November.
Some of the significant uranium mineralisation intersections over 2,000GT2 (Figure 1) include:
-
BBRM23-121 - 4.82m @ 0.591% (5,910ppm) pU3O83 from 63.82 m (GT 28,486)
BBRM23-121 - 3.22m @ 0.628% (6,280ppm) pU3O8 from 69.06 m (GT 20,222)
BBRM23-122 - 4.36m @ 0.267% (2,670ppm) pU3O8 from 70.24 m (GT 11,641)
BBRM23-123 - 2.90m @ 0.121% (1,210ppm) pU3O8 from 69.42 m (GT 11,641)
BBRM23-142 - 2.18m @ 0.394% (3,940ppm) pU3O8 from 61.52 m (GT 8,589)
BBRM23-163 - 2.48m @ 0.893% (8,930ppm) pU3O8 from 75.30 m (GT 22,146)
BBRM23-161 - 2.30m @ 0.717% (7,170ppm) pU3O8 from 76.96 m (GT 16,491)
BBRM23-171 - 3.06m @ 0.440% (4,400ppm) pU3O8 from 69.46 m (GT 13,464)
BBRM23-198 - 4.40m @ 0.174% (1,740ppm) pU3O8 from 62.20 m (GT 7,656)
BBRM23-199 - 1.36m @ 0.444% (4,440ppm) pU3O8 from 59.94 m (GT 6,038)
• Several holes drilled on the limit of the Inferred Mineral Resource confirms
uranium mineralisation extends beyond the known MRE outline which will be the
focus for year-round drilling commencing late January 2024.
- A Heritage Survey with representatives from the Barngarla Determination Aboriginal
Corporation (BDAC) was conducted in late August to enable drilling of these
extensions in addition to drilling new areas outside of the Blackbush mineralisation
envelope.
1
2
3
ASX Announcement 8 June 2023; Drilling Results update, Samphire Uranium Project, 05qgptcf2sxpsh.pdf (asx.com.au)
GT= grade(ppm) x thickness(m) – divide by 10,000 for m% GT
1Note: pU3O8 denotes that the grade has been determined by PFN downhole logging.
ASX: AGE
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | +61 (0) 7 3839 3904
info@alligatorenergy.com.au | www.alligatorenergy.com.au | Page 1 of 15
- We are confident this will lead to further resource expansion as we head into our
Field Recovery Trial and Feasibility Study in 2024
• Installation of an array of hydrogeological investigation wells has commenced to
and enable further evaluation of groundwater chemistry baselines for Blackbush.
• Adelaide-based Wallbridge Gilbert Aztec (WGA) consultants have been engaged
to update the Scoping Study4 for Samphire targeting an increased production rate,
with completion in November once the MRE is finalised and integrated into the
financial and production models.
• 13 submissions were received from the public consultation on Alligator’s
Retention Lease (RL) application to conduct a field recovery trial at Samphire
(Blackbush Deposit). In total 85% of submissions were received from community
members with the remainder from NGO’s. AGE is now considering and will
respond to public submissions as part of the next steps toward granting of the RL.
• Off-site fabrication of the Field Recovery Trial pilot plant by Adelaide Control
Engineering (ACE) is well advanced targeting December 2023 completion.
• Work has commenced on preparing an Exploration Target Range for the Samphire
Project covering both the wider Blackbush Deposit and Plumbush Deposit,
targeting completion in November.
Alligator’s CEO Greg Hall stated: “Our Samphire team have achieved excellent drilling results
despite some significant rain delays early in the year reducing our metres drilled. The consistency of
grades within the Blackbush deposit bodes well for our Field Recovery Trial (FRT) which is planned
to commence in Q1 2024 (subject to regulatory approvals). With work underway on the Resource
update, we are now updating our Scoping Study based on an increased production schedule, subject
to confirmation of the new Indicated resource level.
I wish also to mention the continuing exceptional work by our Project and Environmental Team, and
Watsons drilling contractors on minimising impacts on ground while we drill. The techniques and
procedures developed and adopted, including rolling the bush, maintaining the important root stock,
single track with truck access spotting, limiting track widths and cornering, mean a much faster
rehabilitation with an increased bush density. We have planted and are watering over 400 native
trees, fencing off areas to speed up rehabilitation, and have identified key areas for future significant
habitat and offsets for areas cleared.
Our successful capital raise (placement and SPP) means we are now in an excellent position to
advance Samphire through to approvals and development ready stage. We are continuing to recruit
the key expertise to enable this, with an additional hydrogeologist recently engaged, and further
expertise being sought in study manager roles. Our personnel are engaging with pastoralists,
community, the Barngarla group, and wider regional and State stakeholders to ensure transparency
and openness regarding the Project impacts and opportunities. We are now utilising the services of
over 30 companies within Whyalla and regions and have had significant early discussion with potential
uranium offtake customers internationally.”
4
ASX Announcement 13 March 2023; Scoping Study – Samphire Uranium Project, 45mmn6z3xk5r5p.pdf (asx.com.au)
2
Samphire 2023 Drilling Program Completed
Resource drilling has been completed at the Blackbush Deposit with continued focus on
increasing the confidence of the Mineral Resource Estimate (MRE) through conversion of the
Inferred category to Indicated status (refer Figure 1).
Drilling was carried out primarily in the Blackbush West area, with much of the drilling
concentrating on the northern area which historically had very little Prompt Fission Neutron (PFN)
acquired grade data (pU3O8) which is required for conversion of the mineral resource to Indicated
status. Several significant uranium intercepts were encountered in the northern (BBRM23-126,
BBRM23-128, BBRM23-133, BBRM23-136, BBRM23-142 & BBRM23-144) and southern
(BBRM23-121, BBRM23-122, BBRM23-123, BBRM23-124, BBRM23-154, BBRM23-161,
BBRM23-163, BBRM23-171, BBRM23-175 & BBRM23-184) areas of Blackbush West showing
that high-grade mineralisation extends beyond the area of the current Indicated Resource (Figure
1). Mineralisation also remains open to the west which will be drilled at the recommencement of
drilling in January 2024. AMC Consultants have been provided the additional drill data targeting
an update to the MRE mid-November 2023.
All significant uranium intersections from PFN logging (pU3O8) of the rotary mud drilling program
above 0.5m minimum thickness, >0.025% pU3O8 are listed in Appendix 1, Table 1.
Figure 1: Current Inferred resource area outline (blue) and Indicated Resource area outline (red) showing AGE
2023 drilling focussed within the Inferred Resource envelope.
3
A Heritage Survey was conducted over a wider area at Samphire (Figure 2) on 29 August 2023
with representatives from the Barngarla Determination Aboriginal Corporation (BDAC). This survey
now allows for further ground gravity to be acquired next year to map the paleochannel system in
these areas and drilling targeting potential additional roll-front uranium mineralisation within the
palaeochannel system outside of the Blackbush mineralisation envelope.
Figure 2: Outline of Heritage Surveys undertaken by AGE - 2021/2022 and August 2023.
Field Recovery Trial
Fabrication of the containerised pilot plant for the FRT continues, with ACE undertaking the
design and fabrication, with input from Alligator’s Process Chemist. The pilot plant is targeted for
completion in December 2023. Current status includes:
The wellhouse is 95% complete awaiting electrical fit out (Photos 1).
Ion exchange (IX) containerised module will commence construction at the end of October
post arrival of the 3 IX columns (Photo 2).
All parts and equipment for the reverse osmosis unit have been received and containerised
assembly is in progress.
4
-
Orders for the submersible downhole pumps for the extractor wells have been placed.
Project management group, ammjohn, are assisting with project controls and site civil design.
Photo 1: Progress of well house fabrication inside transportable container for Field Recovery Trial pilot plant off-site fabrication.
Photo 2: 3D Model of containerised IX module
5
This announcement was authorised for release by the CEO and Managing Director.
Contacts
For more information, please contact:
Mr Greg Hall
Mr Mike Meintjes
CEO & Managing Director
Company Secretary
gh@alligatorenergy.com.au
mm@alligatorenergy.com.au
For media enquiries, please contact:
Alex Cowie
Media & Investor Relations
alexc@nwrcommunications.com.au
Forward Looking Statement
This announcement contains projections and forward-looking information that involve various risks and uncertainties
regarding future events. Such forward-looking information can include without limitation statements based on current
expectations involving a number of risks and uncertainties and are not guarantees of future performance of the Company.
These risks and uncertainties could cause actual results and the Company’s plans and objectives to differ materially from
those expressed in the forward-looking information. Actual results and future events could differ materially from anticipated
in such information. These and all subsequent written and oral forward-looking information are based on estimates and
opinions of management on the dates they are made and expressly qualified in their entirety by this notice. The Company
assumes no obligation to update forward-looking information should circumstances or management’s estimates or opinions
change.
Competent Person’s Statement
Information in this report is based on current and historic Exploration and Resource Drilling Results compiled by Dr Andrea
Marsland-Smith who is a Member of the AusIMM. Dr Marsland-Smith is employed on a full-time basis with Alligator Energy
as Chief Operating Officer, and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration (including 21 years in ISR uranium mining operations and technical work) and to the activity she is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves. Dr Marsland-Smith consents to the inclusion in this release of
the matters based on her information in the form and context in which it appears.
6
About Alligator Energy
Alligator Energy Ltd is an Australian, ASX-listed, exploration company focused on uranium and energy related minerals,
principally cobalt-nickel. Alligator’s Directors have significant experience in the exploration, development and operations
of both uranium and nickel projects (both laterites and sulphides).
Projects
7
APPENDIX 1 - In accordance with ASX Listing Rule 5.7.2 the Company provides the following information.
Table 1: All significant uranium intersections from PFN logging (pU 3O8) of the rotary mud drilling program above 0.5m
minimum thickness, >0.025% pU3O8 (250ppm pU3O8) with internal dilution 0.25m.
Note: pU3O8 grades have been acquired by a Prompt Fission Neutron Tool (PFN22) which was calibrated at the
Australian Mineral Development Laboratories (AMDEL) calibration facility (Adelaide) and then checked for repeatability
by regularly logging a fibreglass-cased calibration hole onsite (MRC002,723703E, 6324350N (GDA94), depth 84.5m).
All pU3O8 grades were calculated and corrected for borehole size from caliper data taken every 5cm downhole and using
the equation {2.737*({EPITHERM}/{THERMAL}-0.02)}*{-1*Power(10,-06 )*Power({CAL},2)+0.0097*{CAL}-0.0313}
Summarised above 0.5m minimum thickness, > 0.025% pU3O8 (250ppm pU3O8) with internal dilution 0.25m.
Holeid
Easting
(GDA94,
Z53)
Northing
(GDA94,
Z53)
RL
Azimuth
Dip
Hole
Depth
(m)
Depth
From
(m)
Depth
To
(m)
Thickness
(m)
pU3O8 (%)
pU3O8 (ppm)
Grade x
Thickness
(mppm)
Grade x
Thickness
m%
BBRM23-120
722929
6323874
21.1
000
-90
89.0
71.52
73.74
2.24
0.023
230
515
0.052
BBRM23-120
722929
6323874
21.1
000
-90
89.0
74.48
75.72
1.26
0.023
230
290
0.030
BBRM23-121
722873
6323874
22.1
000
-90
75.0
63.82
68.62
4.82
0.591
5910
28486
2.850
BBRM23-121
722873
6323874
22.1
000
-90
75.0
69.06
72.26
3.22
0.628
6280
20222
2.021
BBRM23-122
722841
6323820
21.5
000
-90
83.0
70.24
74.58
4.36
0.267
2670
11641
1.163
BBRM23-122
722841
6323820
21.5
000
-90
83.0
75
75.6
0.62
0.049
490
304
0.031
BBRM23-123
722807
6323821
21.5
000
-90
85.0
69.42
72.3
2.9
0.121
1210
3509
0.351
BBRM23-124
722838
6323772
20.6
000
-90
84.0
71.62
73.76
2.16
0.203
2030
4385
0.438
BBRM23-126
722892
6324596
21.4
000
-90
90.0
71.08
72.68
1.62
0.16
1600
2592
0.259
BBRM23-128
722862
6324601
21.4
000
-90
90.0
60.96
62.36
1.42
0.035
350
497
0.049
BBRM23-128
722862
6324601
21.4
000
-90
90.0
63.78
65.5
1.74
0.145
1450
2523
0.252
BBRM23-128
722862
6324601
21.4
000
-90
90.0
71.9
72.86
0.98
0.452
4520
4430
0.443
BBRM23-129
722804
6324602
22.1
000
-90
78.0
67.24
68.08
0.86
0.068
680
585
0.058
BBRM23-131
722858
6324657
22.4
000
-90
87.0
61.48
62.02
0.56
0.103
1030
577
0.058
BBRM23-132
722961
6324655
21.3
000
-90
92.0
82.74
84.3
1.58
0.084
840
1327
0.133
BBRM23-133
722906
6324694
22.2
000
-90
90.0
74.12
75.98
1.88
0.196
1960
3685
0.368
BBRM23-136
722875
6324749
22.8
000
-90
91.0
64.46
65.1
0.66
0.111
1110
733
0.073
BBRM23-136
722875
6324749
22.8
000
-90
91.0
65.54
66.44
0.92
0.276
2760
2539
0.254
BBRM23-136
722875
6324749
22.8
000
-90
91.0
74.16
76.7
2.56
0.059
590
1510
0.151
BBRM23-138
722800
6324700
23.3
000
-90
78.0
62.62
63.17
0.56
0.068
680
381
0.038
BBRM23-138
722800
6324700
23.3
000
-90
78.0
63.8
64.29
0.5
0.017
170
85
0.009
BBRM23-138
722800
6324700
23.3
000
-90
78.0
64.68
66.52
1.85
0.057
570
1055
0.105
BBRM23-138
722800
6324700
23.3
000
-90
78.0
67.21
68.14
0.94
0.111
1110
1043
0.104
BBRM23-138
722800
6324700
23.3
000
-90
78.0
71.5
72.46
0.97
0.127
1270
1232
0.123
BBRM23-139
722824
6324749
23.4
000
-90
81.0
74.4
75.22
0.84
0.06
600
504
0.051
BBRM23-141
722775
6324749
23.5
000
-90
76.0
69.28
70.04
0.78
0.054
540
421
0.042
BBRM23-142
722842
6324804
23.2
000
-90
105.0
61.52
63.68
2.18
0.394
3940
8589
0.859
BBRM23-142
722842
6324804
23.2
000
-90
105.0
67.1
70.34
3.26
0.091
910
2967
0.297
BBRM23-144
722803
6324805
23.6
000
-90
78.0
60.02
60.86
0.86
0.21
2100
1806
0.181
BBRM23-144
722803
6324805
23.6
000
-90
78.0
66.82
67.72
0.92
0.306
3060
2815
0.281
BBRM23-144
722803
6324805
23.6
000
-90
78.0
69.84
70.18
0.36
0.018
180
65
0.007
BBRM23-145
722752
6324805
24.1
000
-90
76.0
70.3
71.32
1.04
0.035
350
364
0.037
BBRM23-147
722829
6324853
23.5
000
-90
84.0
68.36
69.68
1.34
0.066
660
884
0.089
BBRM23-148
722803
6324899
23.8
000
-90
79.0
70.68
71.54
0.88
0.039
390
343
0.034
BBRM23-149
722707
6324899
24.4
000
-90
80.0
61.8
62.64
0.86
0.149
1490
1281
0.128
BBRM23-149
722707
6324899
24.4
000
-90
80.0
73.74
74.9
1.18
0.069
690
814
0.082
BBRM23-149
722707
6324899
24.4
000
-90
80.0
75.58
76.1
0.54
0.037
370
200
0.020
BBRM23-150
722858
6324827
22.8
000
-90
84.0
67.8
70.2
2.42
0.034
340
823
0.082
BBRM23-150
722858
6324827
22.8
000
-90
84.0
71.66
73.2
1.56
0.094
940
1466
0.147
BBRM23-152
722755
6324904
24.4
000
-90
82.0
62.48
63.32
0.86
0.047
470
404
0.040
BBRM23-152
722755
6324904
24.4
000
-90
82.0
67.14
67.84
0.72
0.108
1080
778
0.078
BBRM23-153
722777
6324839
24.1
000
-90
78.0
61.78
62.68
0.92
0.041
410
377
0.038
BBRM23-153
722777
6324839
24.1
000
-90
78.0
66.18
67.22
1.06
0.171
1710
1813
0.181
BBRM23-154
722652
6324000
22.4
000
-90
85.0
55.92
56.84
0.94
0.614
6140
5772
0.577
BBRM23-154
722652
6324000
22.4
000
-90
85.0
57.84
58.8
0.98
0.04
400
392
0.039
BBRM23-156
722652
6323898
21.7
000
-90
84.0
57.92
58.86
0.96
0.117
1170
1123
0.112
BBRM23-156
722652
6323898
21.7
000
-90
84.0
59.38
60.38
1.02
0.077
770
785
0.079
BBRM23-156
722652
6323898
21.7
000
-90
84.0
75.1
75.7
0.62
0.028
280
174
0.017
BBRM23-156
722652
6323898
21.7
000
-90
84.0
76.6
78.1
1.52
0.086
860
1307
0.130
BBRM23-161
722734
6323767
22.1
000
-90
91.0
76.96
79.24
2.3
0.717
7170
16491
1.649
BBRM23-162
722702
6323802
22.0
000
-90
85.0
48.66
49.47
0.82
0.03
300
246
0.024
BBRM23-162
722702
6323802
22.0
000
-90
85.0
51.36
52.47
1.12
0.04
400
448
0.045
BBRM23-162
722702
6323802
22.0
000
-90
85.0
53.74
55.39
1.66
0.032
320
531
0.053
BBRM23-163
722676
6323767
22.7
000
-90
92.0
62.52
63.22
0.72
0.13
1300
936
0.094
BBRM23-163
722676
6323767
22.7
000
-90
92.0
75.3
77.76
2.48
0.893
8930
22146
2.213
BBRM23-170
723129
6324001
20.3
000
-90
94.0
52.8
53.42
0.64
0.019
190
122
0.012
BBRM23-171
723002
6323953
20.2
000
-90
85.0
63.58
64.5
0.94
0.037
370
348
0.035
BBRM23-171
723002
6323953
20.2
000
-90
85.0
67.28
68.12
0.86
0.031
310
267
0.027
BBRM23-171
723002
6323953
20.2
000
-90
85.0
69.46
72.5
3.06
0.44
4400
13464
1.346
BBRM23-171
723002
6323953
20.2
000
-90
85.0
73.34
74.26
0.94
0.03
300
282
0.028
BBRM23-173
722953
6324001
19.7
000
-90
74.0
51.96
52.44
0.5
0.022
220
110
0.011
BBRM23-175
722622
6323853
22.5
000
-90
82.0
57.28
58.24
0.98
0.052
520
510
0.051
BBRM23-175
722622
6323853
22.5
000
-90
82.0
60
60.5
0.52
0.07
700
364
0.037
BBRM23-175
722622
6323853
22.5
000
-90
82.0
68.26
69.08
0.84
0.281
2810
2360
0.236
BBRM23-175
722622
6323853
22.5
000
-90
82.0
70.76
71.64
0.9
0.237
2370
2133
0.213
BBRM23-175
722622
6323853
22.5
000
-90
82.0
72.3
72.82
0.54
0.022
220
119
0.012
BBRM23-183
722885
6323768
20.7
000
-90
87.0
73.14
73.88
0.76
0.147
1470
1117
0.112
BBRM23-183
722885
6323768
20.7
000
-90
87.0
74.32
75.04
0.74
0.062
620
459
0.046
BBRM23-184
723054
6323960
20.4
000
-90
90.0
75
77.4
2.42
0.061
610
1476
0.147
BBRM23-188
722977
6323976
19.9
000
-90
81.0
52.58
53.44
0.88
0.043
430
378
0.038
BBRM23-191
723003
6324025
19.6
000
-90
92.0
53.98
54.46
0.5
0.155
1550
775
0.077
BBRM23-192
723053
6323974
20.1
000
-90
95.0
67.98
69.26
1.3
0.127
1270
1651
0.165
BBRM23-192
723053
6323974
20.1
000
-90
95.0
70.78
71.86
1.1
0.055
550
605
0.061
BBRM23-192
723053
6323974
20.1
000
-90
95.0
73.92
75.08
1.18
0.081
810
956
0.096
BBRM23-198
722453
6324214
24.5
000
-90
90.0
59.24
60.14
0.92
0.024
240
221
0.022
BBRM23-198
722453
6324214
24.5
000
-90
90.0
62.2
66.58
4.4
0.174
1740
7656
0.767
BBRM23-199
722399
6324223
24.4
000
-90
95.0
59.94
61.28
1.36
0.444
4440
6038
0.604
9
BBRM23-200
722454
6324186
24.8
000
-90
87.0
59.56
60.38
0.84
0.035
350
294
0.030
BBRM23-200
722454
6324186
24.8
000
-90
87.0
63.54
64.16
0.64
0.061
610
390
0.039
10
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• Rotary mud drilling was used to obtain 2m
samples in the non-target area and 1m mud
/chip samples within the target area.
• Downhole wireline logging using a Prompt
Fission Neutron (PFN) tool was used to
calculate pU3O8 from the ratio of epithermal
and thermal neutrons.
• The PFN used in this program was
calibrated using industry standard
procedures at the Australian Mineral
Development Laboratories (AMDEL)
calibration facility (Adelaide).
• In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailed information.
Drilling
techniques
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc).
• All holes were drilled by Watson Drilling
with typical hole diameter being 6”
(152.4mm).
• All holes were vertical.
Drill sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
• Caliper data show that borehole size
increases in zones of unconsolidated sands,
hence all pU3O8 grades were calculated and
corrected for borehole size from caliper
data taken every 5cm downhole using the
equation {2.737*({EPITHERM}/{THERMAL}-0.02)}*{-
• Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
1*Power(10,-06 )*Power({CAL},2)+0.0097*{CAL}0.0313}
• Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
Chip/mud samples were collected 2m in
non-target areas and then 1m in the zones
of interest (i.e. the target Kanaka Beds).
• All samples are geologically logged
compliant with industry standards which
Logging
Criteria
JORC Code explanation
Commentary
metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
included lithology, mineralogy, grain
size/rounding/sorting, colour, redox.
• All samples were photographed using a
high-resolution camera.
• The total length and percentage of the
relevant intersections logged.
Subsampling
techniques
and sample
preparation
• If core, whether cut or sawn and
whether quarter, half or all core taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for instance
results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate
to the grain size of the material being
sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
• Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and precision
have been established.
Verification
of sampling
and
assaying
• The verification of significant
intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data.
Location of
data points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.
• The depth of investigation of the PFN tool
approximately 25-40 cm radius around the
borehole to allow for accurate
measurement of the ratio of
epithermal/thermal neutrons for pU3O8
calculations.
• QA/QC of pU3O8 data included repeatability
checks by regularly logging a fibreglasscased calibration hole onsite
(MRC002,723703E, 6324350N (GDA94),
depth 84.5m). MRC002 has sufficient assay
data in the target zone to compare/calibrate
PFN data.
• Repeat runs in rotary mud holes that
remained open after drilling for sufficient
time to allow for PFN logging was also
performed.
Three geophysical tools were used:
• Prompt Fission Neutron Tool (PFN) serial
number 22 manufactured by
Geoinstruments Inc, Nacogdoches, Texas.
Neutron generator 78-80kV, logging at
0.5m/minute.
• Multisurvey tool (MST) serial number 24
manufactured by Geoinstruments Inc,
Nacogdoches, Texas. Measures 16Normal,
64Long borehole resistance, Point
Resistance, and Self Potential and
uncalibrated natural gamma for depth
matching.
• GeoVista 3-arm caliper, serial number 5589,
measures the bore-hole size in millimetres
for the length of the bore hole.
• QA/QC of pU3O8 data included repeatability
checks by regularly logging a fibreglasscased calibration hole onsite
(MRC002,723703E, 6324350N (GDA94),
depth 84.5m). MRC002 has sufficient assay
data in the target zone to compare/calibrate
PFN data.
• Natural gamma (on the caliper tool) was
used for depth matching the PFN.
• No wireline stretch was observed during the
program.
• Drillholes are sited using a Garmin
handheld GPS
• Drilled holes are surveyed Leica iCON GPS
60 which uses the 4G network to obtain
corrections from SmartNet base stations
Criteria
JORC Code explanation
Commentary
• Specification of the grid system used.
(Continuously Operating Reference
Stations (CORS)) located around
Whyalla. The SmartNet corrections result
in RTK RMS accuracy of 10-20mm in XY
and 20-30mm in Z.
• Grid system GDA94 Projection 53H
• Quality and adequacy of topographic
control.
Data
spacing and
distribution
• Data spacing for reporting of
Exploration Results.
• Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Whether sample compositing has been
applied.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
• Drill spacing varies from 50x100m,
200x200m, 50 x 25m and 200 x 200m
centres as program was designed to
validate historical drilling and infill where
there is sparse historical information.
• pU3O8 intercepts calculated above 0.5m
minimum thickness, >0.025% pU3O8
(250ppm pU3O8) with internal dilution
0.25m
• No compositing was applied.
• The Samphire mineralisation is interpreted
to be contained in horizontal to subhorizontal sequence of sediments and
underlying weathered granite. This
interpretation is derived from the significant
historic drilling and geological interpretation
of the area.
All drillholes are vertical which is appropriate
for the orientation of the mineralisation
Sample
security
• The measures taken to ensure sample
security.
• Rotary mud/chip samples are stored in
AGE’s secured storage facility in Whyalla.
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
No audits or reviews undertaken of sampling
techniques to date.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement
and land
tenure
status
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such
as joint ventures, partnerships,
overriding royalties, native title interests,
historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
Exploration
done by
other
parties
• Acknowled
Share your feedback
Discover