QUARTERLY ACTIVITIES
REPORT
FOR QUARTER ENDED 31 December 2015
Alligator Energy
HIGHLIGHTS
ABN 79140575604
Suite 3
36 Agnes Street
Fortitude Valley, QLD 4006
EXPLORATION
Preliminary assessment of assay results from shallow air-core drilling
completed
Moderate uranium anomalism (>50x background) detected over 2km
strike length at BT1 prospect. This anomalism enhances the prospectivity
of the BT-1 and BT-8 target areas
Beatrice Prospect returns moderately anomalous to medium grade
uranium mineralisation (up to 796ppm U3O8) in the regolith zone
extending 100m south of outcropping mineralisation
First pass reconnaissance drilling returns anomalous uranium (>100ppm
U3O8) and anomalous uranium decay products at BT9
Substantial radiogenic and lead isotope anomalies have now been
identified on the Beatrice Project area (R&D program) and will be further
analysed in the coming quarter
Ph: (07) 3852 4712
Fax: (07) 3852 5684
ASX Code: AGE
Number of Shares:
353.9M Ordinary Shares
8.0M Unlisted Options
Board of Directors:
Mr John Main
(Exec Chairman)
Mr Paul Dickson
(Non Exec. Director)
CORPORATE
Founding Director and CEO, Robert Sowerby, stands down but remains
involved in a part-time capacity focusing on Indigenous and Community
Relations and the Company’s Research and Development program
Subsequent to 31 December 2015, the Company advised Cameco
Australia Pty Ltd (Cameco) that it had completed the Stage 2 Contribution
requirements for the Beatrice Joint Venture. This ends the sole funding
period for Alligator unless Cameco elects to be diluted
Two non-executive directors completed subscription (post approval by
shareholders) for additional ordinary shares at the Rights Issue price
totalling $110,000
Mr Peter McIntyre
(Non Exec. Director)
Mr Andrew Vigar
(Non Exec. Director)
Mr Greg Hall
(Non Exec. Director)
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 31 December 2015
1
EXPLORATION
Beatrice Project
During the quarter Alligator Energy (ASX: AGE) received final assay results from the shallow air-core
drilling program undertaken in 2015 (ASX Announcement 15 December 2015). This program comprised
87 holes for 2,257 metres and was undertaken in three target areas, BT-4, Beatrice Prospect and BT-1
(Figure 1). Some reconnaissance drilling was undertaken at BT-9. Drill spacing was generally broad and
designed to identify the response from a large (>100Mlb U3O8) deposit. Air-core drilling is a shallow
drilling technique used primarily for first pass testing of an area for mineralization and geochemical
anomalies in the weathered bedrock/regolith zone. Holes were drilled through cover material and the soft
weathered bedrock/regolith “to refusal” when hard, fresh bedrock was encountered.
Uranium is a mobile element in the oxidized weathering zone. It is readily leached and remobilized
throughout the weathered bedrock/regolith zone. This results in a bigger and more easily detected
“footprint” that can be traced back to the primary mineralisation. It is anticipated that diamond drilling
would then be used to test the fresh bedrock beneath any large, coherent zone of strong uranium or decay
elements identified in the weathered bedrock/regolith, in particular where this extends beneath the
sandstone cover.
Figure 1: Drill collar locations at BT-4, BT-1, BT9 and Beatrice prospects.
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 31 December 2015
2
BT-1
At BT-1 drill holes were about 100 metres apart on lines approximately 1,000 metres apart.
Preliminary assessment of results:
Moderate uranium anomalism, more than 50 times background and greater than 50ppm U3O8, is evident in two
drill holes (BTA15-074 and BTA15-081) located adjacent to the Beatrice Fault zone. These holes are separated
by 1km. A broader zone of regolith anomalism defined by uranium assays 10 - 50 times background (1050ppm U3O8) extends for more than 2km along the Beatrice fault (Figure 2).
Strong uranium decay element anomalism was identified over a strike length in excess of 2km coincident with
this uranium anomaly and is open along strike. The associated radiogenic groundwater emanating from the
Beatrice Fault mark this area of anomalous uranium and uranium decay products as a significant regional
feature requiring further assessment.
The source of the uranium and its decay products may be from within the Beatrice Fault or from a large
mineralized zone under the Kombolgie sandstone immediately north of the Beatrice Fault.
Further assessment of the uranium decay elements results will be undertaken in early 2016. Alligator considers
that the techniques under development using uranium radiogenic isotope geochemistry have the potential to
discriminate between responses of major uranium mineralisation and “false” anomalies
Figure 2: BT1 and BT9 drill collars coloured by maximum downhole U3O8 value on SAM conductivity
background (MMC1VD)
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 31 December 2015
3
Beatrice Prospect
The aircore drilling program was designed to test for southerly extensions of known high grade uranium
mineralisation at surface. The target was defined by a coincident SAM conductor response and uranium in soil
samples extending several hundred metres south from the outcropping mineralization. Moderate uranium
anomalism up to medium grade mineralisation was intersected in holes BTA15-013 (1m@222ppm U3O8),
BTA15-014 (7m@311ppm U3O8), BTA15-015 (2m@598ppm U3O8), BTA15-016 (2m@358ppm U3O8), and
BTA15-019(1m@218ppm U3O8) (Figure 3).
Preliminary Assessment of Results:
Anomalism was primarily confined to the upper part of the regolith profile. This probably reflects secondary
dispersion from the outcropping mineralisation rather than the response from mineralisation extending under the
scree south of the exposed uranium.
Surface sampling, mapping and pitting undertaken around the known uranium outcrop showed it to be a narrow,
5-10m wide, 150m long, north-easterly trending zone of mineralisation (>1,000ppm U3O8) with a peak value of
9,491ppm U3O8. The mineralisation appears to be best developed at the intersection of this north east trending
structure and the north-south trending SAM conductor. Sulphur analyses of drill samples indicate the SAM
conductor is probably caused by sulphide in north-south trending zones. The intersections of these zones with
the NE trending structure fault zone is considered to be the locus of mineralisation. The results from the drilling
preclude the presence of a large (>100Mlb U3O8) uranium deposit at Beatrice and no further work is warranted.
However, additional small, high grade pods of uranium mineralisation may exist in the area. The north east
structure that hosts the Beatrice mineralisation is part of a broader structural zone that extends for over 20kms.
The intersection of this structure with other SAM conductors are evident and may represent targets for this style
of mineralisation.
Figure 3: Beatrice prospect showing 2015 drill collars coloured by maximum downhole U3O8 value, and the
extent of the north east trending surface mineralisation - on SAM conductivity background.
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 31 December 2015
4
BT-4
Eleven shallow (maximum depth 34 metres) holes were drilled at BT4 on three traverse lines to test a strong
and well-defined but alluvium covered SAM conductor target. Drilling showed a fault zone and alteration
accurately matched the location and extent of the SAM feature but no significant uranium was encountered. The
rock types encountered were not considered optimal hosts for uranium mineralisation. More favourable host
rocks are now interpreted to exist to the north of the area drilled. The BT-4 target is considered tested and no
follow work is planned (refer ASX release 22nd September 2015).
Reconnaissance drill testing- BT-9
The BT-9 prospect, located south east from BT1 was identified during the 2015 field season as a zone of very
high uranium decay elements in sandstone. First pass reconnaissance drilling was undertaken late in the field
season.
Laboratory assays showed up to 134ppm U3O8ppm and very high values of uranium decay elements in
schistose host rocks of the Cahill Formation. These are very encouraging results. The uranium decay element
target remains unclosed and has not been covered by a SAM survey.
The 2015 aircore drilling program completed the testing of targets in the exposed basement.
Tin Camp Creek Project
During the quarter the Company continued its program of sampling and analyzing samples of Kombolgie
sandstone for uranium decay isotopes on this project area. See R&D section below for more detail.
Mamadawerre JV Project
No substantial work was undertaken on the Mamadawerre JV Project area during the December quarter.
The Joint Venture agreement with Cameco Australia Pty Ltd (Cameco) required the Company to meet a
further $2 million (after the Initial Obligation Period) in eligible expenditure by 31 December 2015 in order
to earn a 40% interest in EL 24992. This expenditure threshold has not been met and Cameco has agreed
to an extension to 29 February 2016 in order to allow for the parties to consider the alternatives for the
Joint Venture.
Research and Development
Alligator’s R&D program is focused on developing innovative techniques for identifying and targeting
covered and fully preserved unconformity uranium deposits beneath the covering Kombolgie Sandstone. In
particular, investigations and experimentation is being undertaken on innovative applications of radiogenic
isotope geochemical testing and Sub Audio Magnetics (SAM) Geophysical techniques.
AGE continued with analysis of radiogenic isotopes of sandstone and groundwater during the quarter.
substantial radiogenic and lead isotope anomalies have now been identified on the Beatrice Project area.
These anomalies occur adjacent to the Beatrice Fault. A series of radiogenic isotope anomalies has now
been identified between Mintaka on the TCC project area through to BT-2 on the Beatrice JV project area,
a distance of over 30km. AGE is now investigating the nature of this anomalous structure. Understanding
the pathways that mobile radiogenic isotopes move through the Kombolgie Sandstone cover is now a
priority objective of the R&D program to determine the significance of anomalies.
New methods for processing SAM/TFEM geophysical data have also being investigated during the
quarter. Preliminary trials have been undertaken to develop 3d inversions of the TFEM data sets.
During the quarter the Company worked with its advisors to prepare the 2015 R&D Offset claim which was
then lodged with AusIndustry in January 2016.
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 31 December 2015
5
CORPORATE
Founding Director & CEO Resignation
Rob Sowerby, CEO and one of the founding directors of Alligator Energy, gave notice that he would cease full
time employment with the company effective 31 December 2015. He will however remain with the company in a
part time capacity and will be responsible for refining the application and interpretation of uranium decay
geochemical techniques and SAM geophysical techniques as well as for ongoing engagement with Arnhem
Land stakeholders.
Rob, has been instrumental in developing the company’s strategy and techniques for discovering large
unconformity style uranium deposits under the sandstone in the Alligator Rivers Uranium Province and for
developing relationships with Traditional Owners and other stakeholders in Arnhem Land.
Rob also stood down as a director after the AGM on 20 November, 2015.
As an interim measure, John Main has agreed to accept the role of Executive Chairman for no additional
compensation. In addition it was agreed that the Board will assume the CEO’s personnel, investor relations and
funding roles while Peter Moorhouse, Senior Geologist, will assume responsibility for all exploration
management duties.
Beatrice Project- Stage 2 Contribution
Alligator completed its Stage 2 sole funding contribution of a cumulative amount of $2million and
subsequent to 31 December 2015 advised Cameco accordingly. Cameco is currently in the process of
confirming that AGE has met the expenditure commitments and complied with the terms of the Farm-in and
Joint Venture Agreement. A Joint Venture Meeting will be scheduled to agree a future exploration program
and funding plan and to develop a budget for 2016. Once a budget has been approved, Cameco may elect
to contribute cash-calls at their 49% interest or agree to be diluted.
Fund Raising
Two non-executive directors, Peter McIntyre and Greg Hall, obtained shareholder approval at the AGM
(ASX Announcement 20 November 2015) to take up 2.75 million shares ($110,000) in the 2015 Rights
Issue shortfall. The shares were issued in December 2015 after receipt of the subscription funds.
Unlisted Option Expiry
During the Quarter, 6.25m unlisted options to acquire fully paid ordinary shares in the Company at an exercise
price of 20 cents per share expired without being exercised. These options had been issued to parties
associated with the listing of the Company on the ASX (ASX Announcement 25 November 2015)
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 31 December 2015
6
Competent Person’s Statement
Information in this report is based on current and historic Exploration Results compiled by Mr Rob Sowerby who is
a Member of the Australasian Institute of Geoscientists. Mr Sowerby was CEO and Director of Alligator Energy Ltd
until December 2015, and has sufficient experience which is relevant to the style of mineralisation and type of
deposit under consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the
2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.
Mr Sowerby consents to the inclusion in this release of the matters based on his information in the form and
context in which it appears.
About Alligator Energy
Alligator Energy Ltd is an Australian, ASX listed, exploration company with uranium exploration tenements in the
world class Alligator Rivers Uranium Province in Arnhem Land, Northern Territory. The Alligator Rivers Uranium
Province hosts nearly 1 billion pounds of high grade uranium resources and past production, including the Ranger
Mine and Jabiluka. Since listing in February 2011, the company has completed in excess of 15,000m of drilling,
defined a maiden high grade, JORC compliant resource at Caramal (6.5Mlb U3O8 at 3100ppm U3O8) and
discovered new mineralization at Mintaka and Orion East. High Grade mineralization also occurs at the historic
South Horn and Gorrunghar prospect which remain only partially tested.
2
The company has in excess of 1000km of Exploration Licence applications and is also in Joint Venture with
Cameco Australia Pty Ltd for the Mamadawerre Project and Beatrice Project, also within the Alligator Rivers
Uranium Province.
Project Location Diagrams and Exploration Licences
FOR FURTHER INFORMATION, PLEASE CONTACT
Mr John Main
Executive Chairman
Ian Howarth
Collins Street Media
0407 822 319
ian@collinsstreetmedia.com.au
Alligator Energy Ltd
Email: info@alligatorenergy.com.au
ALLIGATOR ENERGY QUARTERLY ACTIVITIES REPORT
FOR QUARTER ENDED 31 December 2015
7
Appendix 5B
Mining exploration entity quarterly report
Rule 5.3
Appendix 5B
Mining exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10
Name of entity
ALLIGATOR ENERGY LTD
ABN
Quarter ended (“current quarter”)
79 140 575 604
31 December 2015
Consolidated statement of cash flows
Cash flows related to operating activities
1.1
Receipts from product sales and related
debtors
1.2
Payments for (a) exploration & evaluation
(b) development
(c) production
(d) administration
Dividends received
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes (paid)/ received- R&D
Other (provide details if material)
1.3
1.4
1.5
1.6
1.7
Current quarter
$A’000
Year to date
$A’000
-
-
(1,225)
(260)
5
(2,495)
(475)
15
-
-
(1,480)
(2,955)
(8)
(8)
(38)
(38)
(1,488)
(2,993)
Net Operating Cash Flows
1.8
1.9
1.10
1.11
1.12
1.13
Cash flows related to investing activities
Payment for purchases of: (a) prospects
(b) equity investments
(c) other fixed assets
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
Loans to other entities
Loans repaid by other entities
Other - Security Deposits
Net investing cash flows
Total operating and investing cash flows
(carried forward)
+ See chapter 19 for defined terms.
17/12/2010 Appendix 5B Page 1
Appendix 5B
Mining exploration entity quarterly report
1.13
(1,488)
(2,993)
121
121
1,708
(41)
1,667
Net increase (decrease) in cash held
(1,367)
(1,326)
1.20
1.21
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
2,404
2,363
1.22
Cash at end of quarter
1,037
1,037
1.14
1.15
1.16
1.17
1.18
1.19
Total operating and investing cash flows
(brought forward)
Cash flows related to financing activities
Proceeds from issues of shares, options, etc.
Proceeds from sale of forfeited shares
Proceeds from borrowings
Repayment of borrowings
Dividends paid
Other - Capital Raising Costs
Net financing cash flows
Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the
related entities
Current quarter
$A'000
1.23
Aggregate amount of payments to the parties included in item 1.2
100
1.24
Aggregate amount of loans to the parties included in item 1.10
Nil
1.25
Explanation necessary for an understanding of the transactions
Directors’ fees, salaries and superannuation totalled $100k before amounts then used to subscribe for
ordinary shares in the Company under the Directors’ Fee Plan approved at the AGM on 20 November 2015
which totalled $10.5k
Non-cash financing and investing activities
2.1
Details of financing and investing transactions which have had a material effect on
consolidated assets and liabilities but did not involve cash flows
Nil
2.2
Details of outlays made by other entities to establish or increase their share in projects in
which the reporting entity has an interest
Nil
+ See chapter 19 for defined terms.
Appendix 5B Page 2
17/12/2010
Appendix 5B
Mining exploration entity quarterly report
Financing facilities available
Add notes as necessary for an understanding of the position.
3.1
Loan facilities
3.2
Credit standby arrangements
Amount available
$A’000
-
Amount used
$A’000
-
-
-
Estimated cash outflows for next quarter
$A’000
201
4.1
Exploration and evaluation
4.2
Development
-
4.3
Production
-
4.4
Administration
172
373
Total
Reconciliation of cash
Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows)
to the related items in the accounts is as follows.
5.1
Cash on hand and at bank
5.2
Deposits at call
5.3
Bank overdraft
5.4
Other (provide details)
Current quarter
$A’000
Previous quarter
$A’000
137
479
900
1,925
-
-
-
-
1,037
2,404
Total: cash at end of quarter (item 1.22)
Changes in interests in mining tenements
Tenement
reference
6.1
Interests in mining
tenements relinquished,
reduced or lapsed
NIL
6.2
Interests in mining
tenements acquired or
increased
NIL
+ See chapter 19 for defined terms.
17/12/2010 Appendix 5B Page 3
Nature of interest
(note (2))
Interest at
beginning
of quarter
Interest at
end of
quarter
Appendix 5B
Mining exploration entity quarterly report
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
Total number
7.1
7.2
7.3
7.4
7.5
7.6
7.7
Preference +securities
(description)
Changes during quarter
(a) Increases through
issues
(b) Decreases through
returns of capital, buybacks, redemptions
+Ordinary securities
Changes during quarter
(a) Increases through
issues
(b) Decreases through
returns of capital, buybacks
+Convertible debt
Number
quoted
NIL
NIL
350,896,873
350,896,873
269,231
39,427,183
-
269,231
39,427,183
-
NIL
NIL
securities (description)
Changes during quarter
(a) Increases through
issues
(b) Decreases through
securities matured,
converted
Options (description
and conversion factor)
700,000
1,000,000
2,205,882
2,035,648
2,035,648
-
7.8
Issued during quarter
-
-
7.9
7.10
Exercised during quarter
Expired during quarter
-
-
7.11
Debentures
(totals only)
Unsecured notes (totals
only)
NIL
NIL
NIL
NIL
7.12
Issue price per
security (see
note 3) (cents)
Amount paid
up per security
(see note 3)
(cents)
3.9 cents
4.0 cents
3.9 cents
4.0 cents
Exercise price
Expiry date
$0.15
$0.00
$0.00
$0.00
$0.00
7 Mar 2017
2 May 2017
26 Nov 2017
31 Jan 2016
21 April 2018
+ See chapter 19 for defined terms.
Appendix 5B Page 4
17/12/2010
Appendix 5B
Mining exploration entity quarterly report
Compliance statement
1
This statement has been prepared under accounting policies which comply with
accounting standards as defined in the Corporations Act or other standards
acceptable to ASX (see note 5).
2
This statement does give a true and fair view of the matters disclosed.
Mike Meintjes
Company Secretary
29 January 2016
Notes
1
The quarterly report provides a basis for informing the market how the entity’s
activities have been financed for the past quarter and the effect on its cash
position. An entity wanting to disclose additional information is encouraged to
do so, in a note or notes attached to this report.
2
The “Nature of interest” (items 6.1 and 6.2) includes options in respect of
interests in mining tenements acquired, exercised or lapsed during the
reporting period. If the entity is involved in a joint venture agreement and
there are conditions precedent which will change its percentage interest in a
mining tenement, it should disclose the change of percentage interest and
conditions precedent in the list required for items 6.1 and 6.2.
3
Issued and quoted securities The issue price and amount paid up is not
required in items 7.1 and 7.3 for fully paid securities.
4
The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of
Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.
5
Accounting Standards ASX will accept, for example, the use of International
Financial Reporting Standards for foreign entities. If the standards used do not
address a topic, the Australian standard on that topic (if any) must be complied
with.
== == == == ==
+ See chapter 19 for defined terms.
17/12/2010 Appendix 5B Page 5