Half Year Financial Report - 31 December 2015
Released
Released
Announcement PDF
ALLIGATOR ENERGY LIMITED
ACN 140 575 604
31 December 2015
HALF YEAR FINANCIAL REPORT
ALLIGATOR ENERGY LIMITED
ACN 140 575 604
CONTENTS
Page
Directors’ Report
3
Auditor’s Independence Declaration
9
Consolidated Statement of Profit or Loss and Other
Comprehensive Income
10
Consolidated Statement of Financial Position
11
Consolidated Statement of Changes in Equity
12
Consolidated Statement of Cash Flows
13
Notes to the Consolidated Financial Statements
14
Directors’ Declaration
18
Independent Auditor’s Review Report to Members
19
Competent Person’s Statement
21
CORPORATE OFFICE
Suite 3, 36 Agnes St
Fortitude Valley, QLD 4006
Tel: (07) 3852 4712
Fax (07) 3852 5684
Postal Address
PO Box 338
Spring Hill, QLD 4004
The information in this report should be read in conjunction with the Annual Report for the year
ended 30 June 2015 which is available from the Alligator Energy Limited website:
www.alligatorenergy.com.au
2
ALLIGATOR ENERGY LIMITED
ACN 140 575 604
DIRECTORS’ REPORT
The Directors of Alligator Energy Limited (the ‘company’, ‘Alligator’) and its controlled entities
(the ‘Group’) present their report, together with the financial statements of the Group, for the
half-year ended 31 December 2015.
Directors
The following persons were Directors of Alligator Energy Limited (‘Alligator’) during the halfyear and up to the date of this report, unless stated otherwise:
John Main
Paul Dickson
Andrew Vigar
Peter McIntyre
Gregory Hall
Robert Sowerby
Executive Chairman
Non-Executive Director
Non-Executive Director
Non-Executive Director
Non-Executive Director (appointed 24 July 2015)
CEO and Director (resigned as director on 20 November
2015 and as CEO on 31 December 2015)
Principal activities
The principal activity of the Group is mineral exploration. There has been no significant change
in the nature of the Group’s activities during the half year.
Dividends
There were no dividends paid to shareholders during the financial period.
Review of operations
(i)
Exploration and R&D activities
Beatrice Project
During the Half Year, a 3,500 metre shallow geochemical drilling program commenced was
conducted at the Beatrice Project area in the Alligator Rivers region of the Northern Territory.
The BT-1, BT-4 and Beatrice Prospect target areas were tested. These target areas are covered
by shallow alluvial and colluvial sediments. The air-core drilling program was designed to test
for anomalous geochemical responses and alteration under these sediments.
In December 2015, the Company received final assay results from the shallow air-core drilling
program. This program comprised 87 holes for 2,257 metres and was undertaken in three target
areas, BT-4, Beatrice Prospect and BT-1. Some reconnaissance drilling was undertaken at BT-9.
Drill spacing was generally broad and designed to identify the response from a large (>100Mlb
U3O8) deposit. Air-core drilling is a shallow drilling technique used primarily for first pass
testing of an area for mineralization and geochemical anomalies in the weathered
bedrock/regolith zone. Holes were drilled through cover material and the soft weathered
bedrock/regolith “to refusal” when hard, fresh bedrock was encountered.
3
ALLIGATOR ENERGY LIMITED
ACN 140 575 604
DIRECTORS’ REPORT
Review of operations (continued)
BT-1
At BT-1 drill holes were about 100 metres apart on lines approximately 1,000 metres apart.
Preliminary assessment of results:
Moderate uranium anomalism, more than 50 times background and greater than 50ppm U3O8, is
evident in two drill holes (BTA15-074 and BTA15-081) located adjacent to the Beatrice Fault
zone. These holes are separated by 1km. A broader zone of regolith anomalism defined by
uranium assays 10 - 50 times background (10-50ppm U3O8) extends for more than 2km along
the Beatrice fault.
Strong uranium decay element anomalism was identified over a strike length in excess of 2km
coincident with this uranium anomaly and is open along strike. The associated radiogenic
groundwater emanating from the Beatrice Fault mark this area of anomalous uranium and
uranium decay products as a significant regional feature requiring further assessment.
The source of the uranium and its decay products may be from within the Beatrice Fault or from
a large mineralized zone under the Kombolgie sandstone immediately north of the Beatrice
Fault.
Further assessment of the uranium decay elements results will be undertaken in early 2016.
Beatrice Prospect
The aircore drilling program was designed to test for southerly extensions of known high grade
uranium mineralisation at surface. The target was defined by a coincident SAM conductor
response and uranium in soil samples extending several hundred metres south from the
outcropping mineralization. Moderate uranium anomalism up to medium grade mineralisation
was intersected in holes BTA15-013 (1m@222ppm U3O8), BTA15-014 (7m@311ppm U3O8),
BTA15-015 (2m@598ppm U3O8), BTA15-016 (2m@358ppm U3O8), and BTA15019(1m@218ppm U3O8).
Preliminary Assessment of results:
Anomalism was primarily confined to the upper part of the regolith profile. This probably
reflects secondary dispersion from the outcropping mineralisation rather than the response from
mineralisation extending under the scree south of the exposed uranium.
Surface sampling, mapping and pitting undertaken around the known uranium outcrop showed it
to be a narrow, 5-10m wide, 150m long, north-easterly trending zone of mineralisation
(>1,000ppm U3O8) with a peak value of 9,491ppm U3O8. The mineralisation appears to be best
developed at the intersection of this north east trending structure and the north-south trending
SAM conductor. Sulphur analyses of drill samples indicate the SAM conductor is probably
caused by sulphide in north-south trending zones. The intersections of these zones with the NE
trending structure fault zone is considered to be the locus of mineralisation. The results from the
drilling preclude the presence of a large (>100Mlb U3O8) uranium deposit at Beatrice and no
further work is warranted.
However, additional small, high grade pods of uranium mineralisation may exist in the area. The
north east structure that hosts the Beatrice mineralisation is part of a broader structural zone that
extends for over 20kms. The intersection of this structure with other SAM conductors is evident
and may represent targets for this style of mineralization.
4
ALLIGATOR ENERGY LIMITED
ACN 140 575 604
DIRECTORS’ REPORT
Review of operations (continued)
BT-4
Eleven shallow (maximum depth 34 metres) holes were drilled at BT4 on three traverse lines to
test a strong and well-defined but alluvium covered SAM conductor target. Drilling showed a
fault zone and alteration accurately matched the location and extent of the SAM feature but no
significant uranium was encountered. The rock types encountered were not considered optimal
hosts for uranium mineralisation. More favourable host rocks are now interpreted to exist to the
north of the area drilled. The BT-4 target is considered tested and no follow work is planned.
Reconnaissance drill testing- BT-9
The BT-9 prospect, located south east from BT1 was identified during the 2015 field season as a
zone of very high uranium decay elements in sandstone. First pass reconnaissance drilling was
undertaken late in the field season.
Laboratory assays showed up to 134ppm U3O8ppm and very high values of uranium decay
elements in schistose host rocks of the Cahill Formation. These are very encouraging results.
The uranium decay element target remains unclosed and has not been covered by a SAM survey.
Farm-in and Joint Venture Agreement
The Company has now completed its Stage 1 expenditure obligation in order to earn 51% of the
Beatrice uranium project JV. The company is in the process of having the 51% interest
registered with the Northern Territory Department of Mines and Energy. Subsequent to the end
of the Half Year the Company also completed the Stage 2 Contribution expenditure. This
enables the Company to retain the 51% interest in the Project and brings to an end the sole
funding period unless Cameco Australia Pty Ltd elects to be diluted.
Tin Camp Creek Project
Radiogenic isotope sampling at TCC 4 in the Tin Camp Creek prospect during the 2014 field
season identified an anomaly in the Kombolgie Sandstone. Additional sampling of outcropping
sandstone and old reconnaissance drill holes in 2015 has shown the anomalism extends over
more than 2,000 metres. A peak response over 1,000 metres long was defined. Further
processing of geophysical data from the 2015 SAM survey has defined a coincident anomaly
associated with this radiogenic isotope anomaly.
The TCC4 will be considered when defining priority targets for drill testing in 2016.
Mamadawerre Project
No substantive work was undertaken on the Mamadawerre JV Project area during the Half Year.
The Joint Venture agreement with Cameco Australia Pty Ltd (Cameco) required the Company to
meet a further $2 million (after the Initial Obligation Period) in eligible expenditure by 31
December 2015 in order to earn a 40% interest in EL 24992. This expenditure threshold has not
been met and Cameco has agreed to an extension to 29 February 2016 in order to allow for the
parties to consider the alternatives for the Joint Venture.
5
ALLIGATOR ENERGY LIMITED
ACN 140 575 604
DIRECTORS’ REPORT
Review of operations (continued)
Research and Development
Alligator’s R&D program is focused on developing innovative techniques for identifying and
targeting covered and fully preserved unconformity uranium deposits beneath the covering
Kombolgie Sandstone. In particular, investigations and experimentation is being undertaken on
innovative applications of radiogenic isotope geochemical testing and Sub Audio Magnetics
(SAM) Geophysical techniques.
The Company continued with analysis of radiogenic isotopes of sandstone and groundwater
during the Half Year. Substantial radiogenic and lead isotope anomalies have now been
identified on the Beatrice Project area. These anomalies occur adjacent to the Beatrice Fault. A
series of radiogenic isotope anomalies has now been identified between Mintaka on the TCC
project area through to BT-2 on the Beatrice Project area, a distance of over 30km. The
Company is investigating the nature of this anomalous structure. Understanding the pathways
that mobile radiogenic isotopes move through the Kombolgie Sandstone cover is now a priority
objective of the R&D program to determine the significance of anomalies.
New methods for processing SAM/TFEM geophysical data have also being investigated.
Preliminary trials have been undertaken to develop 3D inversions of the TFEM data sets.
During the Half Year the Company worked with its advisors to prepare the 2015 R&D Offset
claim which was then lodged with AusIndustry in January 2016.
(ii)
Capital Raising
On 21 August 2015, the Company announced a 1:4 non-renounceable Rights Issue to existing
shareholders at an issue price of 4 cents per share. Acceptances of Entitlements and Additional
Shares by shareholders totaled $1,577,087. This constituted a 51% take-up of the shares offered
under the Rights Issue. The Rights Issue closed on 15 September 2015.
Acceptances of Entitlements were received for a total of 36,048,446 New Shares raising
$1,441,938. A number of shareholders who accepted their full Entitlement also applied for
Additional Shares under the Offer. Accordingly, 3,378,737 Additional Shares will also be issued
raising $135,149.
Two non-executive directors, Peter McIntyre and Greg Hall, collectively committed to taking up
2.75 million shares ($110,000) in the Rights Issue shortfall, subject to and conditional on
approval of the proposed subscriptions at the AGM as required under the ASX Listing Rules.
This approval was granted on 20 November 2015 and the shares were issued in early December
2015.
(iii)
Board of Directors and Management
Appointment of Greg Hall as Non-Executive Director
On 27 July 2015, the Board appointed Greg Hall as a non-executive director of the Company.
Greg joined the Company after more than 27 years’ experience as an executive in the resources
sector. His experience includes employment with large listed companies such as North, WMC
and Rio Tinto as well as listed juniors such as Toro Energy and Hillgrove Resources.
6
ALLIGATOR ENERGY LIMITED
ACN 140 575 604
DIRECTORS’ REPORT
Review of operations (continued)
Importantly, Greg has a deep understanding of the uranium sector through his role as Marketing
Manager for ERA/Rio Tinto Uranium and the evaluation/approval of WA’s first fully approved
uranium project (as MD and Non-Executive Director) with Toro Energy Ltd. His operational
uranium experience also includes roles as Mining Manager at Olympic Dam and Ranger
Uranium Mine.
Greg has a Bachelor of Engineering in Mining Engineering and is Past Board and Exco member
of the Australian Uranium Association.
Founding Director & CEO Resignation
Rob Sowerby, CEO and one of the founding directors of Alligator Energy, gave notice that he
would cease full time employment with the company effective 31 December 2015. He will
however remain with the company in a part time capacity and will be responsible for refining the
application and interpretation of uranium decay geochemical techniques and SAM geophysical
techniques as well as for ongoing engagement with Arnhem Land stakeholders.
Rob has been instrumental in developing the company’s strategy and techniques for discovering
large unconformity style uranium deposits under the sandstone in the Alligator Rivers Uranium
Province and for developing relationships with Traditional Owners and other stakeholders in
Arnhem Land.
Rob also stood down as a director after the AGM on 20 November, 2015.
As an interim measure, John Main has agreed to accept the role of Executive Chairman for no
additional compensation. In addition it was agreed that the Board will assume the CEO’s
personnel, investor relations and funding roles while Peter Moorhouse, Senior Geologist, will
assume responsibility for all exploration management duties.
(iv)
Financial
The loss for the consolidated group for the half-year was $1,218,323 (half-year to 31 December
2014: $414,155 loss). This loss includes an impairment write down in relation to the capitalised
exploration expenditure for the Mamadawerre Project of $699,072 (see Note 5).
The Company has retained a close focus on corporate overheads during the Half Year and this is
evident with cash outflows to suppliers and employees dropping from $527k for the 2014 Half
Year to $475k in 2015. In this regard shareholders at the AGM once again approved a Directors’
Fee Plan for 2015/16 which enables the Company to issue shares in lieu of director fee payments
(at the election of directors on a quarterly basis) in order to further conserve cash.
Expenditure on fieldwork and exploration activities during the Half Year totalled $2,311,176 and
related principally to work conducted at the Beatrice Project.
7
ALLIGATOR ENERGY LIMITED
ACN 140 575 604
DIRECTORS’ REPORT
Matters subsequent to the end of the half year
Subsequent to 31 December 2015, the Company notified Cameco that it had met the Stage 2 sole
funding contribution of a cumulative amount of $2 million. Cameco has confirmed in writing
acceptance of the Company meeting this milestone. A Joint Venture Meeting will now be
scheduled to agree the future exploration program and funding plan and to develop a budget for
2016. Once a budget has been approved, Cameco may elect to contribute cash-calls at their 49%
interest or agree to be diluted.
On 27 January 2016, the Company issued 2,045,454 ordinary shares to the directors or their
nominees under the terms of the Directors’ Fee Plan approved by shareholders on 20 November
2015. This share issue related to $45,000 in directors’ fees for the December 2015 quarter.
On 12 February 2016, the Company advised that it had completed its Stage 2 expenditure
obligations in order to retain its 51% of the Beatrice uranium project JV Project. The Company
received confirmation from Cameco Australia Pty Ltd Cameco that the obligations under the
agreement have been satisfied.
No other matter or circumstance has arisen since 31 December 2015 that has significantly
affected, or may significantly affect;
a) The Group’s operations in future financial years, or
b) The results of those operations in future financial years, or
c) The Group’s state of affairs in future financial years.
Auditor’s Independence Declaration
A copy of the auditor’s independence declaration as required under section 307C of the
Corporations Act 2001 is set out on page 9.
This report is made in accordance with a resolution of Directors.
John Main
Executive Chairman
Brisbane, 22 February 2016
8
AUDITOR’S INDEPENDENCE DECLARATION
UNDER SECTION 307C OF THE CORPORATIONS ACT 2001
TO THE DIRECTORS OF ALLIGATOR ENERGY LIMITED
I declare that, to the best of my knowledge and belief, during the half-year ended 31 December 2015,
there have been:
(a)
no contraventions of the auditor independence requirements of the Corporations Act 2001 in
relation to the review; and
(b)
no contraventions of any applicable code of professional conduct in relation to the review.
PKF HACKETTS AUDIT
Liam Murphy
Partner
Brisbane, 22 February 2016
9
ALLIGATOR ENERGY LIMITED
ACN 140 575 604
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER
COMPREHENSIVE INCOME
FOR THE HALF-YEAR ENDED 31 DECEMBER 2015
31 December
2015
$
31 December
2014
$
12,702
39,198
(13,560)
(112,982)
(118,774)
(89,536)
(40,201)
(6,227)
(31,018)
(43,208)
(17,890)
(4,395)
(36,207)
(699,072)
(17,955)
(8,500)
(86,540)
(98,550)
(61,704)
(36,567)
(9,688)
(26,082)
(32,908)
(23,839)
(13,954)
(38,389)
(1,215)
(15,417)
(1,218,323)
(414,155)
-
-
(1,218,323)
(414,155)
-
-
(1,218,323)
(414,155)
Profit/(loss) attributable to members of the
parent entity
(1,218,323)
(414,155)
Total comprehensive income/(loss) attributable
to members of the parent entity
(1,218,323)
(414,155)
Cents
Cents
(0.37)
(0.37)
(0.15)
(0.15)
Note
Other income – interest
Accounting and audit fees
Consultants and professional fees
Directors’ fees
Employee benefits expense
Share-based payments
Depreciation
Occupancy expenses
Stock exchange and share registry fees
Investor relations
Travel and accommodation expenses
Insurance
Impairment of E&E costs
Other expenses
Loss before income tax
5
Income tax benefit
Profit /(loss) for the period
Other comprehensive income
Total comprehensive income/(loss) for the
period
Earnings per share for loss from continuing
operations attributable to the ordinary equity
holders of the company
Basic profit/( loss) per share
Diluted profit/(loss) per share
The accompanying notes form part of these financial statements.
10
ALLIGATOR ENERGY LIMITED
ACN 140 575 604
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
AS AT 31 DECEMBER 2015
Note
31 December
2015
$
30 June
2015
$
ASSETS
Current Assets
Cash and cash equivalents
Trade and other receivables
Inventory
1,036,732
66,123
28,935
2,363,512
72,321
51,983
Total Current Assets
1,131,790
2,487,816
Non-Current Assets
Trade and other receivables
Property, plant and equipment
Exploration expenditure
237,261
234,944
20,439,260
237,261
256,373
18,827,156
Total Non-Current Assets
20,911,465
19,320,790
Total Assets
22,043,255
21,808,606
150,034
404,148
Total Current Liabilities
Non-Current Liabilities
Provisions
150,034
404,148
159,539
159,539
Total Non-Current Liabilities
159,539
159,539
Total Liabilities
309,573
563,687
21,733,682
21,244,919
27,680,082
83,794
(6,030,194)
26,013,197
426,817
(5,195,095)
21,733,682
21,244,919
5
LIABILITIES
Current Liabilities
Trade and other payables
Net Assets
EQUITY
Contributed equity
Reserves
Accumulated losses
Total Equity
6
The accompanying notes form part of these financial statements.
11
ALLIGATOR ENERGY LIMITED
ACN 140 575 604
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
FOR THE HALF-YEAR ENDED 31 DECEMBER 2015
Contributed
equity
$
Options
Reserve
$
Accumulated
Losses
$
Balance at 1 July 2014
Total comprehensive
income/(loss) for the period
Transactions with owners in
their capacity as owners:
Contributions of equity, net of
transaction costs
Share options – value of expense
Options lapsed
Issue of ordinary shares
Capital raising costs
22,200,940
458,233 (4,468,554)
Total
$
18,190,619
-
-
(414,155)
(414,155)
4,042,735
(288,978)
36,567
(48,000)
-
48,000
-
36,567
4,042,735
(288,978)
Balance at 31 December 2014
25,954,697
446,800 (4,834,709)
21,566,788
Balance at 1 July 2015
26,013,197
426,817 (5,195,095)
21,244,919
-
- (1,218,323)
(1,218,323)
Total comprehensive
income/(loss) for the period
Transactions with owners in
their capacity as owners:
Contributions of equity, net of
transaction costs
Share options – value of
expense
Options lapsed
Issue of ordinary shares
Capital raising costs
-
-
-
-
1,708,087
(41,202)
40,201
(383,224)
-
383,224
-
40,201
1,708,087
(41,202)
Balance at 31 December 2015
27,680,082
83,794 (6,030,194)
21,733,682
The accompanying notes form part of these financial statements.
12
ALLIGATOR ENERGY LIMITED
ACN 140 575 604
CONSOLIDATED STATEMENT OF CASH FLOWS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2015
31 December
2015
$
31 December
2014
$
Receipts
Interest received
Payments to suppliers and employees
R&D Tax Offset
NTGS Collaborative Grants Received
15,047
(475,214)
-
26,379
(527,826)
558,333
35,000
Net cash inflow(outflow) from operating activities
(460,167)
91,886
Payments for exploration expenditure
(Payments for)/Refunds of security deposits
(Purchase of) / Proceeds from sale of property, plant
and equipment
(2,494,986)
(38,511)
(2,831,818)
(81,493)
Net cash inflow(outflow) from investing activities
(2,533,497)
(2,913,311)
Proceeds on issue of shares
Payment of capital raising costs
1,708,087
(41,203)
4,042,735
(288,978)
Net cash inflow(outflow) from financing activities
1,666,884
3,753,757
Net increase (decrease) in cash held
Cash at beginning of financial period
(1,326,780)
2,363,512
932,332
2,048,744
Cash at the end of financial period
1,036,732
2,981,076
Cash flows from operating activities
Cash flows from investing activities
Cash flows from financing activities
The accompanying notes form part of these financial statements.
13
ALLIGATOR ENERGY LIMITED
ACN 140 575 604
NOTES TO THE FINANCIAL STATEMENTS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2015
Note 1
Summary of significant accounting policies
Basis of preparation of half-year financial statements
These consolidated interim financial statements and notes represent those of Alligator Energy
Limited (the Company) and Controlled Entities (the Group). Alligator Energy Limited is a
publicly listed company incorporated and domiciled in Australia.
These general purpose interim financial statements for the half-year reporting period ended 31
December 2015 have been prepared in accordance with requirements of the Corporations Act
2001 and Australian Accounting Standard AASB 134: Interim Financial Reporting. The Group
is a for-profit entity for financial reporting purposes under Australian Accounting Standards.
The financial statements are presented in Australian dollars.
This interim financial report is intended to provide users with an update on the latest annual
financial statements of the Group. As such, it does not contain information that represents
relatively insignificant changes occurring during the half-year within the Group. It is therefore
recommended that this financial report be read in conjunction with the annual financial
statements of the Group for the year ended 30 June 2015, together with any public
announcements made during the half-year. These interim financial statements were authorised
for issue on 22 February 2016.
Accounting Policies
The same accounting policies and methods of computation have been followed in this half-year
financial report as were applied in the most recent annual financial statements, except in relation
to the matter discussed below.
Accounting for farm-in costs
Farm-in costs incurred in relation to the Beatrice project have been included in capitalised
exploration expenditure as acquisition costs under AASB 6. This practice will continue until the
sole funding period has ended.
New and revised accounting requirements applicable to the current half-year reporting
period
The Group has adopted all of the new and revised Standards and Interpretations that are relevant
to its operations and effective for the current half year. Adoption has not resulted in any changes
to the Group’s accounting policies and has no effect on the amounts reported for the current or
prior half-years.
Going Concern
The directors have adopted the going concern assumption when preparing the financial
statements. This assumption has been adopted on the basis that the Group is able to continue to
raise further capital and/or enter joint ventures. Expenditure budgets have also been curtailed to
fit with current cash reserves and the Company currently has limited fixed overheads. The
outcome of an R&D Offset claim application for the 2015 tax year is pending and this is
expected to bolster the cash reserves available to the Company. On this basis the directors
believe that the Group will be able to continue to meet its obligations as and when they fall due
over the next twelve months.
14
ALLIGATOR ENERGY LIMITED
ACN 140 575 604
NOTES TO THE FINANCIAL STATEMENTS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2015
Note 1
Summary of significant accounting policies (continued)
Given the increased level of uncertainty around future funding requirements in the current
environment, the greenfield stage of exploration activity and the difficulty in forecasting cash
flows for the group and the other matters described above and below, there is significant
uncertainty that the Group will realise the carrying value of capitalised exploration expenditure
in the normal course of business and at the amounts stated in the financial report. No
adjustments have been made relating to the recoverability of capitalised exploration expenditure
asset amounts that might be necessary should the Group not raise the necessary funding.
Note 2
Critical accounting estimates and judgements
Estimates and judgements are continually evaluated and are based on historical experience and
other factors, including expectations of future events that may have a financial impact on the
entity and that are believed to be reasonable under the circumstances.
Critical judgements in applying the entity’s accounting policies
The Group has capitalised exploration expenditure of $20,439,260 (30 June 2015: $18,827,156).
This amount includes costs directly associated with exploration and the purchase of exploration
properties. These costs are capitalised as an intangible asset until assessment and/or drilling of
the permit is complete and the results have been evaluated. These direct costs include employee
remuneration, materials, rentals, camp costs and payments to contractors for services such as
drilling and geotech surveys. The expenditure is carried forward until such a time as the area
moves into the development phase, is abandoned or sold. Given exploration activities have not
yet reached a stage which permits a reasonable assessment of the existence or otherwise of
recoverable resources and the difficulty in forecasting cash flows to assess the fair value of
exploration expenditure there is uncertainty as to the carrying value of exploration expenditure.
The ultimate recovery of the carrying value of exploration expenditure is dependent upon the
successful development and commercial exploitation or, alternatively, sale of the interest in the
tenements. The Directors are of the opinion that the exploration expenditure is recoverable for
the amount stated in the financial report.
Provision for site restoration
The Group estimates the cost of rehabilitating disturbances as a result of exploration activity.
These estimates are based on the requirements of current legislation, comprise an estimate of the
external costs to rehabilitate and are consistent with the amounts reported to the Department of
Mines and Energy in the Northern Territory.
Note 3
Segment information
The group operates solely within one business segment, being the mining and exploration
industry in Australia.
Note 4
Dividend
No dividend has been paid during the half-year ended 31 December 2015 and none is proposed.
15
ALLIGATOR ENERGY LIMITED
ACN 140 575 604
NOTES TO THE FINANCIAL STATEMENTS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2015
Note 5
Exploration expenditure
Exploration phase property costs
Geological, geophysical, drilling and other expenditure – at
cost
The capitalised exploration expenditure carried forward has
been determined as follows:
Opening balance – 1 July
Expenditure incurred or tenements acquired during the
period
R&D Tax Offset/ NTGS Collaborative Grant
Impairment write down
31 December 2015
30 June 2015
20,439,260
18,827,156
18,827,156
2,311,176
15,622,265
3,676,964
(699,072)
20,439,260
(470,858)
(1,215)
18,827,156
The Group assesses whether there are indicators that assets, or group of assets, may be impaired
at each reporting date. The following impairment indicators were identified during the half-year:
• minimal expenditure had occurred on the Mamadawerre JV and Mamadawerre East
tenements during the Half Year. In addition, the Company has prioritised exploration
activity at the Beatrice and TCC Project areas for 2016.
• The Farm-in and Joint Venture Agreement with Cameco is due to expire on 29 February
2016 and the Company has failed to meet its expenditure obligations.
Where an indicator of impairment exists, a formal estimate of the recoverable amount is made.
Total impairment charges recognised in the Consolidated Statement of Comprehensive Inc
Share your feedback
Discover