Alligator Energy (ASX: AGE, ‘Alligator’ or ‘the Company’) is pleased to announce an updated
Mineral Resource Estimate (MRE) resulting from AGE’s 2024 resource drilling campaign at the
Blackbush Deposit (Figure 1) within Alligator’s Samphire Project, South Australia.
Highlights
•
The Samphire Project 2024 resource drilling has been successful in increasing the quantum
and integrity Blackbush MRE:
The Indicated portion of the MRE has further increased by 10% from the previous Mineral
Resource Estimate to 14.2Mlbs at an average grade of 786ppm U3O8 – a 135% increase
since commencement of AGE’s resource drilling at Blackbush in 2022. 1
The Indicated Resource is now of a size and integrity ready for detailed well field designs
and may allow an increase in the production rate upwards from 1.2Mlbs pa (Updated
Scoping Study 2) to be targeted during the planned Definitive Feasibility Study (to be
confirmed in first phase of the Study), as 78% of the metal in the total MRE is now classified
as Indicated.
The Total MRE has increased by 3% to 18.0 Mlbs at an average grade of 676ppm U3O8
0.5Mlbs were added to the Total resource, and 1.3Mlbs were converted to Indicated
Resource Category.
Increases in the Total Resource outside the previous resource envelope were partially offset
by decreases within the resource envelope due to refinement / re-interpretation of the mineral
resource model ready for well-field design. This has resulted in further conversion of mineral
resource into the indicated category and an increase in the average grade reflecting an
increased accuracy and integrity of the mineral resource for the Blackbush deposit.
•
In summary, at 250ppm cut-off grade the Blackbush MRE now stands at an Indicated Mineral
Resource of 14.2Mlbs at 786ppm and an Inferred Mineral Resource of 3.8Mlbs at 443ppm, totalling
18.0Mlbs at 676ppm U3O8 – Refer table page 4.
•
Future work Program drilling to now focus on the Plumbush prospect13, and the Blackbush
Extension to the south. This work is subject to successful completion of access arrangements and
heritage survey work.
Greg Hall, Alligator CEO, said: “The detailed resource model refinement and re-interpretation and
corresponding increased accuracy and integrity reflects the move from Scoping Study to planned
Definitive Feasibility Study during and post the upcoming Field Recovery Trial. A higher level of
resource integrity and accuracy is required for initial wellfield designs that will be undertaken during the
first stage of the Feasibility Study. The team has identified continuing potential resource extensions in
south ward heading channels, and the first review of the Plumbush prospect has been undertaken with
1 AGE ASX Release 1 September 2022 02562683.pdf (weblink.com.au)
2 AGE ASX release 14 December 2023 https://wcsecure.weblink.com.au/pdf/AGE/02753924.pdf
planned initial drilling to bring this into a future potential resource, subject to access arrangements being
finalised.”
Blackbush Mineral Resource Estimate (MRE) Update Summary
This MRE was prepared by AMC Consultants (Perth) using historical UraniumSA Ltd (UraniumSA)
drilling data and AGE rotary-mud/sonic drilling data 3 acquired in 2021-2024. Uranium grades have been
determined by a combination of downhole prompt fission neutron (PFN) and downhole gamma
geophysical sonde measurements.
The updated MRE (Table 1) has been reported in accordance with the Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) and reports only that portion
which has been assessed by AGE as amenable to ISR within the Kanaka Beds of the Samphire
Palaeochannel at Blackbush.
Prior to the addition of the 2024 drilling data, the total Indicated Mineral Resource was 12.9Mlb (now
14.2Mlbs) with the remaining estimate comprising an Inferred Mineral Resource of 4.6Mlb 4 (now
3.8Mlbs). Inclusion of the 2024 data combined with further refinement/re-interpretation in some areas
has resulted further conversion of mineral resource into the indicated category and an increase in the
average grade reflecting an increased confidence and quality of the mineral resource for the Blackbush
Deposit.
Table 1: Blackbush Mineral Resource Estimate reported above a 250ppm U3O8 cut-off.
JORC Category
Mt
Grade
(U3O8 ppm)
U3O8 Metal
(Mlbs)
Indicated
8.2
786
14.2
Inferred
3.9
443
3.8
Total
12.1
676
18.0
The model is reported unconstrained and above a 250 ppm U3O8 lower cut-off grade for all zones in
consideration of potential for recovery by in situ leach processes.
There is no historical depletion by production within the model area.
Estimation of the disequilibrium factored and topcut gamma data (feU3O8c) is by ordinary kriging using
dynamic anisotropy for the mineralised zone.
Density is estimated by nearest neighbour estimation within the Kanaka Beds on the basis of logged geology
as either 1.79 t/m3 for lignitic material or 1.92 t/m3 for other sediments; other paleochannel stratigraphies
had a default of 1.90 t/m3 assigned; saprolite capping the basement granite was assigned a bulk density of
2.16 t/m3 and the primary basement granite was assigned a nominal bulk density of 2.70 t/m3.
The model assumes agglomeration of 12.5mE x 12.5mN x 1mRL parent blocks for definition of well fields for
production.
The model does not account for dilution, ore loss, hydrogeology, or recovery issues. These parameters should
be considered during the mining study as being dependent on the ISL treatment process.
Classification is according to JORC Code Mineral Resource categories.
Totals may vary due to rounded figures.
3 ASX Releases 31 Jan 2022 02480654.pdf (weblink.com.au) 29 March 2022 02503799.pdf (weblink.com.au); 10 May 2022 02520049.pdf
(weblink.com.au); 6 July 2022 https://wcsecure.weblink.com.au/pdf/AGE/02539224.pdf; 23 November 2022 02601769.pdf (weblink.com.au);
8 June 2023 02674241.pdf (weblink.com.au); 25 October 2023 02729807.pdf (weblink.com.au).
4 AGE ASX Release 7 December 2023; 02751141.pdf (weblink.com.au). Note information was sourced in this announcement from the
“Samphire Mineral Resource Estimate 2 March 2023, AMC Consultants Report. Competent Persons for the MRE was Mr Ingvar Kirchner
(AMC) and Dr Andrea Marsland-Smith (AGE) for QAQC and geology aspects related to the project.
Background
On 2 May 5 and 21 November 6 2024 AGE announced its results of infill resource drilling which was
focussed on potential extensions and converting additional ISR amenable Inferred Mineral Resource to
an Indicated category at the Blackbush deposit (Figure 1).
A total of 140 holes for 11,842m were drilled which successfully added an additional 1.1Mlbs to the
Indicated Mineral Resource category which increased from 12.9Mlbs to 14.0Mlbs at an average grade
of 786 ppm U3O8.This is an 8% increase from the previous indicated MRE 7 with no change in cut-off
grade which has remained at 250ppm U3O8.The increase is due to expansion of the Indicated mineral
resource footprint to the west and south west of AGE’s previous MRE (Figure 2) coupled with
reprocessing and re-interpretation of results discussed below.
Figure 1: Samphire Project Location Map
5 AGE ASX Release 2 May 2024 02802596.pdf (weblink.com.au)
6 AGE ASX Release 21 November 2024 02883594.pdf (weblink.com.au).
7 AGE ASX Release 7 December 2023; 02751141.pdf (weblink.com.au)
Figure 2: Collar locations (pre 2024 blue dots, 2024 in black dots) and current Indicated (red shell), Inferred (green shell) and
Unclassified (pale green shell) MRE.
Extensive reprocessing and reinterpretation of downhole geophysics and geological interpretation has
been performed as part of this MRE primarily to increase confidence in the understanding of the
following.
a) The dry bulk density variability and distribution within the host formation from newly acquired
downhole borehole nuclear magnetic resonance (BMR 8) data combined with a formation
Density sonde 9.
Density has a direct impact on the tenor of pounds when estimating a mineral resource. In
previous Blackbush MRE’s a single average density value was applied to calculate the MRE.
With the new BMR data obtained, a more robust density model has been used to calculate MRE
where 5 different density values have now been used based on re-logged geology overall lifting
the precision of the estimate.
b) The reliability of grade estimates from the downhole Prompt Fission Neutron (PFN) sonde 10
below 500ppm U3O8.
It has been identified that PFN data, previously treated as having an effective noise floor of
200ppm should more appropriately be treated as unreliable below 500ppm due to the low countrates of the tool below this grade level caused in part, by ageing tool hardware. Additionally,
8 https://www.orica.com/Products-Services/Digital-Solutions/wirebmr
9 https://borehole-wireline.com.au/formation-density-logging-
overview/#:~:text=Openhole%20formation%20density%20logging%20probes%20are%20designed%20to,measuring%20strip%20against%2
0the%20side%20of%20the%20borehole.
10 PFN sondes emit pulsed epithermal neutron into the host formation via a neutron generator which interact directly with the uranium isotope
235
U (a small and relatively stable fraction of 238U) via a fission reaction which generate thermal neutrons which is proportional to the amount
of uranium present. Uranium grade is thus derived from the ratio of epithermal and thermal neutrons and borehole size.
stacking and consideration of vertical data continuity is now required to remove statistical noise
to better reflect true formation conditions. To maintain confidence at the 250ppm U3O8 grade
cutoff it is technically prudent to re-examine the modelling technique for this and future MRE’s
to maintain and incrementally increase the integrity of the resource, especially in areas of grade
in the 250ppm-500ppm U3O8 range, as the Company focusses on developing the asset toward
definitive feasibility and Mining Lease application.
Using only reliable PFN data (pU3O8) paired with downhole gamma data from the gamma
sonde 11 (eU3O8), a disequilibrium factor 12 (DEF) model shown in Figure 3 was created to factor
the measured downhole eU3O8 into a more accurate estimate for actual U3O8. This factored
eU3O8 was used to create the final grade model. Consequently, Indicated and Inferred resource
classifications are driven by proximity to quality paired PFN and gamma data in addition to
regular classification criteria.
Figure 3: DEF Model (mean of 1.4 with higher DEF in red and lower than 1.4 DEF in blue) overlain on the 3D channel model
(yellow) for the Blackbush Paleochannel showing general trend of DEF > 1. 5 5x vertically exaggerated.
11
Downhole gamma sondes measure the daughter isotopes in the radioactive decay series, thus is not a direct reading of uranium in the
host formation if the gamma-emitting daughter isotopes are not in secular equilibrium with the parent 238Uranium. If the parent 238Uranium is
in secular equilibrium with the daughter isotopes the response of the natural gamma is directly proportional to the amount of uranium in the
host formation. Note: Typically for this style of uranium mineralisation, secular disequilibrium is the common situation where the uranium and
various decay daughter products move around significantly and variably over time with changes in water table, oxidation states and water
chemistry.
12
DEF = pU3O8/eU3O8 if DEF>1 parent 238Uranium is enriched relative to decay chain daughter isotopes, DEF <1 parent 238Uranium is
depleted relative to decay chain daughter isotopes. The basis for this process is that the gamma sonde measures gamma ray intensity from
the decay chain daughter isotopes, whereas the PFN sonde directly measures the 235U with a pulsed neutron source where the 235U
represents a small but relatively stable proportion of the 238U mineralisation
Future Work Program
Targeting mineral resource extension from the limits of the Inferred Mineral Resource envelope will be
the next focus for AGE’ forthcoming drilling campaigns (Figure 2) among other targets identified in
AGE’s Exploration Target Range 13 for the Samphire Project (subject to receipt of regulatory approvals).
Currently 64km of strike length of host palaeochannel has been mapped with only 10% densely drilled
(Blackbush Deposit and small portions of the historical Plumbush Prospect 14).
This includes:
a) A program has been planned to examine potential southern extensions to the Blackbush
uranium mineralisation (Figure 4) delineated by AGE’s 2024 drilling 15. In particular, the program
is planned to follow up key intercepts observed in BBRM24-338 (2.4m@1,948ppm pU3O8 from
56.7m), BBRM24-326 (1.0m@1,004ppm pU3O8 from 64.09m) and BBRM24-314 (0.6m@1,743
pU3O8 from 59.14m). This area immediately south of Blackbush forms part of the Blackbush
Extensions 1 Area of the Exploration Target Range.
b) A program to examine the Plumbush Prospect11 (Figure 4) where historical drillhole density is
currently 200-400m spacing. The initial drilling program aims to:
o
Validate some of the encouraging historical drilling results with the PFN tool, to quality
assurance and quality control the equivalent uranium intercepts, much the same AGE
has done with the Blackbush deposit over the last three years. The interpreted strike
length of the Plumbush channel is 4.85 km with several highly encouraging gamma
intercepts including drillholes MRM1033 (3.5m@1050ppm eU3O8 from 62.37m and
1.18m@1988ppm eU3O8 from 67.19m) MRM1080 (2.89m@2,600ppm eU3O8 from
65.66m) and MRM1004 (3.48m@800ppm eU3O8 from 61.13m), 16
o
Infill the current drill spacing to 100m centres around priority areas and test the limits of
the known mineralisation.
Following the initial programs at Blackbush Extension 1 and Plumbush, step out drilling to test areas in
the Central Channel where very little to no drilling has taken place in an areas interpreted to host
palaeochannels. The above programs are subject to completion of additional access arrangements,
additional heritage surveys and exploration program approvals.
13 AGE ASX Release 7 December 2023. 02751141.pdf (weblink.com.au)
14 UraniumSA ASX release 8 April 2011 “Maiden Resource Estimate Plumbush Deposit”.
https://announcements.asx.com.au/asxpdf/20110408/pdf/41xy4brvxj3d3c.pdf
15 AGE ASX release 21 November 2024. 02883594.pdf
16 Note: The reprocessing and geological reinterpretation of downhole geophysics that has been applied to drillhole data as part of this
Blackbush MRE has also been applied to Plumbush drillhole data.
Figure 4: Map of existing and planned drilling - Blackbush Extensions 1 Area & Plumbush Prospect.
ASX Additional MRE Technical Information
The following is a summary of the material information used to estimate the Mineral Resources as
required by Listing Rule 5.8.1 and JORC Code Reporting Guidelines.
Geology and Mineralisation
The Blackbush Deposit (Blackbush) is located within Exploration License (EL) 5926 (Figure 1). The
geological setting for mineralisation has been interpreted by AGE and AMC based on the historical
UraniumSA drilling and the infill rotary-mud and sonic core drilling programs completed by AGE through
to Q4 2024.
The uranium mineralisation at Blackbush occurs in horizontal tabular lenses (60-85m depth) in sanddominated basal sediments (Eocene Kanaka Beds) within a Tertiary paleochannel system. The
paleochannel is incised into a Proterozoic granite (Samphire Granite) which has a variably weathered
saprolite surface at its contact with the Kanaka Beds. The Kanaka Beds comprise cyclic fluvial quartz
dominated sands and gravels intercalated with silts and clays with fine grained carbonaceous material
towards the top of the sequence. The Kanaka Beds are overlain by the laterally continuous Miocene
Melton Limestone (marl and limestone), the clay dominated Pliocene Gibbon Beds and a cover of
Quaternary sediments (Figure 3).
Figure 5: Stylised Cross section 6324300 mN through the Blackbush Deposit (15x vertical exaggeration, depth in RL metres)
showing multi-level zones on simplified geology. Cross section constructed from pU3O8 intersections from AGE sonic core
hole BBRM22-034 17 and historic drilling eU3O8 intersections 18. Detailed stratigraphic section (modified after USA Internal
Report, 2012).
17 Drilling details including JORC Table 1 previously reported by Alligator Energy Ltd (ASX:AGE) in ASX release “Exceptional High-grade
uranium results from Samphire Uranium Project, SA” 29 March 2022. 02503799.pdf (weblink.com.au)
18
Historic drilling details including JORC Table 1 previously reported by Uranium SA (ASX:USA) in ASX release “Samphire Project Update”
27 September 2013, https://www.asx.com.au/asxpdf/20130927/pdf/42jnqgsn2cqcgg.pdf
The Blackbush uranium deposit follows the complex paleochannel system from north to south through
an oxbow-type bend to then run west to east. The cumulative strike length of the deposit is
approximately 2.7 km. Width of mineralisation measured across strike averages 300 m but widens in
some apparent tributary areas to widths up to 450 m. Mineralisation remains open in some areas along
the paleochannel. Figure 6 shows the extent of the known uranium mineralisation in the Blackbush
area 19.
The MRE for Blackbush has been classified as a combination of Indicated and Inferred material in
accordance with JORC Code guidelines and is based on the confidence levels of the key criteria. This
includes confidence in the geology, interpretations, revised data quality, data types, disequilibrium
factored gamma data, distribution of available 10 cm raw data pairs of eU3O8 and pU3O8, drilling density,
apparent grade and spatial continuity of the mineralisation, estimation quality, and stratigraphic position.
Only material within the Kanaka Beds is eligible for resource classification, with some poorly estimated
portions left as unclassified. The resource classification assumes potential exploitation by ISR mining
methods.
Figure 6: Samphire Blackbush uranium mineralisation general thickness and extent relative to paleochannel (image
courtesy AMC Consultants).
19 Note: the mineralisation is labeled as “zonecode=100” by AMC Consultants as shown in Figure 6.
Drilling Techniques
As used directly in the MRE, the database for the Blackbush deposit area contains a total of 759 vertical
drillholes (totalling 59.4 km of drilling) completed by UraniumSA from 2007 to 2012, and then AGE from
2021 to 2024 (Figure 5). All drillholes used in the MRE were vertical and comprise a combination of
rotary-mud (726), sonic core holes (14) and diamond core (5) and other hole types (14) for a total of
759 holes (62,045m).
Drill spacings are variable throughout the MRE area reflecting the different generations of drilling but
generally conform to drill spacing ranging from 25m, 50m, 100m and 200m. The data set for the
mineralised zones consists of intervals analysed by gamma data (99%), PFN data (50%) with some
overlap of both gamma data and PFN data where the PFN data exists. Chemical assay data has been
omitted for this MRE due to the relatively small data set from the mineralised zone.
Sampling and Sample Analysis
The principal sampling method to estimate uranium grade in all rotary-mud drillholes was downhole
geophysical logging using standard industry procedures to estimate eU3O8 from gamma sondes10 and
pU3O8 from the Prompt Fission Neutron (PFN) sondes9. Gamma data was collected at variable sample
intervals between 0.01m and 0.1m, whereas PFN logging data was collected at 0.01m sample intervals.
All sondes were calibrated using industry standard procedures at the Australian Mineral Development
Laboratories (AMDEL) calibration facility (Adelaide). There is some overlap of both gamma data and
PFN data where the PFN data exists.
Data composites for both eU3O8 and pU3O8 were generated using median sliding window filters (0.1m
for eU3O8 and 0.2 for pU3O8). Additional confidence constraints were placed on the pU3O8 before filtering
requiring data to be above 500ppm for at least 20cm to be considered above the tool detection limit
(LDL). LDL values are assigned 0ppm during filtering and composited values that are LDL are assigned
null for the purpose of disequilibrium calculation.
Dry Bulk Density (DBD) was calculated using outputs from downhole geophysical tools (Formation
Density sonde and Borehole Magnetic Resonance sonde). The Total Porosity and the Bed Resolution
Density (most appropriate density to use to avoid signal contamination through mineralisation) were
used to calculate the DBD in the Kanaka Beds in all drillholes where both sondes were used 20. Within
the Kanaka beds there are two DBD populations broadly described as sandy and sandy with fine
grained organics. These were assigned 1.92 t/m3 and 1.79 t/m3 respectively.
Resource Estimation and Methodology
Mineralised zone wireframes were based on the reinterpretation of all available historical and AGE
acquired geological and downhole geophysical data. An alternative approach to model design was used
for this MRE whereby 3D solid wireframes were created in LeapfrogTM 3D geological software by
constraining broader individual mineralisation lenses (zones) using primarily gamma data (eU3O8) at a
very nominal lower cut-off value of 100-150 ppm eU3O8 while also considering pU3O8 greater than 500
ppm.
Due to the curved nature of the paleochannel, uranium mineralisation, zonal interpretations orientations
were assigned to the block model for mineralised zones using a nearest neighbour estimation process
and a single pass, isotropic search radius of 150 m. A dynamic anisotropy approach was used to
20
𝐷𝐷𝐷𝐷𝐷𝐷 = 𝐵𝐵𝐵𝐵 − 𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇 ∗ 𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹_𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷 where fluid density = 1, BD is the bed resolution density, and TPOR is the total porosity.
constrain the variogram model orientations (where relevant) for all subsequent block estimates defined
below.
Local disequilibrium factors for the gamma data were modelled for the mineralised zones using a
reduced data set totalling 8,034 10 cm intervals from portions of 338 drillholes containing pairs of
gamma data grades and PFN data grades where the PFN data indicated U3O8 mineralisation grades
of greater than LDL (500ppm) and gamma data indicated grades of greater than 50 ppm. This has the
net effect of more positive disequilibrium factors for areas where the pU3O8 data confirm the existence
of U but provides less robust estimated disequilibrium factors for areas outside of those areas, including
some material that might be within the 250 ppm cut-off grade and the 500 ppm LDL for pU3O8 data.
The pU3O8 and eU3O8 data pairs were modelled using an inverse distance interpolation method and
power of 1 into 12.5mE by 12.5mN by 1mRL panels for each of the individual mineralised zone. These
panels were then assigned a calculated disequilibrium factor (DEF=pU3O8/eU3O8). This modelled DEF
was assigned to the raw data intervals and used to calculate the U3O8 value for final modelling of
“correcting eU3O8 for DEF”. Disequilibrium factors tended to be variable throughout the mineralised
zones with a lateral consistency in the main channel, neutral to low (negative) factors near the top of
the Kanaka Beds and a general increasing trend with depth.
Following assignment of the DEF to the eU3O8 data, the 10 cm interval “corrected eU3O8 for DEF” data
was composited again to larger 1 m composite using a residual retention process in preparation for the
estimation process. A three-dimensional directional experimental variogram was generated for the U3O8
(corrected eU3O8) with high-grade topcuts applied to the mineralised zone across the entire deposit.
The variogram was well structured with a low to moderate nugget variance of 30% and a major axis
range of 150 m.
The mineralised zones are predominantly constrained within the Kanaka Beds with some minor
peripheral overlap with Melton Sands above and saprolite/granite contact below. The block model used
the interpreted mineralised wireframe as a hard boundary in all cases. Uranium (U3O8) grade estimation
was subsequently completed using ordinary kriging (OK) using a slightly restricted search
neighbourhood and limited vertical smoothing. The MRE used the same panel size as used for the
disequilibrium modelling (i.e. 12.5 mE x 12.5 mN x 1 mRL) considering a typical production wellfield
drillhole spacing approaching 25 m x 25 m.
As part of AGE’s interpretation, the bulk density was also examined. Density is now estimated by
nearest neighbour estimation within the Kanaka Beds on the basis of logged geology as either 1.79 t/m3
for carbonaceous (“lignitic”) material or 1.92 t/m3 for other sediments. Other immaterial paleochannel
stratigraphic units have a default of 1.90 t/m3 assigned. Saprolite capping the basement granite was
assigned a bulk density of 2.16 t/m3 and the immaterial primary basement granite was assigned a
nominal bulk density of 2.70 t/m3.
Classification of the resource (Figure 7 and Figure 8) was performed using manually defined wireframes
applied exclusively to the Kanaka beds. Indicated classifications required geostatistically proximate
drillholes as well as measured disequilibrium data within 100m, while inferred classification required a
minimum number of proximate drillhole composites. The remaining volume of the mineralisation
wireframe was unclassified.
Figure 7: Mineral Resource classification at plan view -40 mRL (image courtesy of AMC Consultants)
Figure 8: Mineral Resource classification, Blackbush west to east section 6,324,300mN (view looking north). Vertical
exaggeration x5, depth in RL metres (image courtesy of AMC Consultants).
Relative Changes in Mineral Resource Estimates (November 2023 vs December 2024)
Relative changes in tonnage, grade and metal between this Mineral Resource Estimate and the
previous Mineral Resource Estimate14 relate to:
•
Ongoing extensional and infill drilling completed by AGE during 2024 resulting in identification
of additional mineralisation and modified interpretations for all mineralised zones and the deposit
stratigraphy.
•
Revision of PFN data in respect to its reliability of grade estimates 500ppm U3O8. This has
resulted in substantial changes to how the gamma and PFN data is prioritised, interpreted in the
grade model and the resource model has been classified.
•
Disequilibrium factors for gamma data changed with a substantial decrease in the amount of
useable gamma (eU3O8)/PFN (pU3O8) data pairs. The increased lower detection limit for pU3O8
of 500 ppm increases confidence in the final data model for grades greater than 500ppm U3O8,
while requiring the modified resource estimation technique and modified classification to
manage grades between the grade cutoff (250ppm U3O8) and 500ppm U3O8.
•
The dynamic anisotropy orientations have been modified slightly throughout the model area to
reflect the new drillhole data results and mineralisation trends.
•
Assigned bulk density values for the Kanaka Bed-hosted mineralisation are now variable (1.78
g.cc-1 to 1.92 t.m3) but marginally lower than the value used in the November 2023 Mineral
Resource (2.05 t.m3).
•
Mineral Resource classification as Indicated and Inferred Mineral Resource is now completed
by manually defined cross-section strings and three-dimensional wireframes.
This announcement has been authorised for release by the Alligator Energy Board.
Contacts
For more information, please contact:
Mr Greg Hall
Mr Mike Meintjes
CEO & Managing Director
Company Secretary
gh@alligatorenergy.com.au
mm@alligatorenergy.com.au
For media enquiries, please contact:
Alex Cowie
Media & Investor Relations
alexc@nwrcommunications.com.au
This announcement contains projections and forward-looking information that involve various risks and uncertainties regarding
future events. Such forward-looking information can include without limitation statements based on current expectations
involving a number of risks and uncertainties and are not guarantees of future performance of the Company. These risks and
uncertainties could cause actual results and the Company’s plans and objectives to differ materially from those expressed in
the forward-looking information. Actual results and future events could differ materially from anticipated in such information.
These and all subsequent written and oral forward-looking information are based on estimates and opinions of management
on the dates they are made and expressly qualified in their entirety by this notice. The Company assumes no obligation to
update forward-looking information should circumstances or management’s estimates or opinions change.
Competent Person’s Statement
The information in this announcement that relates to the Blackbush Mineral Resource estimate (uranium) is based on and
fairly represents information compiled by and generated by Mr Ingvar Kirchner, AMC Geology Manager (Perth) and a full-time
employee of AMC Consultants. Mr Kirchner is a Fellow of the Australasian Institute of Mining and Metallurgy (the AusIMM)
and a Member of the Australian Institute of Geoscientists (the AIG). Mr Kirchner has reviewed this Report and consents to the
inclusion, form and context relevant information herein as derived from the AMC Consultants Samphire Mineral Resource
estimate. Mr Kirchner has sufficient experience relevant to the style of mineralisation and type of deposit under consideration
and to the activity which is being undertaken to qualify as a Competent Person as defined by the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code).
The information in this announcement that relates drillhole data, QAQC and geology aspects related to the project is based
on and fairly represents information prov
Share your feedback
Discover