Alligator Energy Limited ASX: AGE (Alligator or the Company) is very pleased to advise that its
inaugural drilling program at the Big Lake Uranium Project (Big Lake), South Australia has resulted
in a significant new uranium discovery.
Highlights
•
Alligator’s drilling program has intersected significant thicknesses of anomalous
uranium mineralisation within interbedded palaeochannel sand units in the Namba
Formation.
•
The discovery is the first proof of concept that significant uranium is present within
the Lake Eyre basin sediments that lie above the hydrocarbon-rich Cooper Basin and
within potentially In-Situ Recovery (ISR) amenable host and depths.
•
So far 4 air-core drillholes have intersected palaeochannel sand units hosting
anomalous uranium mineralisation located between 90 m to 130 m below surface.
•
Using a calibrated portable X-ray fluorescence analyser (pXRF) on drill samples, initial
preliminary1 estimates of the tenor of uranium grades include:
o
AC24-021
20m @ 110 ppm U from 106m (inc. 1 m @ 241 ppm U from 123m)
1 m @ 185 ppm U from 129 m
o
AC24-022
5 m @ 130 ppm U from 107 m
o
AC24-023
5 m @ 45 ppm U from 104 m
o
AC24-025
10 m @ 120 ppm U from 180 m
•
The indicative grade-thickness of two intersections is at or near the economic cut off
used at the Company’s Samphire ISR uranium project near Whyalla, SA.
•
Indicative uranium grades found in these holes are approximately 10 to 50 times
background levels.
Cautionary Statement
The Company uses an Olympus DP-4050 portable X-ray Fluorescence (pXRF) analyser to screen aircore
drilling samples for mineralisation before submitting samples to a commercial laboratory for assay. This allows
for some understanding of the distribution of mineralisation prior to sampling to better ensure that samples
submitted for analysis are representative of the type and style of mineralisation sought. The pXRF provides
confirmation that mineralisation is present however it is not an accurate determination of the elemental
concentration within the sample analysed. Limitations include, very small analysis window, possible
inhomogeneous distribution of mineralisation, analytical penetration depth and possible effects from irregular
surfaces. The results obtained from the pXRF are indicative only and may not be representative of elemental
concentration within the material sampled. The pXRF readings are subject to confirmation by chemical analysis
1 All samples to be assayed for QA/QC purposes by and independent commercial laboratory post completion of the drill program.
1
from an independent laboratory. The Olympus DP- 4050 (S/N 550191) pXRF was calibrated on 7 February
2024 by Evident Australia using Alloy Certified Reference Material produced by Analytical Reference Material
International (ARMI).
Next Steps
•
Two further holes are currently being drilled within the limited heritage cleared area of
discovery. At the end of the program, all samples will be transported to Adelaide for
detailed laboratory assaying and analysis.
•
Following full analysis of data, including refinement of the geological model, Alligator
will commence approvals and initiate heritage clearances for follow-up drilling.
Alligator’s CEO Greg Hall stated: “This is the first significant greenfields discovery of uranium in
South Australia since the Samphire Uranium Project in 2007 by the company UraniumSA Ltd. The
thickness extent of mineralisation layers ranging up to 20m in these discovery holes is impressive
for this style of mineralisation. While estimated grades are still on the lower side, to have gradethickness intersections close to the cut-off used at our Samphire Project from the initial discovery
area is very encouraging.
The discovery appears to validate the uranium formation model developed by the previous Big Lake
geologists from whom Alligator acquired the initial tenement, and we acknowledge their work. The
sediments above the Cooper Basin cover are an extensive area, and we hope this has the potential
to develop into a new ISR amenable uranium field, similar to the Curnamona Province which hosts
the Beverley, Four Mile and Honeymoon deposits.
I would like to congratulate our exploration team: for their initial EM interpretation work on the project
back in 2019, the detailed seismic interpretation work carried out during 2022/23, and the planning,
logistics and safe drilling operations carried out to date. We are also very appreciative to the
Traditional Owners, pastoralists and other stakeholders in the region that have facilitated access for
our work.”
ASX: AGE
ASX: AGE
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | +61 (0) 7 3839 3904
info@alligatorenergy.com.au | www.alligatorenergy.com.au | Page 2 of 15
As documented in our ASX Release 17 July 20242, Big Lake’s inaugural drill program on Alligator’s
100% owned EL6367 reported evidence of potential paleochannel sands at drill-target “Site 10”
(Figure 1). Drilling resumed on 8 August 2024 in this area after a 3 week break due to rain affecting
access.
Figure 1: Alligator’s significant tenement holding over the southern Cooper Basin which comprise the Big Lake Project.
Area of current AGE drilling activities and location Site 10 denoted.
The objective of the inaugural program was to investigate the regions stratigraphy and the potential
for uranium mineralisation in the shallow basin sediments that lie above the hydrocarbon-rich Cooper
Basin; this setting having many attributes seen in other global hydrocarbon-related ISR uranium
fields around the world (refer Figure 2). A historical drilling program in the region by a previous
company (TC Developments) ~15 years ago indicated traces of uranium in thin clay bands in and
around existing oil and gas wells. None of these holes were drilled in palaeochannel features within
the upper (<300m) sedimentary sequence of the basin.
Figure 2: Basic conceptual model for the Big Lake Project.
2 AGE ASX Release 17 July 2024: Alligator Energy – Projects Update,
02828751.pdf (weblink.com.au)
ASX: AGE
ASX: AGE
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | +61 (0) 7 3839 3904
info@alligatorenergy.com.au | www.alligatorenergy.com.au | Page 3 of 15
AGE’s strategy is to specifically target the northern extensions of the same Tertiary Namba and Eyre
sedimentary formations which host the Beverley, Four Mile and Honeymoon In-Situ Recovery (ISR)
uranium mining operations in South Australia, south of the Big Lake project (Figure 2, ASX Release
17 May, 20243). The aim of this initial drilling program has been to target the shallower Namba
formation, with the objective of corroborating our seismic / airborne electromagnetic survey
interpretations of potential mineralisation-bearing palaeochannels. Site 10 was specifically targeted
to confirm the presence of an inferred palaoechannel and assess if this channel contained the key
ingredients of the model shown below.
Drilling at Site 10 has confirmed the presence of a paleochannel intersected in aircore holes AC24016, 017, 018, 021, 022, 023, 024 & 025 (Figure 3). Holes AC24-021 to 025, drilled since August 8,
encountered sizeable and correlatable interbedded oxidised and reduced palaeochannel sand units
in the Namba Formation between 90 m to 130 m depth. These units are commensurate with
significant thicknesses of anomalous uranium mineralisation in holes AC24-021, 022, 023 and
025 and cover an area over 7000 m2 (Figure 4).
Figure 3: Chip tray samples from AC24-025 showing 39m thick oxidised and reduced Namba palaeochannel sands.
3 AGE ASX Release 17 May 2024: Drilling Program Commences at the Big Lake Uranium Project, 02807913.pdf (weblink.com.au)
ASX: AGE
ASX: AGE
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | +61 (0) 7 3839 3904
info@alligatorenergy.com.au | www.alligatorenergy.com.au | Page 4 of 15
Using a calibrated4 portable X-ray fluorescence analyser on the aircore drill samples, initial
preliminary indicative uranium grades include:
o
AC24-021
20 m @ 110 ppm U from 106 m
(inc. 1 m @ 241 ppm U from 12 3m)
1 m @ 185 ppm U from 129 m
o
AC24-022
5 m @ 130 ppm U from 107 m
o
AC24-023
5 m @ 45 ppm U from 104 m
o
AC24-025
10 m @ 120 ppm U from 108 m
Of significance is the presence of oxidised and reduced sands in all holes drilled in this area
which is synonymous with roll-front uranium mineralising systems. This discovery is the first
proof of concept that significant uranium is present within the shallow basin sediments that
lie above the hydrocarbon-rich Cooper Basin and are within In-Situ Recovery (ISR) amenable
host environment and depths.
Two additional holes are currently being drilled from the limited existing heritage cleared area of
discovery and post this, samples will be transported to Adelaide for confirmatory laboratory assay
and geological analysis. Following full analysis of the data, including refinement of the geological
model, Alligator will commence approvals and heritage clearances for additional follow-up drilling.
Figure 4: Drillhole location map (Site 10) showing uranium grades (ppm) encountered in AGE’s drilling since August 8,
2024.
4
The Olympus DP- 4050 (S/N 550191) pXRF was calibrated on 7 February 2024 by Evident Australia using Alloy Certified Reference
Material produced by Analytical Reference Material International (ARMI).
ASX: AGE
ASX: AGE
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | +61 (0) 7 3839 3904
info@alligatorenergy.com.au | www.alligatorenergy.com.au | Page 5 of 15
Note: References above to XRF results relate to analysis using a portable hand-held device. This
portable device provides immediate analysis of modal mineralogy of drill samples. Unless otherwise
stated, values determined by XRF analysis are based on one spot reading per one metre of drill
sample. As such, results from XRF analysis are stated as estimates only and are preliminary to
subsequent confirmation (or otherwise) by geochemical laboratory analysis.
This released was authorised by Greg Hall, CEO and Managing Director.
Contacts
For more information, please contact:
Mr Greg Hall
Mr Mike Meintjes
CEO & Director
CFO & Company Secretary
gh@alligatorenergy.com.au
mm@alligatorenergy.com.au
For media enquiries, please contact:
Alex Cowie
Media & Investor Relations
alexc@nwrcommunications.com.au
Forward Looking Statement
This announcement contains projections and forward-looking information that involve various risks and
uncertainties regarding future events. Such forward-looking information can include without limitation
statements based on current expectations involving a number of risks and uncertainties and are not guarantees
of future performance of the Company. These risks and uncertainties could cause actual results and the
Company’s plans and objectives to differ materially from those expressed in the forward-looking information.
Actual results and future events could differ materially from anticipated in such information. These and all
subsequent written and oral forward-looking information are based on estimates and opinions of management
on the dates they are made and expressly qualified in their entirety by this notice. The Company assumes no
obligation to update forward-looking information should circumstances or management’s estimates or opinions
change.
Competent Person’s Statement
Information in this report is based exploration drilling results compiled by Dr Andrea Marsland-Smith who is a
Member of the AusIMM. Dr Marsland-Smith is employed on a full-time basis with Alligator Energy as Chief
Operating Officer, and has sufficient experience which is relevant to the style of mineralisation and type of
deposit under consideration (including 21 years in ISR uranium mining operations and technical work) and to
the activity she is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr MarslandSmith consents to the inclusion in this release of the matters based on her information in the form and context
in which it appears.
ASX: AGE
ASX: AGE
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | +61 (0) 7 3839 3904
info@alligatorenergy.com.au | www.alligatorenergy.com.au | Page 6 of 15
About Alligator Energy
Alligator Energy Ltd is an Australian, ASX-listed, exploration company focused on uranium and energy related
minerals, principally cobalt-nickel. Alligator’s Directors have significant experience in the exploration,
development and operations of both uranium and nickel projects (both laterites and sulphides).
Projects
ASX: AGE
ASX: AGE
ABN 79 140 575 604 | Suite 2, 128 Bowen St, Spring Hill, QLD 4000 | +61 (0) 7 3839 3904
info@alligatorenergy.com.au | www.alligatorenergy.com.au | Page 7 of 15
APPENDIX 1
JORC Code, 2012 Edition – Table 1 (Sections 1 & 2)
Section 1 – Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
•
Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of
sampling.
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that are Material to
the Public Report.
In cases where ‘industry standard’ work has been done this would
be relatively simple (e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to produce a 30
g charge for fire assay’). In other cases more explanation may be
required, such as where there is coarse gold that has inherent
sampling problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of detailed
information.
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic, etc) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by what method, etc).
•
Method of recording and assessing core and chip sample recoveries
and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
•
•
•
•
Drilling techniques
Drill sample
recovery
•
•
•
•
Logging
•
•
•
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
•
•
•
•
•
•
•
•
•
•
Results reported in this announcement relate to aircore (AC) drilling during the 2024 exploration program
on EL6367 at the Big Lake Uranium Project in the Lake Eyre/Cooper Basin Province, South Australia.
Sampling of the aircore drilling program involved the following components:
o
Drilling sample return is taken off the rig at 1 m intervals without any splitting. They are laid out in
numerically ordered labelled bags to avoid any confusion over intervals.
o
Following geological inspection, representative and non-composited 0.5-1 kg portions are taken
from the1 m samples (above) where there is: a change in geological horizon, mineralisation,
alteration assemblages or any other zone of interest.
o
Sampling is done over potential host sequences, with focus on the Namba Formation.
o
All samples are geologically logged, and natural gamma radioactivity level is measured with a RS230 BGO Super SPEC Gamma-Ray Spectrometer (May 2023)
Samples for assaying across the entire AC drilling program will be shipped to the same laboratory under
one batch. Laboratory sample preparation is described in the ‘quality of assay data’ section.
Drilling was contracted to Wallis Drilling of Western Australia. Using a Mantis 200 Automated Aircore
(AC), up to 40 holes were planned on 5 – 10-hole fences (cross-sectional lines of drillholes placed 50 –
200 m apart), with an average depth of 150 m.
Drill hole collar locations were positioned using a Garmin GPS with an approximate X-Y tolerance of 3 to
5 m.
Sample recovery from the AC drilling is monitored during drilling with an assessment made on the
volume and weight of material recovered relative to the drill interval. If AC sample recovery is poor, it is
logged as such. This is systematically recorded in the logging database.
Cross-interval contamination is assessed regularly but it is not possible to eliminate from AC drilling
process. However, no significant contamination issues have been encountered in this program.
For this program no apparent relationship was observed between sample recovery and grade. No
sample bias is expected.
Standard sample logging procedures are utilised, including logging codes for lithology, minerals, colour,
weathering etc.
A chip tray sample is taken for all 1 m intervals.
All chip trays are photographed for digital archiving.
Average natural gamma ray activity is measured for each sample. The instrument was purchased in
2023, pre-calibrated from counts to instrument-independent decay rate (µSv/hr). The conversion
accounts for specific instrument crystal volume, sensitivity, and dead-time.
Criteria
JORC Code explanation
Commentary
Sub-sampling
techniques and
sample
preparation
•
•
•
•
•
•
•
•
•
Quality of assay
data and
laboratory tests
•
•
•
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature, quality, and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the
in-situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
For geophysical tools, spectrometers, handheld XRF instruments,
etc, the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and precision have been
established.
•
•
•
•
•
Verification of
sampling and
assaying
•
•
•
•
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
•
•
•
•
•
Location of data
points
•
•
•
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
•
The AC drilling process does not generate core but chips and sediments of samples as returns
The chips are recovered at one-meter intervals via the cyclone – wet or dry
As per sampling section, ~ 0.5-1 kg samples are extracted from the one-meter interval bulk drill-return by
random scoops.
Samples for laboratory analysis are subsequently taken by hand picking random samples from the
respective bulk drill-return interval.
To ensure laboratory reliability, duplicates are taken at a minimum of every 25 samples.
As per announcement, estimates of uranium concentrations are based upon portable XRay fluorescence
(pXRF) spectroscopy measurements using an Olympus DP- 4050 (S/N 550191) previously calibrated on
7 February 2024 by Evident Australia. As part of the calibration, the instrument was verified using Alloy
Certified Reference Material produced by Analytical Reference Material International (ARMI), including
Uranium-bearing Standard OREAS 100a (135 ppm uranium from Mt Gee uranium prospect), with which
a pass was achieved (Certificate # 20166415, certified to 0.01%).
Upon completion of the current drilling program, samples will be sent under a single batch for complete
geochemical and elemental analyses by Bureau Veritas (BV), South Australia. This will follow BV’s
standard processing sequence:
o
Samples are pulverized to a maximum 3 mm grain size and then split to obtain separate aliquots
o
One aliquot with a minimum of 0.2 g for mixed acid digest with a mixture of nitric, perchloric and
hydrofluoric acids. Induction Coupled Plasma Mass Spectrometry (ICP- MS) is then employed to
detect concentrations of 42 elements (detection limits vary depending on the element).
o
Another aliquot is prepared and fused with lithium metaborate at high temperature. ICP – MS is
then employed to detect another ~ 30 elements, including rare earths (detection limits vary
depending on the element).
Bureau Veritas employs procedures in accordance with ISO 9001 Quality Management, including one in
twenty samples analysed in duplicate.
Alligator’s field geologists are supervised by the Project Lead / Senior Geologist
All field data is entered into excel spreadsheets (supported by look-up tables) at site and subsequently
validated on import into the centralized Access database.
Hard copies of logging and sampling data are stored in the local office and electronic data is stored on
the company server.
As an early exploration / part stratigraphic drilling program, twinning of results is not required. However,
all new data will be compared against legacy drill datasets, Alligator’s previous aircore drill data,
geophysical coverage etc, to check for a consistent picture, possible discrepancies in new and old data
and anomalies – leading to an enhanced picture of local prospectivity.
.
All coordinate information was collected using handheld GPS utilizing GDA 1994, Zone 54. While spatial
location is expected to be recovered within 3 – 5 m, it is possible that the elevation can be as much as 10
m out with respect to the currently established geoid.
Criteria
JORC Code explanation
Commentary
Data spacing and
distribution
•
•
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish
the degree of geological and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been applied.
•
The AC drill lines (or fences) of three to ten drillholes were strategically placed within the Big Lake Project
to:
o
Corroborate seismic/airborne electromagnetic (AEM) interpretations of potential mineralisation
bearing channels and host sequences (in this case, primarily the Namba Formation)
o
Test the quality and variability of potential host formation
o
Potentially make intercepts into host formations with indicators of uranium, uranium transport or
uranium deposition.
•
Drill traverses were generally designed to be orthogonal to the predicted course of interpreted
palaeochannels. However, this was impractical in many cases owing to:
o
Access restrictions due to oil and gas infrastructure or to minimise environmental disturbance.
o
Uncertainty of palaeochannel geometry at this early stage of exploration
o
Inherent ambiguity of datasets due to spatial resolution or penetration limitations (particularly for
AEM data in conductive cover terrain).
•
Company geologists supervise all sampling and subsequent storage in field and transport to point of
dispatch to the assay laboratory.
•
Orientation of data
in relation to
geological
structure
•
•
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known,
considering the deposit type.
If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
Sample security
•
The measures taken to ensure sample security.
Audits or reviews
•
The results of any audits or reviews of sampling techniques and
• As an inaugural drilling program audits or reviews of the sampling techniques were not undertaken.
data.
Section 2 Reporting of Exploration Results
Section 2 – Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
•
•
The Big Lake Project (Tenement Holder - Big Lake Uranium Pty Ltd, project operated by Alligator Energy
Ltd) is comprised of 7 exploration licences (EL 6367, EL 6847, EL 6848, EL 6849, EL 6902, EL 6903 and
EL 6904) covering 6,422km2. The initial licence - EL 6367 was granted on 22nd July 2019 for a two-year
period and covers an area of 818 km2. This licence was renewed for an additional three-years, expiring
July 2024. A further 6 licences were added to the project in 2022 and 2023. EL6367 covers part of the
Strzelecki regional reserve on its western side and parts of the Cooper Creek flood plain. The licence
also covered parts of 6 historical exploration leases, ELs 4068, 4069, 4071, 4072, 4073 and 4076
previously held by TC Development Corporation Pty Ltd between 2008 and 2013.
•
A Native Title Agreement for Mineral Exploration (NTMA) for Exploration between Big Lake Uranium Pty
Ltd and Yandruwandha Yawarrawarrka Traditional Landowners (Aboriginal Corporation) RNTBC (INC
3840) has been instrumented and endorsed (RI 53024) on 2 August 2023.The agreement covers EL
6367, EL 6847, EL 6849, EL 6902, EL 6903 and EL 6904.Hertitage sites in the area take the form of
registered sites, which the company has full understanding of the location, and are excluded from
exploration. Like any other jurisdiction, Alligator is required to protect heritage and archaeological sites
via work area clearances on an as-needs basis.
•
Alligator operates under an approved authorisation (Exploration Program for Environmental Protection
and Rehabilitation) with the SA Government.
•
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
Criteria
JORC Code explanation
Commentary
Exploration done
by other parties
•
•
Historic work across the tenement area (EL 6367) has predominantly focused on petroleum exploration
which actively commenced on-ground exploration in the mid-1960s. To date 424 petroleum wells have
been recorded within the licence boundary and active production is ongoing with processing taking place
at SANTOS’ nearby Moomba facility. Petroleum drilling across the tenement has provided valuable
uranium exploration data through gamma logs which are valuable for the construction of simplified
stratigraphic logging, however the primary focus of these holes lies much deeper than economic
uranium exploration targets. Petroleum drilling in the district typically targets stratigraphic horizons of the
Eromanga Basin approximately 1300m deep and Cooper Basin approximately 3000m deep.
•
Four 3D seismic surveys overlap parts of the licence giving almost total coverage.
Acknowledgment and appraisal of exploration by other parties.
Seismic Survey (Year conducted)
Moomba Big Lake 3D
(1997
Barina-Farina 3D
(1998)
Caladan-Daralingie 3D
(2001)
Greater Strzelecki 3D
(2001)
Over 1000 2D seismic profiles have been conducted across the exploration licence over the past 50
years. Quality of the 2D data varies with vintage, with those being shot from the mid 90’s onwards
generally the best datasets for geological interpretation. Since 2019 the SA government began
reprocessing open-file 2D seismic to generate pre-stack time and depth migrated datasets for the
Cooper Basin 2D cubed programme. 3855 lines have currently been reprocessed, 205 of which are
located within the Big Lake Project. This reprocessed data provides a filtered full-offset final migration
that enhances the data lower in the seismic profile, providing insights to possible fluid migration paths
beneath, and into, the stratigraphy targeted by AGE.
•
Aside from Petroleum exploration only modest mineral exploration has been conducted within the
licence. Uranium exploration was conducted by TC Development Corporation Pty Ltd who held 6
licences (EL4068, EL4069, EL4071, EL4072, EL4073 & EL4076) overlapping EL6367 amongst others in
the region. TC Development Corporation Pty Ltd held the licences between 2008 and 2013, with active
on-ground exploration conducted during 2008 and 2009.
•
On-ground exploration by TC Development consisted primarily of rotary mud drilling of 148 holes
totalling 20,584 m. These holes concentrated around historic gamma anomalies identified in petroleum
well logs. Hole depths range from 60 to 290 m depth and average 140 m targeting the Eyre Formation
proxim